OBLYTECH Logo
OBLYTECH Logo

ServiceNow Palo Alto Networks Integrations: Which to Use

ServiceNow has several Palo Alto Networks integrations that move data in different directions. The Next-Generation Firewall app sends malicious IP addresses, URLs and domains to the firewall. Prisma Cloud Compute brings container and host vulnerabilities into Vulnerability Response, and Cortex XSIAM brings alerts and incidents into Security Incident Response. Choose by the direction your data needs to travel.

Four pieces, four different jobs

Integration Job Data direction Needed before install
Next-Generation Firewall app Blocks malicious observables on the firewall Security Incident Response to the firewall, through External Dynamic Lists Security roles, DigiCert root certificate, firewall certificate profile, API account
Palo Alto Networks – Firewall card Configures firewalls that use dynamic block lists Dynamic list names entered in the firewall form MID Server with SSH credentials
Prisma Cloud Compute Imports container image and host vulnerabilities Prisma into Vulnerability Response Separate subscription, Vulnerability Response 16.1 or later
Cortex XSIAM Ingests alerts and incidents XSIAM into Security Incident Response Incident profile, sn_si.admin and sn_si.ingestion_profile_admin roles

For the wider product, see the Security Incident Response overview. Setting up a MID Server, which the firewall card needs, is covered on the MID Server explained page.

External Dynamic Lists block indicators on the firewall

An External Dynamic List (EDL) is a text file that a firewall reads from a web server. Here the web server is the ServiceNow instance.

Creating a list

A user with sn_si.admin creates each list. Go to Integrations, then Integration Configurations, select Configure on the Palo Alto Networks Next-Generation Firewall tile, and choose Create new EDL List. Put the observable type and the firewall policy into the name, such as Outbound Malware IP or Outbound Phishing URL.

  • Observable type: IP (including CIDR), URL or domain. A list takes one type.
  • Tag type: a block list or an allow list.
  • Active: cleared by default. An inactive list cannot take entries.
  • Display tag: selected by default, so a blocked observable and its incident get tagged. The tag name takes an EDL- prefix and can be renamed.

After saving, the list stays inactive. The record shows an EDL Retrieval URL, which the firewall administrator enters on the firewall.

Activating and approving

The firewall side has to be configured before the list is activated in ServiceNow, and the list has to be active before it accepts entries. Activate it by hand once the firewall administrator confirms. Where the firewall administrator also works in ServiceNow, a change request activates the list automatically when it closes. The Create change request check box is selected by default, and the change request is shown once the list is saved.

When the approval process is enabled, each entry waits for approval before it is activated. Approval is part of the preconfigured workflow, and sn_si.admin holds it by default. Approving sets the status to Added and selects Active. Rejecting sets the status to Rejected and clears Active. After approval, the firewall retrieves the entry on its next retrieval interval, and the observable is blocked from then on.

Entries can also fail on compatibility, duplication or CIDR conflict. A domain list rejects an IP address observable, an observable cannot be active on two lists of the same type, and a single IP inside a CIDR block already on the list raises a conflict error.

Setting up the Next-Generation Firewall app

Roles and the firewall’s API account

The System Administrator installs the app and assigns sn_si.admin, which configures the integration and creates, activates and removes EDLs. It also assigns sn_si.analyst to SOC analysts, who create EDL entries and work with security incidents.

The firewall authenticates with a separate account. An admin creates a unique user with a User ID, a password, a title and an email address, then assigns the sn_sec_panfw.api_account_access role from the user’s Roles section. The User ID and password go into the firewall’s External Dynamic Lists dialog. The role is assigned directly rather than inherited.

Certificates

The integration needs a DigiCert Root Authority Certificate to validate and authenticate the connection between the ServiceNow server and the firewall. On the firewall, a certificate profile does the same job, using a DigiCert or Entrust CA Gateway certificate, depending on the use case. The firewall administrator configures it.

Install order

For the Madrid release and later, install and activate the Security Incident Response Dependency plugin, com.snc.si_dep, first. Then install these apps one at a time, in this order: Security Incident Response, Security Integration Framework, Security Support Common, and Security Support Orchestration.

Prisma Cloud Compute: container and host vulnerabilities

The Prisma Cloud Compute integration feeds Vulnerability Response and Container Vulnerability Response, and it is a separate subscription. Request the app from the ServiceNow Store with your Now Support login, validate the instance, and install it from System Applications once the install email arrives.

It requires Vulnerability Response 16.1 or later. The sn_vul_container.vulnerability_admin role manages the configuration. The Prisma user needs an API base URL, a username and a password, and the monitorImages permission.

The integration supports both SaaS and on-premises Prisma deployments. For the Vulnerability Response side of these records, see the vulnerability response integration patterns guide.

