A ServiceNow Agile backlog is a ranked list of stories, and rank is priority: the story nearest the top carries the highest priority. In Agile Development 2.0, the product owner orders that list on the Agile board, pulls defects and other records in through triage boards, and then schedules stories into sprints from the Sprint Planning tab.
Where the backlog sits on the Agile board
The Agile board is the landing page for the scrum process. Its tabs cover backlogs, sprint planning and sprint progress. For the wider method, see the plain-language guide to ServiceNow Agile Development. To reach the backlog, open All, then Agile Development, then Agile Board, and select Backlog. The board is available to users who hold one or more of four roles: scrum_admin, scrum_master, scrum_product_owner or scrum_sprint_planner. Managing the product backlog requires the scrum_product_owner role.
A personalized backlog you have created appears on the Backlog tab automatically. If none exists yet, a welcome page links to the form that creates one. The tab shows cards for total stories, stories without story points, and stories without acceptance criteria. Clicking a card lists the stories it counts. The tab also lists active stories assigned to a team that have no sprint yet, and a Records by epic section shows each epic’s progress as a bar and a percentage.
Adding stories and placing them in the list
A story created from the Backlog tab lands at the bottom of the last page. For the story record itself, see ServiceNow story explained. To place it elsewhere, select the story directly above the spot you want, then choose Create Story. The new story appears beneath the one you selected. The same placement works on the Sprint Planning tab, where a story added beneath an existing row also sets its order of implementation.
To change a story, select its number, edit the details and choose Update. Read-only users can open the story form but cannot edit it. The options icon beside Create Story also creates epics and themes. A new epic appears in the epics filter once its stories match the filter criteria of the backlog you are viewing.
Creating a story requires the scrum_story_creator or scrum_admin role. You can start one from the Agile Development stories list, from the Backlog or Sprint Planning tab, from a Stories related list on a product, release, sprint, theme or epic, or from a defect or enhancement record.
The story fields that shape the backlog
The fields on a story decide where it sits, who owns it and what finishing it means. The table covers the fields that drive backlog work. For more on epics, see ServiceNow epics explained.
| Field | What it holds |
|---|---|
| Theme and Epic | One of each per story, chosen from those linked to the story’s product |
| Type | The kind of work, such as Development, Documentation or Spike |
| State | Draft (the starting value), Ready, Work in Progress, Ready for Testing, Testing, Complete or Cancelled |
| Points | Estimated effort; a larger value means more effort |
| Priority | Used by the product owner to rank stories on the planning board |
| Assignment group | The agile team the story belongs to |
| Sprint | Appears once an assignment group is selected |
| Acceptance criteria | The functional criteria or test results needed to move the story to Complete |
A story created for a defect needs its Defect field filled in, and the same applies to enhancements. Opening a defect record requires the feature_user role. With the glide.ui.task.insert and glide.ui.advance properties set to true, the Insert and Insert and Stay options copy a story into a new story directly below it. They are not allowed on stories added from a triage board.
How rank sets priority in the backlog
Rank is positional. Moving a story changes its rank relative to the other stories in the same backlog, and the platform stores that value in the global_rank column of the Story table, which is rm_story underneath. The story at the top has the lowest rank value and the highest priority. The story at the bottom has the highest rank value and the lowest priority. Reordering is therefore the same act as reprioritising. For the decisions behind that order, see ServiceNow implementation backlog prioritization. Rank is relative to the other stories in the same backlog: moving a story changes its position only within that backlog’s list.
You can drag a story to a new position with the mouse. You can also use the keyboard: press Tab to highlight the story, press Tab again to reach its context menu icon, press Enter to select it, move it with the up and down arrow keys, and press Enter to fix its position. Shift and Control extend a selection to several stories, which then move as a block.
The options icon on a selection offers Move to top, Move to bottom, Move to next page, Move to previous page and Move to page. The same menu sets Assigned to, Assigned group, Epic, Product, Project, Project Phase, Release and Theme for the selected stories.
