OBLYTECH Logo
OBLYTECH Logo

OT Visibility in ServiceNow: Discovering OT Assets in the CMDB

The ServiceNow OT Visibility dashboard shows the operational technology devices in your industrial network in one place. It reports how many devices were found or went quiet in the past week, how many sit in the configuration database, and which still lack a category, a user assignment or an equipment mapping.

The ServiceNow OT Visibility dashboard counts devices in three groups

The first group covers the last seven calendar days. “New OT devices discovered” counts devices found by Discovery for Operational Technology and other automated processes in that window. “Inactive OT devices” counts devices absent from the network over the same period.

The second group describes the inventory as a whole. “Total CMDB OT devices” counts the OT devices on the network. “Unclassed OT devices” counts devices with no OT device type category. “Unassigned OT devices” counts devices not assigned to a user. “Unmapped OT devices” counts devices not linked to an equipment model entity for their site. That tile appears when the Industrial Process Manager is installed.

The third group sorts devices into Supervisory systems, Control systems, Field devices, Computers and servers, Network Gear and Industrial IoT. Control modules are not included in the Control systems figure.

Four charts sit below the tiles, covering Purdue level, device type, manufacturer and criticality. Selecting a tile’s number or chart opens its key performance indicator graph.

Four Operational Technology Manager roles control who sees device data

Opening the dashboard needs the cmdb_ot_viewer and cmdb_ot_isa_viewer roles. Go to All, then Industrial Workspace, then the Dashboard Library icon, and select Operational Technology Visibility.

Role What it allows
cmdb_ot_viewer Read-only access to OT device records
cmdb_ot_editor Create, read, update and delete OT extension classes, covering OT configuration items but not IT items
cmdb_ot_admin Create, read, update and delete OT device records, and manage specific OT entity type configurations, with the same limit on IT items
ot_discovery_admin Runs the OT discovery process, without access to the CMDB records created from discovered items

Assign roles through user administration, to a user or to a group. Assigning them requires the admin role. For the wider access model on the instance, see instance security and access control in ServiceNow.

Site filters limit each dashboard to sites a user can access

The site filter covers the OT Visibility dashboard and the two companion dashboards in the Industrial Workspace. It needs the cmdb_ot_isa_viewer role, with access to each site. Select Site, choose one or more sites, and use the search to find a site by name.

Devices without a site appear as “No site assigned”. Assign the device a site, then assign that site a business unit, which is what lets the site display correctly on the dashboard.

The dashboard needs a daily data job before it shows figures

Find the setup steps under All, then Industrial Workspace Admin, then Guided Setup, in the Operational Technology Visibility Dashboard section. The required first task is the OT Devices Daily Data Collection job. Until it runs, no figures appear and the Last updated timestamp stays hidden. For how the reporting tiles and indicators behind dashboards like this are built, see reporting and dashboards in ServiceNow.

  1. Open All, then Data Collector, then Performance Analytics, then Jobs.
  2. Filter Name to OT Devices Daily Data Collection.
  3. Tick Active under Job parameters and set a time. The default is 00:00:00 each day, so tell dashboard users if you change it.
  4. Use Execute Now on the first run. Later runs follow the schedule.

Raising the one million record limit

Each indicator shows up to one million records by default. When an indicator exceeds that, the error message links to the job logs, and filtering those logs by the Level column shows the indicator at fault. Administrators with the admin or pa_admin role open it under Performance Analytics, then Sources, then Indicator Sources, filtered to the Operational Technology Manager application and the cmdb_ci facts table, then select the indicator source named in the job-log error. On the Records Collection tab, tick Override records collection, set a higher Maximum number of fetched records, and select Update.

The CMDB stores each OT device as several linked records

An OT device occupies at least two records: a configuration item and an OT entity record. OT extension classes extend the CMDB class hierarchy, and OT device details hold the Purdue level. For reading CMDB data quality scores once these records exist, see ServiceNow CMDB Health Dashboard: Reading Scores and Fixing Them.

Equipment model entities represent sites and the process steps that OT devices automate. The default ISA-95 template uses area, work center and work units as levels.

