To set WIP limits for Kanban lanes in EAP, open your Agile Team in Enterprise Agile Planning, select Team settings, and use the Kanban WIP limits tab. Create a limit for the required state or substate, save it, then check the matching Planning board lane for its count and warning indicators.
Prepare the team and lane before setting a limit
Setting a WIP limit requires the sn_apw_advanced.eap_scrum_master role. Check that the person performing this configuration has that role for the task. Confirm before you start that your user record holds the sn_apw_advanced.eap_scrum_master role, because the Kanban WIP limits form depends on it.
A limit belongs to one lane of one team. Here, a lane represents a story state or a team substate. Choose the team first, then identify the place where partly finished work tends to accumulate. That gives the configuration a clear purpose: making an overloaded step visible during the team’s review of its work.
Before opening the form, agree which lane needs attention and what number the team wants to use. Treat that number as a working agreement about concurrent stories. Avoid choosing a value just because another team uses it. Teams set their own limits, and changing a limit for one team does not change another team’s configuration.
Limits are kept per team. The Kanban WIP limits tab sits in the settings of the team you have open, and each team sets its own limits, so a change for one team leaves the other teams’ boards as they were. Before you begin, write down the team name, the lane and the maximum you intend to save. Those three values are what you will compare against the saved record and the board later.
The steps and indicators described here apply to the Brazil and Australia behavior; check the controls on your instance and release before making a change. Keep the initial scope small enough to verify directly, with a named team, lane, and intended maximum.
Work through the setup in a fixed order: confirm the role, open the intended team, create any substates the lane needs, then add the limit, save it, and check the list and the board. Each check confirms one thing, so if something fails you know which earlier step to revisit.
Set WIP limits for Kanban lanes in EAP
- Navigate to Workspaces > Strategic Planning Workspace > Enterprise Agile Planning.
- In the left navigation panel, use Agile structure to choose the Agile Team whose workload you want to manage.
- In the page header, select Team settings.
- Open the Kanban WIP limits tab and select New.
- Use Kanban lane to select the state or substate that needs a limit.
- Enter the maximum number of work items in WIP limit. Use a nonnegative number.
- Select Save, then check the saved entry on the Kanban WIP limits tab.
The Team field is read-only. It takes its value from the team you opened, so this form is not a place to switch the target team. If the team is wrong, return to the team selection and open the intended team before continuing. This prevents an otherwise correct lane and number from being applied in the wrong context.
Each team lane can have one WIP limit. Before creating a record, inspect the list for an existing entry for that lane. A second record for the same team and lane fails validation. Open the existing entry for that team and lane and agree the next step with the scrum master before creating another record.
After saving, compare the list entry with the intended team, lane, and maximum. A completed form is not enough evidence of success: the saved limit must appear in the list, and the corresponding Planning board lane should display the limit alongside its story count.
Choose substates when a state has separate steps
The Kanban lane choices follow the lanes on the Planning board. When a state has substates, its substates appear in the selection instead of the parent state. If you expected a state name and cannot find it, inspect whether that state has been divided into smaller steps before assuming that access or the form is broken.
For example, a team might separate a broad active-work state into two substates representing different stages of delivery. If the concern is a queue in one stage, choose that substate for the limit. This example is a planning approach, not a required naming scheme or a preset configuration.
Create the needed substates before trying to set limits on steps within a state. The order matters because the limit must refer to a valid selectable lane. Agree the workflow structure first, then configure the workload threshold against the lane that the team will actually use.
Renaming a substate also updates its lane name on the associated WIP limit. For change review, record both the old and new names so reviewers can recognize the same workflow step. Do not interpret a renamed lane as a reason to create another limit record.
Read the Planning board signals correctly
A lane header displays its story count. With a limit configured, it also displays the limit, such as 1/1 when one story occupies a lane limited to one. Without a configured limit, the header displays the story count alone. A count by itself therefore does not show that a threshold has been established.
The header counts stories in the lane. A lane with no configured limit shows only that count, so a busy step without a limit looks the same as any other lane on the board until the team agrees a maximum for it.
At the limit, the header becomes amber. Above the limit, the header becomes red and includes an exclamation icon. Pointing to that icon displays an explanation such as WIP limit exceeded: 2 items, limit 1. The difference between reaching and exceeding the threshold helps the team distinguish a full lane from an overloaded one.
Treat amber as an early warning and red as a lane that is already over its agreed maximum. With a limit of one, a lane turns amber when its first story arrives and turns red when a second story joins it, so the two colours call for different responses.
Use those signals to start a discussion about finishing work, removing a blockage, or reconsidering what should enter the lane next. They describe the relationship between the current story count and the configured maximum. Do not treat a warning color as a diagnosis of why work is waiting.
In a review, read the header as two numbers together, such as two stories against a limit of one. Saying both keeps the conversation on the lane’s workload rather than on the colour alone.
Keep the meaning of this control separate from other platform limits. A Kanban lane threshold concerns stories in a team’s workflow; interpreting an unrelated platform limit will not explain its board count.
Check a saved limit and resolve validation failures
Review the configuration and the board together. First confirm that the saved entry exists on Kanban WIP limits. Next identify the matching lane on that team’s Planning board. Compare its displayed maximum with the saved number, then compare the story count with the visible work in the lane. If the header and the saved entry disagree, recheck the team and lane selection before changing the threshold. Record the team, lane, maximum and the board check in the handover note.
If the save fails, use the specific message to choose the next correction:
- WIP limit can’t be a negative number. Replace the negative value with a nonnegative maximum that reflects the team’s agreement.
- A WIP limit already exists for this team and Kanban lane. Inspect the existing entry for that team and lane before making another configuration decision.
- Select a valid Kanban lane for the WIP limit. Recheck the available lane choices and select the intended state or substate.
These validation failures leave the record unsaved. Do not move straight to board troubleshooting while the form is still rejecting its values. Resolve the field issue, save successfully, and then verify the board display. This sequence separates an invalid configuration from a question about which team or lane is being viewed.
The documented rule for the value is only that it can’t be negative. Zero is not listed as invalid, but a zero maximum means any story in that lane is over the limit, so confirm the intent with the team before saving a zero.
When testing access, also distinguish a lost session from a rejected WIP value. The session limits and hardening settings guidance is relevant to a session investigation. Keep the exact WIP validation message in the change notes when the form itself rejects the record.
For help planning this work, see ServiceNow implementation.