The ServiceNow Wiz integration is a set of importers that bring cloud asset, vulnerability, compliance, container, application and secrets data from Wiz into the ServiceNow AI Platform. Each import maps its findings to a destination, such as host vulnerable items or cloud test results. Setup needs a Wiz service account with the read:resources and read:projects API scopes, and the sn_vul_wiz.configure_integration role.
What the Wiz integration brings into ServiceNow
The Wiz package is a bundle of separate importers rather than one connector. Virtual machine and serverless vulnerabilities become host vulnerable items. Container image vulnerabilities become container vulnerable items. Configuration checks and attack-path issues become cloud test results inside Configuration Compliance. Software composition analysis and secrets findings become application vulnerable items.
| Import | What it brings in | Where it lands |
|---|---|---|
| Host Vulnerability | Findings on virtual machines and serverless assets | Host vulnerable items |
| Host Test Result | Test results for the VIRTUAL MACHINE resource type | Cloud test results |
| Container Vulnerability | Vulnerabilities in container images | Container vulnerable items |
| Configuration Compliance (Test Results) | Non-compliant cloud configuration checks | Cloud test results |
| Issues | Toxic combinations of vulnerabilities and misconfigurations | Cloud test results labeled Wiz Issues |
| SCA Findings | Software composition analysis findings | Application vulnerable items |
| Secret Findings | Passwords, tokens and keys | Application vulnerable items |
| Application List | Application inventory | Application records |
| Asset | Cloud asset data | Discovered item records |
For the wider process once these records exist, see the vulnerability response guides. For the general layout of vulnerability response integrations, see vulnerability response integration patterns.
Permissions, roles and connection
The Wiz service account needs the read:resources and read:projects API scopes. You select them when you add the service account under Settings > Service Accounts in the Wiz dashboard. The AI security findings import also needs the read:ai_security_findings permission, and Unified Security Exposure Management must be installed before that import can run.
On the ServiceNow side, the sn_vul_wiz.configure_integration role sets up the integration. Users with that role can also update the Import since date and cancel integration runs. For background on how roles and access work across the platform, see instance security and access control.
Configuration sits at All > Wiz Vulnerability Integration > Administration > Configuration. Enter the API endpoint URL from your Wiz user profile, then the client ID and client secret from the Wiz service account, and select Save and test. A confirmation message means the credentials saved and validated. Individual integration records, and their Active setting, sit under Administration > Integrations.
Choosing assets and filtering each import
The Asset integration is deactivated by default from version 32.1 for USEM and version 4.1 for non-USEM, and the other imports do not depend on it. Activating it is optional, and it no longer has to run before the other integrations. If you switch it on without naming resource types, it retrieves assets for all resource types, so name the types you need on the Asset Integration Configuration tab. The Host Vulnerability import needs VIRTUAL_MACHINE, SERVERLESS, or both. The Host Test Results import needs VIRTUAL_MACHINE at a minimum. The resource types apply to all Wiz imports except the Container Vulnerability import, which works from container image records.
Each integration has its own configuration tab. Many fields accept several values, and each starts on –None–. A field left on –None– imports no data, so an empty filter narrows the import rather than widening it.
The Host Vulnerabilities tab opens with First (pagination, with 1000 suggested as a starting point), Severity (NONE through CRITICAL) and Resource Status (Active, Error or Inactive). Selecting Advanced reveals Detection Method, Status (OPEN, REJECTED or RESOLVED), Has Public Exploit, Has Fix, Has CISA KEV Exploit, Resource Has High Privileges and Validated In Runtime. The Subscription field is the exception to the –None– rule: when it has no value, all subscriptions are returned.
Container findings and runtime exposure
Container imports run as a chain of three integrations. The Grouped Vulnerability integration runs daily and collects image source IDs into the Container Images table. The Deployment Context integration follows it and retrieves the cluster, namespace and service context for each image. The Container Vulnerability integration then creates container vulnerable items for each vulnerable image across those deployment contexts.
By default an item combines the image repository, the vulnerability and the image. The Configure CVR Based VI Granularity link lets you add components to that key. For example, a key that adds cluster creates an item for each combination of image repository, vulnerability, image and cluster.