Relationship Reverse What it describes
Automated by Automates An OT device automating an entity
Owns Owned by A control module owned by a control system such as a PLC

Readers who want the wider configuration model can start with the ServiceNow CMDB, CSDM and ITAM page.

The OT device form holds the fields that shape reporting

Field What it holds
OT device type The function the device performs on the OT network
Device criticality Relative risk to the site process if the device fails, from 1 (highest) to 4 (not critical)
Site The industrial site the device belongs to
Purdue level A level from 0 to 5
Zone The area within the site
Class The assigned class

Device type reflects function, not class. A server converted into a human-machine interface keeps the server class and records HMI as its device type.

Three routes bring devices into the CMDB

For the connection and credential side of OT discovery, see How to Configure OT Discovery Connections and Credentials.

Discovery for Operational Technology adds OT context

It reports on IT-classed hardware configuration items. Each OT discovery schedule pushes the attributes it defines to them, and it sets when the process runs.

IT Discovery for OT Networks works within Purdue levels

It finds IT-class items such as switches, routers and computers that sit in industrial networks. Standard discovery normally covers Purdue levels 4 and 5. The OT version can also cover level 3.5, the industrial demilitarised zone, and level 3, site operations. Do not run discovery against levels 0 to 2, because it can disrupt industrial operations.

When a schedule runs, it:

  1. Works through the IP addresses assigned to it and discovers the hardware at each.
  2. Checks for an existing OT entity record for each item, updating it if related attributes have changed and creating one if there is not one.
  3. Pushes the location attribute, along with the other attributes defined on the schedule, to the configuration item and its OT entity records.
  4. Creates OT entity records for applications on discovered devices, listed under Operational Technology (OT) in the Industrial Workspace.

Native components and bulk conversion

Native OT discovery uses the Discovery Console for OT, the Discovery Sensor for OT and the OT Discovery Collector. They import device data through the Service Graph Connector for ServiceNow OT Discovery.

IT hardware already in the CMDB can be converted in bulk with the Automated IT OT Bulk Contextualization job, found under OT Manager Admin. Running it needs the admin or cmdb_ot_admin role. Set the source table and filters, check the selected records with Preview, and review the OT Entity Default Configuration tab. Keep each job’s data within the record limits your release sets, and use a separate job for each CI class.

The equipment model maps show OT device links

Go to Equipment Model Manager in the Industrial Workspace and select a site. The device map shows how the selected entity relates to OT devices, and the dependency map adds the hierarchy of entities and devices around it.

Mapping devices to equipment model entities links them to those entities. You can map a single OT device from its record with the Map OT device action, or open an OT subnet mapping record and select Map OT devices in this subnet to map every OT device in the site whose IP address falls in that subnet. For the industry view of OT management in utilities, see ServiceNow Operational Technology Management for Utilities.

Vulnerability work reuses the same device records

Vulnerable items link to the OT devices they affect. Risk can then factor in the criticality of the mapped equipment model entity, and each site can have its own OT Vulnerability Response assignment group, so OT Remediation Owner users see only their site’s vulnerable items.

Frequently asked questions

What does the “New OT devices discovered” tile count?

It counts OT devices found by Discovery for Operational Technology and other automated processes in the last seven calendar days. Compare it with the “Inactive OT devices” tile, which counts devices absent over the same period.

Why would the Unmapped OT devices tile be missing?

The tile appears when the Industrial Process Manager is installed, since it counts devices not mapped to an equipment model entity for their site.

Why does the dashboard show no figures after setup?

Until the OT Devices Daily Data Collection job runs, no figures appear. Activate the job, set its time, and use Execute Now on the first run.

What happens to a device with no site?

The site filter lists it under “No site assigned”. Assign it a site, then assign that site a business unit so the site displays correctly.

How do I raise the record limit for an indicator?

Each indicator defaults to one million records. An administrator with the admin or pa_admin role opens the affected indicator source, ticks Override records collection on the Records Collection tab, sets a higher Maximum number of fetched records and selects Update.