OBLYTECH Logo
OBLYTECH Logo

ServiceNow Encryption at Rest: Scope and Configuration Options

Encryption at rest on ServiceNow is a set of separate options, each covering a different layer. Database Encryption protects all stored data, Cloud Encryption with Key Management protects database storage and is the replacement for data-at-rest encryption, Field Encryption protects chosen fields and attachments, and Full Disk Encryption protects the storage devices themselves.

Why scope decides what is protected

Teams often ask whether an instance is encrypted at rest, as if there were one answer. A field-level control decides who can read a particular value. A database-level control decides whether the stored bytes are readable if the storage is taken. Reading each option’s scope first stops a team from assuming a control reaches further than it does.

The encryption options at a glance

Option What it covers Key handling Release status
Database Encryption All stored data, activity logs, replication traffic and backups Three-level AES-256 key hierarchy Deprecation prep from Washington DC; End of Sale and End of Renewal in Australia
Database Encryption with Customer Controlled Switch Data at rest when not in use Customer-run key endpoint End of sale reached as of Yokohama
Cloud Encryption with Key Management Encrypted database storage, block level ServiceNow-managed or customer-managed keys Replacement for data-at-rest encryption
Field Encryption Chosen fields and attachments Starter: none from the instance; Enterprise: Key Management Framework Replaced Column Level Encryption from Yokohama
Column Level Encryption Chosen fields and stored files Encryption contexts, keys held in the instance Deprecated; replaced by Field Encryption from Yokohama
Edge Encryption Values encrypted by a proxy before they reach the instance Proxy server and database in the customer’s network Being prepared for deprecation from Zurich; Field Encryption provides the latest experience
Full Disk Encryption Storage devices in the database server FIPS 140 validated hardware, or hardware in validation (Commercial) Protects against physical loss or theft

Database Encryption and its retirement path

Database Encryption protects all stored data with symmetric AES-256 encryption, online or offline. Records and tables are decrypted in memory while they are accessed, and the activity log files are encrypted too. Replication traffic and backups are encrypted along with the instance. The key structure has three levels: a customer-specific data key, a second customer-specific key that protects it, and a third key unique to each instance, held in FIPS 140 validated appliances in ServiceNow datacenters. The option applies to new and existing instances on supported releases, and it is not supported for on-premise instances.

Starting with the Washington DC release, Database Encryption is being prepared for future deprecation, while the Australia release marks its End of Sale and End of Renewal. Cloud Encryption is the replacement for data-at-rest encryption. A new configuration should start from Cloud Encryption with Key Management.

Database Encryption with Customer Controlled Switch encrypts data at rest using the database’s own tablespace encryption, so applications still read unencrypted values. The customer runs an HTTPS REST endpoint that supplies the secret key, and the organization maintains that endpoint. The variant reached its end of sale and end of renewal milestones as of Yokohama and has entered its end-of-life process.

Database key rotation is requested from Customer Service and Support. Customers can enroll for annual rotation, schedule an early rotation, or ask for a report of the last three rotations. Rotation runs overnight within 24 hours before the key expires and does not interrupt service. It is currently available in the Commercial, GCC, France and Singapore environments.

Cloud Encryption with Key Management

Cloud Encryption offers encrypted database storage using block encryption, with enhanced key management. It is part of the Platform Encryption subscription bundle, which also includes Field Encryption Enterprise. It supports production and non-production instances running MariaDB or RaptorDB in the Commercial Cloud, GCC pod 101, and ServiceNow Protected Platform Australia.

For licensed customers, new instance provisioning includes Cloud Encryption. An existing instance is moved through a service catalog request, which needs the customer admin or partner admin role and a one-hour maintenance window.

Key management operations let an administrator list keys, rotate them and withdraw customer-managed keys.

Managed and customer-managed keys

With ServiceNow-managed keys, rotation can be scheduled by month interval, day, time and notice period. A scheduled rotation job copied from another instance fails signature validation; deselect and reselect Enable scheduled key rotation on the target instance to recreate the signature. A rotation can take up to 20 minutes. The previously active key moves to the Rotated state, and the new version becomes Active.

With customer-managed keys, ServiceNow holds the key on its infrastructure, but the customer performs the key operations, including bringing its own key material, rotating and withdrawing. Download the wrapping certificate each time a key is switched or rotated, which avoids certificate-related issues.

