OBLYTECH Logo
OBLYTECH Logo

Dependency Views in ServiceNow CMDB: Reading CI Maps

Dependency Views is a ServiceNow map that starts from one root configuration item (CI) and draws relationships above and below it. Use it to see which services a CI supports, which CIs those services rely on, and which active or pending issues sit on each node. Opening a CI or task record that names a CI launches the map.

What a Dependency Views map shows

The root CI sits inside a darker frame that pulses, so it stands out from the rest of the map. From that root, the map draws upstream and downstream dependencies. By default it displays three levels in each direction, and an administrator can change how many levels appear first.

Many of the relationships come from discovery, but the map is also an editing surface. You can create, define and delete CI relationships directly on it, and the map refreshes to reflect changes made to the CMDB. Map indicators flag CIs with active or pending issues.

Two boundaries shape what appears. CIs that do not extend from the Configuration Item table are not drawn, and they are absent from CI relation formatters too. Access control rules are enforced as well, so a CI or relationship that fails the permission check is hidden.

Opening a map and managing saved views

View Map in New Tab opens a full-screen tab without the application navigator, and View Map opens the map in the current tab’s content pane. A saved view opens with its stored properties, not the current defaults.

From the map, the view menu offers Save View, Load View and Last View. Deleting a stored view is a separate step: go to Saved Views, tick the check box beside the view, and choose Delete from the actions drop-down. Deleting requires the sn_cmdb_admin or admin role.

Export Image in the view menu produces a PNG of the current view of the map. It requires sn_cmdb_admin or admin and does not work in Internet Explorer.

Layout options and node actions

The top menu holds the layout choices and the root field. Type a CI, application service or business service into the root field and autocomplete suggests matches.

Layout or control What it does
Vertical Stacks elements in a tree by upstream and downstream relationship. The initial default.
Horizontal Lays the same tree out from left to right.
Radial Arranges elements in a radial pattern according to upstream and downstream relationships.
Force Centres elements around the parent CI, ignoring direction.
Group Groups elements by CI type.
Details Lists related items such as problems, changes and related services for the selected CI, plus events and alerts when the Event Management plugin is active.

In the Details panel, Related Services lists the application services of the displayed CIs. Double-clicking a service opens the map in the Event Management dashboard.

Right-click a node, or use its node menu icon, for CI-level actions. View Map reloads the map with that CI as the new root, and it is not offered on the current root. View Related Tasks lists incidents, problems, change requests and follow-on tasks, and it stays available even when none exist. View Affected CIs appears when the map is opened from a task’s Configuration item field.

Load More extends the map past Max Levels, and virtual grouping is not applied at the newly loaded level. Add Relationship draws a new link by dragging a dotted green line to another CI, then asks for a relationship type.

Filtering what the map shows

The map settings icon opens the filter panel, which requires sn_cmdb_admin or admin to change.

Predefined Filters apply saved combinations of configuration type, CI type and relationship filters. One predefined filter can be set as the default, and it runs before any other filter. Dependency Type runs a real-time filter for one CI.

Other strips narrow the map by depth, CI type, location, manufacturer and relationship type. The audit failure filter hides CIs that failed the CMDB health staleness test, and it is listed when such CIs exist. Map Indicators decide which kinds of task display and count toward the flags.

Remove Filtered Items set to Off grays excluded CIs out, and set to On hides them along with disconnected children. Save Custom Settings stores the configured map settings under a name, and Load Saved Custom Settings reapplies them later.

Clusters and virtual groups

Two mechanisms keep dense maps workable, and they operate at different levels.

Clusters are CIs from the Cluster table, representing computer CIs that work together as one system. A cluster displays collapsed (cluster CI alone) or expanded (with child CIs). Child nodes typically represent servers. Cluster groups start collapsed by default, and Expand and Collapse switch a single cluster between modes. The map searches a collapsed cluster’s components for tasks and outages, across the levels currently shown.

Virtual grouping applies to sets of similar CIs. When the number of nodes of one CI type at one level passes the too-many-children threshold, those nodes combine into a virtual group node that shows how many nodes it holds. A virtual group is not a CI itself and cannot have tasks assigned. A virtual link shows that a CI inside the group connects to another node. Children stay hidden unless the show-virtual-node-children property is enabled.

