OBLYTECH Logo
OBLYTECH Logo

Verify that Vulnerability Response integration imports completed

To confirm that a Vulnerability Response integration import completed, open the Integration Run Status dashboard, or open the run records for that integration and check that the latest run finished without errors. Then compare the number of records the run handled with the number in the source for the same scope before you rely on the data.

Where to find the run status for each integration

The Integration Run Status dashboard is the quickest way to see whether third-party integration runs have succeeded. It presents the status of third-party integration runs as a graphical view.

The Qualys and Rapid7 vulnerability integrations each have an integration run status dashboard, with its own chart reference. Read that reference before you judge a status from the picture alone. For Rapid7 setup details, see Rapid7 InsightVM integration setup.

An integration that ServiceNow does not supply can still be tracked. You can build a chart from reports in a dashboard. That work may need ServiceNow expertise, so give it to whoever maintains reporting on the instance.

Dashboard or run record: which one to open

Open the dashboard when you need to check several integrations or several days at once. Open the run record when one run looks wrong, because the record holds the state of that run and any error text attached to it.

A dashboard shows that a run happened and how it ended. Whether the records inside the run are correct is a separate question, and the checks later in this page cover it.

Step-by-step check after each import run

Run this sequence after each scheduled import and after any manual run. The steps below follow the Microsoft Threat and Vulnerability Management path. Other integrations may use different menus, so check each one before you follow the sequence.

  1. Go to All > Microsoft Threat and Vulnerability Management > Integrations and open the integration you want to check.
  2. Click the Vulnerability Integration Runs related list.
  3. Check the state of the newest run. A finished run shows the state Complete with the Substate Success.
  4. Open the run, read any error text, and note the time window it covers.
  5. Compare the number of records the run handled with the number the source reports for the same scope.
  6. Open the run before the newest one. A single failure followed by a clean run needs a different response from repeated failures.

For this run check on Microsoft Threat and Vulnerability Management integrations, the required role is sn_vul.vulnerability_admin. Confirm that your account holds it before you start the sequence.

Diagnosing a failed or partial import

Two causes are named for failed runs on the Microsoft Threat and Vulnerability Management path. The first is a network interruption during the import. The second is bit decay in the data transfer, which corrupts data during the transform step. Treat the records from a failed run as partial until you have checked them.

Match the failure to a cause before you rerun anything. A run window that lines up with a connectivity outage points toward the transfer. Corrupted values that appear inside the run’s records point toward the transform.

Once the cause is ruled out, select Execute now on the integration to rerun it. Rerunning into the same fault adds another partial run to the history.

Deciding between a rerun and an escalation

Rerun the integration when the run window matches a fault you can identify and the fault has ended. Escalate to whoever owns the source system when the same run fails more than once, or when the records look wrong even though the state reads Complete.

Partial runs that look complete

A run can show activity and still leave part of its data behind. When the record counts fall short of the source but the state reads as finished, treat the import as incomplete. Hold back any downstream work that depends on it until the counts agree.

How timeouts appear in import queue entries

From version 18.2.4 of Vulnerability Response, the system sends heartbeats, which are timestamps, while an import queue entry processes data. This shows that the queue is still active. The Last Record Processed field on the Import Queue Entry page updates as the entry creates or updates records.

An entry that runs longer than one hour is not timed out on elapsed time alone. The system also checks the Last Record Processed field. If that field is older than one hour as well, the entry is treated as stuck and timed out. Two system properties control this behavior. The property sn_sec_cmn.record_threshold_heartbeat sets how many processed records trigger a heartbeat. The property sn_sec_cmn.maximum_heartbeat_delay sets the time after which the entry must be timed out.

The integration keeps processing data after a timeout error. A timeout message alone therefore does not show whether the import finished. The record counts answer that question.

Check the values of these properties on your instance before you rely on them, because they can differ from one instance to another.

Checks that confirm the imported data is usable

A finished run and usable data are two different things. Use these checks before you tell anyone the import is complete.

  • Match the created and updated counts in the run against the source export for the same scope.
  • Spot-check a small set of vulnerable items from the run against the scanner’s own console.
  • Confirm that items touched by the latest run carry the run date, not an older one.
  • Check that the scope the integration pulls matches the scope you expected. A narrow scope can produce a clean run with too few records.

Once the run and the records agree, move on to item-level validation. The page on verifying vulnerable item detection data after an integration run picks up where this check ends.

If the import relies on NVD or CWE data, the NVD and CWE import guide is the place to start for those feeds. For the wider picture of how these integrations are set up, see the integration patterns page.

For help planning this work, see ServiceNow implementation.

Recording each verification so the next check is faster

A short written record turns a one-time check into a repeatable routine. Keep the entries in one place per integration, and include the same fields each time.

  • The run identifier, its start and end times, and the state and substate it reached.
  • The record counts from the run and the matching counts from the source for the same scope.
  • Any error text, with a note on whether it was a network fault, a data fault or something you could not place.
  • The decision you made: accept the import, rerun it, or escalate.

Review the last few entries when a run looks odd. A pattern across entries often explains a problem that one entry cannot.

Release labels and what to check on your instance

Labels and paths can differ between releases. The Microsoft Threat and Vulnerability Management steps and the timeout behavior in this page are from the Xanadu release. The general dashboard guidance is from the Brazil release. Check menu names, dashboard names and field labels on your own instance before you follow a step.

Questions about reading Vulnerability Response import results

What does a run that does not reach Complete mean?

Treat it as unfinished. Read any error text on the run, decide whether the cause has passed, and then choose between a manual rerun and waiting for the next scheduled run.

Should I rerun a timed-out import right away?

Not before you read the Last Record Processed value on the Import Queue Entry page. A recent value suggests the entry may still be processing. A value older than one hour means the entry is stuck and timed out, and a rerun is reasonable once the cause is removed.

How many runs should I check before I trust an integration?

Check the latest run and the one before it. Two failures in a row point to a fault that is still present, so find that fault before you rerun.

Why would a clean run still have too few records?

The run completed against the scope it was given. Check that scope first, then compare the source for the same scope. A mismatch there is a configuration question rather than a run status question.

Which role do I need to check runs and rerun an integration?

For Microsoft Threat and Vulnerability Management integrations, the required role is sn_vul.vulnerability_admin. This page does not document a role for other integrations, so confirm the role on your instance before you select Execute now.

What should I do when the dashboard and the run record disagree?

Open the run record and treat it as the detail you check against. Use the dashboard for the overview, and note the difference in your verification entry so the mismatch can be traced later.