What it imports and how often

The integration imports image vulnerabilities for deployed containers and, through the Prisma host APIs, vulnerabilities on running hosts. The container side runs four scheduled integrations, and a separate daily hosts integration handles the host data:

  • Base Images, daily: base image vulnerabilities, reported separately.
  • Vulnerabilities, daily: container vulnerabilities, findings and container vulnerable items.
  • Container Counts, on demand: container counts for each non-base image.
  • Registry, daily: static image findings from the Prisma registry scan.

When a CVE is not yet in the NVD table, the integration creates a placeholder record that holds only the CVE and its name. The NVD integration fills in the other details later. If the update_nvd instance parameter is set to true, the integration updates the placeholder NVD records. It is false by default. Either way, the Exploit exists and Remediation notes fields are populated from Prisma until the NVD integration fills in the rest.

By default, a container vulnerable item is created for each combination of image repository, image and vulnerability. You can add components such as cluster to that key.

Configuring the connection

On the Prisma Cloud Compute Configuration form (All > Prisma Cloud Compute Integration > Administration > Configuration), enter the connection details and pick an integration instance. Select Use Projects only if you want the import limited to particular projects; that enables the Configure Projects tab, and you select Next to set them.

Cortex XSIAM: incidents into Security Incident Response

The Cortex XSIAM integration works through an incident profile. Go to All, then Palo Alto Networks XSIAM, then XSIAM Profile, and select New. The profile needs sn_si.admin and sn_si.ingestion_profile_admin. For the broader incident flow, see the security incident response integration patterns guide.

The form has a Name, which is also the default security tag name, and an Active check box that makes the profile poll XSIAM for incidents. Source picks the XSIAM tenant to ingest from when more than one is configured. Order sets which profile runs first when two or more share triggering conditions. The default is 100, and the lowest number has the highest priority.

Filtering and aggregation

Filter conditions decide which incoming incidents create security incidents. The criteria are case-sensitive. Severity, creation time, alert categories and alert count need the incident_id condition, because filter conditions retrieve strings.

Aggregation attaches an incoming incident to an open security incident instead of creating a new one. All selected fields within one criterion must match, and a partial match creates a new incident. You can add several criteria, and a match on any one of them is enough.

Updates between the two products

The integration synchronizes status, priority and work notes in both directions between Cortex XSIAM and Security Incident Response. The following options are set in the profile’s Additional Options:

  • On creation: the XSIAM incident status moves to New or In Progress, with a comment.
  • On closure: the XSIAM incident closes with the status and comment you set.
  • Priority: a ServiceNow priority change updates the XSIAM severity, per your mapping.
  • Work notes: security incident work notes appear as comments in the XSIAM war room.

Pull Closed Incidents fetches closed incidents, but closed security incidents do not receive new XSIAM data. Field mapping starts from a sample: the default option loads field names, and the record-number option loads live values from one security incident. Map incident and alert fields to the XSIAM Target Fields section by dragging a field across or entering it manually. Fields can be added to or removed from the set shown on the security incident.

Vulnerable items and how detections change their state

Third-party scanner integrations retrieve detections, meaning single occurrences of a vulnerability as a scanner reports it. Each detection pairs with a vulnerable item (VI), whose state follows its detections. The vulnerable item explained page covers the record in more depth.

Detections open and close from scanner data. When no detection on a VI is open and at least one is closed, the VI moves to Closed – Fixed. If all detections are marked Stale by the auto-close feature, the VI moves to Closed – Stale. When all VIs for a remediation task are closed, the task closes.

A closed VI with a fixed or stale substate reopens when a matching new detection arrives. From Vulnerability Response 20.0, a stale detection on a closed VI does not move the VI to Closed-Stale. To reverse that, clear the Ignore stale detections for closed VIs check box on the Auto-Close Configuration form.

Frequently asked questions

Which integration blocks malicious IP addresses on the firewall?

Use the Next-Generation Firewall app. Analysts add malicious observables to External Dynamic Lists, and the firewall reads them once an entry is approved.

Does Prisma Cloud Compute run as SaaS or on-premises?

Both deployments are supported. The Prisma user needs an API base URL, a username, a password and the monitorImages permission.

What does the firewall card need before it is configured?

The card needs a MID Server set up with SSH credentials. If the firewall is not already set up, add one first.

Do XSIAM incidents need filtering before they create security incidents?

Filter conditions decide which incoming incidents create security incidents, and they are case-sensitive. Aggregation conditions can attach an incoming incident to an open security incident instead of creating a new one.

Do changes from Cortex XSIAM reach Security Incident Response?

Yes for status, priority and work notes, which the integration synchronizes in both directions.