Some behaviour is fixed. Virtual grouping does not apply directly beneath a virtual group. Predefined filters do not apply to virtual groups, so a group can show even when a filter would exclude its members. Expanding the group applies the filters.

Properties that set the defaults

Administrators set map behaviour under Dependency Views > Map Properties, which requires sn_cmdb_admin or admin. The defaults below are the Brazil values.

Property Default Effect
glide.bsm.max_nodes 1000 Maximum nodes retrieved for one map
glide.bsm.max_levels 3 Levels shown on first display; accepts 1 to 49
glide.bsm.too_many_children 10 Similar CIs at one level before virtual grouping; minimum 1
glide.bsm.show_virtual_node_children No Shows children under virtual groups
glide.bsm.max_num_rels 100 Maximum relationships retrieved per node
glide.ngbsm.filters_remove_filtered_items Yes Hides filtered items rather than graying them
glide.ngbsm.filters_run_layout_automatically Yes Reapplies layout when a filter changes
glide.ngbsm.filters_fit_to_screen_automatically No Refits magnification after a filter change
glide.ngbsm.performance_allow_curves Yes Smooth curves; No can make animation smoother
glide.ngbsm.notification_display_time 5000 Notification duration in milliseconds
glide.ngbsm.search_ci_limit 10 Maximum CI search results
glide.ngbsm.search_rel_type_limit 5 Maximum relationship type search results
glide.ngbsm.show_class_labels Yes Shows the class label above each CI label
glide.bsm.layout_horizontal_spacing_x and _y 200 and 100 Pixel distance between node centres, horizontal layout
glide.bsm.layout_vertical_spacing_x and _y 125 and 125 Pixel distance between node centres, vertical layout

Smooth curves can be more demanding for the browser. Setting glide.ngbsm.performance_allow_curves to No (default Yes) draws straight lines instead, which can make animation and interaction smoother.

Roles, incident tracing and newer map views

Users with the itil and ecmdb_admin roles can view a map and carry out all actions on it. Icon, indicator and menu-action changes need ecmdb_admin. Properties and dependency types need sn_cmdb_admin or admin.

During incident work, the Configuration item field on an incident names one CI, which suits a single failing device. The Affected CIs related list holds several. For a load balancer that stops responding, the configuration item might be one server out of memory, while the affected list holds the balancer, its data centre, the dependent servers and the business services that lose capacity. The dependency views icon beside that field opens the map, and View Affected CIs shows what a CI affects. Affected-CI lookups need itil, itil_admin, sn_incident_write or admin.

Two features have been documented since the Xanadu release. Metrics mode, opened with View Metrics on a CI, needs the Operational Intelligence plugin, processed metrics data and the admin role, and it covers the CIs currently displayed. The CMDB alert dependency map opens from a CMDB group alert. Under All > Event Management > All Alerts, search for the group, open the alert, and follow the link in its Activities tab. It needs evt_mgmt_user or evt_mgmt_operator.

Release status and domain separation

Dependency Views is being prepared for future deprecation from the Brazil release. It will be hidden and no longer activated on new instances, but it remains supported. The named replacement is Unified Map, delivered through the CMDB Workspace store app, which combines Dependency Views and Service Mapping into one map experience.

Domain separation is not supported. The CI table is domain separated, but the relationship table is not, so a relationship shows when both of its CIs are visible in the user’s domain. Tenant domains see their own domain and global CIs.

Frequently asked questions

What is the root CI on a Dependency Views map?

It is the starting point of the map, marked with a darker, pulsing frame. Changing the root redraws the map around a different CI.

Why would a CI be missing from the map?

CIs that do not extend from the Configuration Item table are not drawn. Records the user cannot read are hidden with their relationships, and filters can remove more.

What separates a cluster from a virtual group?

A cluster is a CI from the Cluster table that can be collapsed or expanded. A virtual group is created by the map when too many similar CIs sit at one level. It is not a CI and cannot have tasks assigned.

Is Dependency Views being retired?

Dependency Views is being prepared for future deprecation from the Brazil release. It is hidden on new instances but still supported, and Unified Map is the replacement.