Configuring Application Vulnerability Response is a fixed sequence rather than one setting. Confirm the prerequisite applications, have an App-Sec Manager set the routing and scoring rules, run the Veracode or Fortify application list import, then give each scanned application a support group and a department. Those values are what assignment rules read when they route findings to people.
Check the prerequisites before changing anything
Three components need to be installed and active. Check each one the same way: open Subscription Management, then Subscriptions, and confirm the product appears in the list of subscriptions your organisation has purchased.
| Prerequisite | What to confirm | Setup reference if missing |
|---|---|---|
| Vulnerability Response | Installed and activated | Install Vulnerability Response |
| Performance Analytics for Vulnerability Response | Installed and activated, so Application Vulnerability Response reports appear | Install and configure the Performance Analytics for Vulnerability Response application |
| Veracode Vulnerability Integration | Installed, activated and configured | Install the ServiceNow Vulnerability Response Integration with Veracode |
The Veracode row carries one instruction the others do not: leave its integrations unrun at this stage. The sequence runs the Veracode import after the rules are in place.
The CWE job needs to be running, and the NVD job is optional in the prerequisite checks. The CWE 2000 integration keeps Common Weakness Enumeration records available, which help you decide when a vulnerability must be escalated. The NVD integration keeps National Vulnerability Database records current. From Administration, then Integrations, open the CWE Comprehensive 2000 Integration scheduled job and the NIST National Vulnerability Database scheduled job. Confirm the Active check box is selected on each.
Assign the user groups before configuring
The configuration procedure is marked for the App-Sec Manager group. Three default groups carry the day-to-day work, and a fourth supports penetration testing.
| Group | Who it contains | What to note |
|---|---|---|
| App-Sec Manager | Security managers, and from v15.0 application owners who manage penetration test assessment requests | Oversees configuration |
| Security Champion | Liaisons between the development group and security managers | Reads and writes the AVIs assigned to them, and can reassign them to another person or group |
| Developer | Individual contributors | Assigned alongside the other two groups |
| Ethical Hacker | Members of the ethical hacking team, from v15.0 | Performs penetration tests of applications |
The system admin role is needed to assign users to these groups through the User Administration module. The Setup Assistant in Vulnerability Response does not handle this step, because it assigns only Vulnerability Response roles. By default, the App-Sec Manager group includes the granular roles for third-party integration configuration.
Configure the five administration areas in order
The configuration procedure lists five areas. Work through them in the order given.
CI lookup rules
Open the CI Lookup Rules module under Security Operations, in the CMDB section. These rules define which fields match data in the configuration management database. A match links an application and its release to the application vulnerable item (AVI) record to aid in remediation.
- Lookup method: Script, which uses a pre-built or custom script, or Field matching, which searches a table or field in the CMDB.
- Order: the lowest number is evaluated first.
- Applies to: set this to Discovered Application for Application Vulnerability Response rules. Integrations that serve both Vulnerability Response and Application Vulnerability Response need this value chosen for each rule.
Copy an existing rule and change the copy rather than editing the original. Once the copy behaves as you want, deactivate the original. Deactivate rules rather than deleting them, because a removed rule cannot be recovered.
Assignment rules
Under Administration, open Assignment Rules. Each rule has a name, an active flag, an execution order, conditions and an assignment target. The target can be a user group from the lookup table, a user group field such as the support group on a configuration item, or a script. Scripts require ServiceNow expertise.
Run high-priority rules first: items that need special handling, items where the risk is critical, and items that regulatory compliance must cover. General rules come next, where you already know who is responsible. A default rule runs last and passes anything left over to a group that can refine the decision. Once an AVI matches a rule’s condition, the lookup stops. New or edited rules take effect on the next import.
Vulnerability calculators
Calculators set the Risk Score on each AVI. Two base calculators ship with the application. The Basic Risk Calculator is enabled by default and derives the score from normalised severity. The Advanced Risk Calculator is inactive by default. Only one calculator per target field can be active at a time, so the two cannot both drive the Risk Score.
Each calculator’s rules are evaluated in order, and the first matching condition applies. Calculators run when an AVI is created and whenever its configuration item or vulnerability changes. Normalised severity drives the calculation but does not appear on the AVI, which shows the Source Severity instead.