Pulling defects and other records in through triage boards
The Agile Development — Unified Backlog capability keeps one backlog for records of different task types, such as defects, problems and enhancements. A product owner prioritises them from one place, and each record that joins the backlog gets a story.
A triage board is a filtered view of a table, with a Name, a Table, a Filter and a Backlog definition that receives the stories created from it. Boards can draw on problems, incident tasks, defects or change requests. A board fills itself as new records match its filter.
The filter keeps its two default conditions. Active is true leaves out completed and cancelled tasks. Agile story is empty leaves out tasks that already have a story or sit in another backlog. To create the first board, open Triage Board from the Backlog tab and choose Set up Triage Board. Setting up a board requires the scrum_product_owner role and a backlog you own.
To add records, open Triage Board, choose a filter definition, select the records and then select Add to Backlog. Each item becomes a story at the bottom of the backlog. The story keeps the original item in its Original task field, and the two sets of information sit on separate tabs. Viewing a triaged record depends on your role: viewing a problem requires the itil role.
Moving a triage-derived story to another lane changes the story’s state, but the original record keeps its state. To update the original, open the story and switch to its original record tab. A triaged record can go back to the triage board from the Move back to triage board related link.
Scheduling stories into sprints
Sprint planning happens on the Sprint Planning tab, reached through All, then Agile Development, then Agile Board. Pick an assignment group in the Group field. You need membership in an agile group to open the tab, and the actions you can take depend on your role: scrum_admin, scrum_master or scrum_sprint_planner. For who does what across the process, see roles and RACI for Agile Development.
Create Sprint builds a sprint, and Create sprints in bulk builds several for a group at once. Until a sprint begins, you can change its group capacity to allow for holidays and changes in team makeup. Complete Sprint asks you to move unfinished stories to the backlog or to a future sprint.
The current sprint section shows its planned dates, story points, percentage group velocity, and total, complete and pending points. Stories are dragged from the backlog into a sprint, and reordering stories in the backlog or in a sprint section is how priority is set during planning.
Tracking sprint progress
The Sprint Tracking tab offers a story board, a task board and a list view. On the story board, stories appear as cards in lanes that represent states, and moving a card changes that story’s state. For how sprint progress is charted, see the burndown chart guide. On the task board, moving a scrum task to another lane updates the state of the story it belongs to. Using the tab requires membership in an assignment group and the scrum_user or scrum_admin role.
Epic backlogs, plugin activation and Collaborative Work Management
Epics have a backlog of their own, reached from the Program tab of the Agile board. The page lists it_program_manager and scrum_user as required roles, and editing the epic backlog itself requires it_program_manager.
The Unified Backlog plugin is identified as com.snc.sdlc.agile.multi_task. Activating it in the Zurich release requires the admin role and Agile Development 2.0 to be active first. Find it under All, then System Applications, then All Available Applications, and select Install. Where domain separation and delegated admin are enabled, the administrator has to be in the global domain, or the installation fails with an error. Triage actions require this plugin to be active.
Collaborative Work Management, abbreviated CWM, has its own backlog pane in the Sprint planning view of a board. Select the add item icon there. The item type defaults to Task, and Story or a custom type can be enabled. After you submit the form, you drag the item into an active sprint section. Creating these items requires the sn_cwm.cwm_user role.
Frequently asked questions
How do I move a story to the top of a ServiceNow backlog?
Drag it to the top of the list, or select it and choose Move to top from the options icon. The story at the top has the lowest rank value, which means the highest priority in that backlog.
Where does a new story appear in the backlog?
At the bottom of the last page. To place it elsewhere, select the story directly above the spot you want and choose Create Story. The new story appears beneath the one you selected.
Can a defect join the backlog without being retyped?
Yes. Open the triage board, select the defect, and choose Add to Backlog. The resulting story keeps the defect in its Original task field.
Does moving a story on the story board change the original record?
No. Moving the story changes the story’s state. To change the state of the original record, open the story and use its original record tab.
Who can plan sprints?
Sprint Planning requires membership in an agile group. The actions you can take depend on whether you hold the scrum_admin, scrum_master or scrum_sprint_planner role.