The September 2026 release, 32.8.4 for USEM and 4.2.4 for non-USEM, removed the earlier 16-controller-per-image cap, which could leave large deployments with incomplete cluster and namespace visibility. Container vulnerable items can now be created for images deployed on any number of clusters. If cluster-based mapping is not needed, a system property can switch the chain off, which keeps the earlier behavior with the Container Vulnerability integration alone.
Test results, issues and rejected findings
The Configuration Compliance import brings Wiz configuration test results into Configuration Compliance as cloud test results. Before version 1.1, host configurations from Wiz were not imported. The Issues import brings in issues that point to a possible attack path built from combined vulnerabilities and misconfigurations. These land as cloud test results labeled Wiz Issues, which separates them from ordinary configuration checks.
Application findings have a choice under Manage Exceptions in ServiceNow on the App Vulnerabilities Configuration tab. When cleared, ignored Wiz findings (status REJECTED) show as findings in the Deferred state with the reason Risk Accepted. When selected, they move to the Open state so they can pass through the Exception Management workflow.
AI security findings
The Wiz AI Security Exposure Management integration imports cloud configuration issues on AI assets, such as AWS Bedrock agents that lack guardrails, and vulnerabilities or configuration problems in AI models, agents and MCP servers running on cloud compute. The AI Security Exposure Management application and its dependencies must be installed first.
Two pieces work together. A routing option on the Test Results integration, labeled Send AI security findings to AI security exposure management, sends AI posture cloud configuration findings to the AI posture findings table instead of Configuration Compliance test results. Customers must enable it. The Wiz AI Security Findings integration imports open-source model vulnerabilities as Model Risk findings and AI posture findings classed as Agent Risk or tied to MCP servers. It links each AI asset to the compute instance that hosts it.
Schedules, backdating and detections
The Grouped Vulnerability integration in the container chain runs daily, and the comprehensive integrations run on demand. For the general idea of scheduled work in the platform, see scheduled jobs explained. To pull older data, change the date in the Import since column for that integration and select Update. The comprehensive integrations added in September 2026 (Host Vulnerability, Issues and Test Results – Comprehensive) run on demand, are activated by default, and do full imports, with no delta imports.
From Wiz integration version 1.1.1 (December 2025), the Missing Assets table is deprecated. After upgrading, set the import schedule to backdate by three days and run the Host Vulnerability, Test Results, Host Test Results and Issues integrations. Four backfill integrations are no longer required: host vulnerability, test results, host test results and issues backfill.
The Host Vulnerability import uses a detection key to tell new findings from known ones. From version 30.2.3 (USEM, January 2026), new customers get Host Vulnerability detections keyed on the Wiz universally unique identifier. Existing customers keep the detection key built from vulnerability, asset ID and proof. For the general idea behind matching incoming records to existing ones, see identification and reconciliation.
Recent release changes
| Release | Change |
|---|---|
| 32.1.3, June 2026 (USEM) | Resource type no longer mandatory. The sn_vul.read_all, sn_vul_int_fw.read_all and sn_vulc.read roles were removed from the Wiz read and configure roles. |
| 32.7.0, August 2026 (USEM) | AI routing setting added to the Test Results integration. |
| 32.8.4 and 4.2.4, September 2026 | Chained container integrations, the AI findings integration and the comprehensive integrations added. |
| 32.9.1, October 2026 | Evidence mapping added to the AI findings integration. |
Frequently asked questions
Does the Asset integration have to run first?
No. From version 32.1 for USEM and 4.1 for non-USEM it is deactivated by default and is not a prerequisite for the other Wiz imports. If you switch it on, name the resource types you want.
Which role lets someone save the Wiz configuration?
The sn_vul_wiz.configure_integration role sets up the integration and saves its configuration. The sn_vul_wiz.read_integration role can view the AI security findings setting but cannot change it.
Why does a filter import nothing?
Filter fields start on –None–, and a field left there imports no data for it. Subscription is the exception: when it has no value, all subscriptions are returned.
Does AI routing need the AI Security Exposure Management application?
Yes. The application and its dependencies must be installed, and the routing option must be enabled before AI posture findings go to the AI tables instead of Configuration Compliance test results.