Remediation target rules
Remediation target rules set how many days an AVI has to be remediated, counted from its last opened date by default. The main fields are Name, Target (days), Target from (date), Active, Notify (days before due) and Rule applies to, which takes a condition filter.
The base system ships three rules: the Critical Risk Rating Rule, the Less Critical Risk Rating Rule and the Medium-High Risk Rating Rule. All three are inactive by default. If you edit one, select the Active check box before you save.
Before the notification date, the remediation status reads In flight. Between the notification date and the target date, it reads approaching target. Notify sets the notification date, which drives the remediation status and its colour coding. Setting Notify to 0 means only a target-missed notification is set. Test your conditions at full production scale, because they affect how long the Evaluate remediation targets job takes.
Normalized severity maps
Under Administration, open Normalized Severity Mapping. Each map pairs a Source value with a Target value, where the targets are 1-Critical, 2-High, 3-Medium, 4-Low and 5-None. Integrations such as Veracode supply these maps at installation. Change a map only when your third-party severity values are customised or non-standard.
Run the application import and assign support groups
Open the Integrations list under the Veracode Vulnerability Integration or the Fortify Vulnerability Integration, then open the Veracode Application List Integration or the Fortify On Demand Application List Integration. If it has not already run, select Execute Now. The other Veracode and Fortify integrations are inactive by default.
When the run finishes, go to Application Vulnerability Response, then Administration, then Applications. Each scanned application needs two values:
- Support Group, which the assignment rules use to route work.
- Department, which the reports use.
Use the list editor for bulk edits. Refresh the page to see Business Unit, which fills in from the Department. Scanned applications are stored under Administration, then Discovered Applications, and their fields behave as follows:
| Field | Source | Who can change it |
|---|---|---|
| Name, Version, Operational status, Description | Imported from the scan | Read-only |
| Department | Imported; can be added where empty | App-Sec Manager |
| Support group | Imported; can be added where empty | App-Sec Manager |
| Business unit | Filled from the Department | Read-only |
| Last policy compliance check date | Scan date from Veracode | Read-only |
Activate the remaining integrations
Return to the Integrations list and activate the other Veracode or Fortify integrations. Their activation sets your delta data imports. The Veracode and Fortify integrations are chained, so once active they run one after another.
Keep the CWE and NVD jobs running
If the Active check box is clear on the CWE Comprehensive 2000 Integration job, the integration may need configuring within Vulnerability Response first. Its settings are shared with Application Vulnerability Response, so coordinate any change with the people who run Vulnerability Response.
CWE records are reference material, so refresh them on a regular schedule. You can use the default update script or write your own. Each CWE record carries an associated knowledge article that describes the weakness.
Repeat the check for the NIST National Vulnerability Database job, which can run nightly or weekly, with the same shared-settings caution.
Reapply assignment rules and confirm the result
If you chose Configuration Item: Support group as the User group field on an assignment rule, the support group values from the Scanned Applications list are now available to it. Edit the rule, select Update, then open the Vulnerability Assignment Rules list view and select Apply Changes. That reapplies the rules to existing AVIs.
When these steps are complete, open Application Vulnerability Response, then Overview, and review the Application Vulnerability Management dashboard from Performance Analytics.
Frequently asked questions
Can the Setup Assistant complete this configuration?
No. The Setup Assistant in Vulnerability Response assigns only Vulnerability Response roles. Application Vulnerability Response configuration runs through its own administration modules and the CI Lookup Rules module.
Which value does an assignment rule need for a support group?
The support group entered on each application is the value used when the User group field is set to the configuration item’s support group. Run the application import first so those values appear in the Scanned Applications list, then enter them.
Should I edit a base remediation target rule or create a new one?
Either works. The base system ships three rules, all inactive. If you edit one, select the Active check box before you save, or the rule will not apply to new AVIs. Creating a new rule leaves the defaults untouched.
Should I change an existing CI lookup rule?
Copy the rule and modify the copy. Deactivate the original once the copy works, and avoid deleting rules, because a removed rule cannot be recovered.