Key withdrawal and quorum control

Key withdrawal applies to customer-managed keys. It requires the Cloud Encryption Withdraw and Resupply add-on, a signed legal addendum, and activation by Customer Service and Support. Once activated, the Quorum Control Policy Settings page appears. The administrator names the approvers, sets the minimum needed for quorum (at least two), and sets how many hours a request stays open. With nine approvers, for example, a minimum of five can be set. The withdrawal stays blocked until quorum is met, and after a withdrawal the instance is unavailable until the encryption key is active again.

Tamper detection checks each quorum setting with a hash-based message authentication code, daily and before any withdrawal runs. A failed check is logged and triggers a notice to Security and KMF admins, and repairing it requires ServiceNow support.

Field Encryption and the Column Level Encryption it replaced

Field Encryption blocks users, scripts and system processes from encrypted data by default. Access is granted through Field Encryption modules, encrypted field configurations and module access policies, which work alongside standard access control lists. Field Encryption replaces the deprecated Column Level Encryption product from Yokohama, and that product used a module- and context-based limit.

Feature Field Encryption Starter Field Encryption Enterprise
Encrypted fields Up to 5 No restriction
Attachment encryption Not included Included
Key management None from the instance; rotation goes through support Managed from the instance
Customer-supplied keys (BYOK) Not included Included
External key management service (HYOK) Not included Included

Enterprise keys sit under a key-wrapping hierarchy rooted in FIPS 140-2 Level 3 hardware security modules and follow NIST 800-57 practices. It supports on-premise customers but not domain separation. Changes to encrypted fields are not written to the record history, and system tables whose names begin with sys_ are not covered. For archive tables, the configuration belongs on the base table, because data moves into the archive still encrypted.

Installing Field Encryption triggers scheduled migration jobs that move your keys and already-encrypted data to cryptographic module keys. Afterward, the old context keys are restricted to decryption.

Edge Encryption: encrypting before data reaches the instance

A proxy server runs in the customer’s network and an Edge Encryption plugin is installed on the instance. The proxy encrypts the values an encryption rule marks in each HTTP request, forwards it, and decrypts encrypted values in responses. All bi-directional user traffic has to pass through the proxy servers, including browser, SOAP and REST traffic. A MySQL proxy database in your network is required for order-preserving encryption and encryption patterns.

Edge Encryption can encrypt Date, Date/Time, Email, IP Address, Journal, Journal Input, Multi-line text, Single-line text, String and URL fields. It cannot encrypt choice, HTML, virtual, number or auto-numbered fields. Back-end logic cannot process encrypted values, email does not pass through the proxy, global search is not supported, and encrypted data cannot be used in reports or with Data Archiving. A proxy connects to a single instance.

Full Disk Encryption and what the hardware layer covers

Full Disk Encryption applies encryption to the storage system in the database server, the only component that stores customer data. It protects against physical loss or theft of storage devices. Once the disk servers are powered on and serving data, the encryption adds no further protection, because the data is decrypted for use. For access from inside a running system, pair it with a database-level or field-level option. For the access side of a running instance, see the access controls review.

Choosing a configuration

Four questions shape the decision. Scope asks which data needs field-level protection and which needs the whole database covered. Key control asks whether ServiceNow manages the keys or the organization must supply and withdraw its own. Deployment matters because Database Encryption is not supported on-premise, while Field Encryption Enterprise is. Release matters because Database Encryption, Column Level Encryption and Customer Controlled Switch are all on a retirement path.

Frequently asked questions

Does ServiceNow encrypt all data at rest with one setting?

No. Each option has its own scope, from all stored data under Database Encryption to the storage hardware under Full Disk Encryption.

Can an on-premise instance use Database Encryption?

No. Database Encryption is not supported for on-premise instances. Field Encryption Enterprise supports on-premise customers.

What is the difference between ServiceNow-managed and customer-managed keys?

ServiceNow-managed keys can be rotated on a schedule the administrator sets. With customer-managed keys, ServiceNow holds the key but the customer performs the key operations, including rotation and withdrawal.

Is Database Encryption still the right choice for a new configuration?

Database Encryption is being prepared for deprecation starting with the Washington DC release, while the Australia release marks its End of Sale and End of Renewal. Cloud Encryption is its replacement, so a new configuration should start there.

Does Full Disk Encryption protect a running system?

No further protection is added once the storage is powered on and serving data.

Which option lets a customer withdraw its keys?

Key withdrawal applies to customer-managed keys in Cloud Encryption. It needs a licensed add-on, a signed legal addendum and activation by support, and a quorum policy sets the approvals required.