OBLYTECH Logo
OBLYTECH Logo

Third-party HR integrations: staging tables and transform maps

Third-party HR and learning integrations move data in three steps. Staging tables receive the vendor’s records, transform maps copy them into ServiceNow target tables, and in the Cornerstone OnDemand integration a status page translates the task status codes. Cornerstone OnDemand, Oracle Cloud HCM and Workday Learning use these building blocks, each with its own tables and maps.

How data moves from the vendor into ServiceNow

Each Cornerstone OnDemand run is started by one scheduled flow, which triggers three HR integration services. Each service writes to its own staging table, and the transformation scripts then publish the results to the places employees and administrators see. For the underlying concept, see the import set explainer.

Integration service Staging table Where the result appears
Sync Users User Mapping Staging HR Cornerstone Integrations > Users
Sync Trainings CSOD Learning Object Staging HR Cornerstone Integrations > Learning Objects
Sync Transcripts HR Pulled To-do Integration Staging HR Integrations Framework > Todos

All three services need to be activated for the data to stay synchronized between Cornerstone OnDemand and ServiceNow. Check the service list first when learning tasks stop appearing.

The learning system is the source of the tasks. When a learning task is assigned to an employee in Cornerstone OnDemand, a transcript is created for that employee there. The Sync Transcripts service pulls the transcript and displays it as a task on the To-dos page in Employee Center. Selecting the task takes the employee into Cornerstone OnDemand to complete it, and the task status in Employee Center updates after the scheduled job runs.

Setting up the Cornerstone source and its run properties

Activating the Cornerstone plugin from the ServiceNow Store also activates the Cornerstone spoke in IntegrationHub and in the Enterprise Service Management Integrations Framework. The spoke then needs its own setup. Once the application is set up, a source record for Cornerstone is created in the framework’s Source module, together with its HR integration services, scheduled flows and transform maps.

The source record carries three run properties that matter in day-to-day use:

Property What it controls Behavior
full-pull Whether a run pulls everything or only changes True pulls all active users, active trainings and incomplete to-dos. False pulls only users, trainings and transcripts modified since the last successful schedule run.
page-count Records requested per API call 500 by default. Honored by Sync Trainings and Sync Transcripts, not by Sync Users.
url-prefix Deep link prefix used to open learning objects Filled in from the value generated in Cornerstone OnDemand (see below).

The full-pull setting behaves differently on the first run. If the framework has no record of a last successful run, the first pull is always a full pull, whatever the setting. After that, a False setting means each run fetches the records that changed since the previous successful run.

Setting up deep links takes a few steps. In Cornerstone OnDemand, generate deep links from the Deep link Generator tab with LO Details selected in the Page URL list, then copy the URL prefix. In ServiceNow, open HR Cornerstone Integrations > Source, open the Cornerstone record, and append the copied value to url_prefix under Properties. The deep link procedure requires the sn_hr_cornerstone.admin role.

Matching Cornerstone users to ServiceNow users by email

Cornerstone users are mapped to ServiceNow users through their email IDs. That mapping determines which employee receives a learning task, so the email address on each side is the first thing to check when a task lands with the wrong person or with nobody. Each User Mapping record holds CSOD ID, Active, the ServiceNow user name, CSOD User, CSOD User ID and CSOD Email.

Matching on CSOD ID, CSOD User or CSOD User ID instead of email requires an override. You must override the getUser method in the CSODIntegrationsUtil script before those fields can be used for mapping.

Learning objects and which ones reach the To-do list

Learning objects are the courses, videos and curricula pulled by Sync Trainings. Each record carries a Title, an Active flag, a Learning ID, a Learning Type, a Learning Type ID and a Root LO field that points to its parent. These records appear in HR Cornerstone Integrations > Learning Objects.

Not every learning type reaches that page. Session, Cohort, Program and Library records land in the CSOD Learning Object Staging table, but they do not appear on the Learning Objects page after transformation. A certification behaves differently again. Only its child topics appear as To-do tasks in Employee Center, and the certification itself does not. When a learner cannot find a certification in their list, check whether the content they need is one of its child topics.

Mapping Cornerstone transcript status codes

The task status in Cornerstone OnDemand is stored as a numeric status ID. The Status page in the application shows the mapping between each transcript status ID and its readable status value. That mapping makes the external status of a task on the HR Pulled Integration To-do table readable.

Take this example. A transcript with status ID 25 corresponds to the status Pending approval in Cornerstone OnDemand. The Status page holds two fields for this: Status, which is the status of the task in Cornerstone OnDemand, and Status ID, which is the unique identifier of that status in the same system.

The transform maps behind each integration

Cornerstone OnDemand has three transform maps, and two of them are available by default. The CSOD user mapping transform copies users from the User Mapping Staging table into the User Mapping table. The CSOD learning object mappings copy records from the learning object staging table into the CSOD Learning Object table. The HR Pull to-do transform map moves tasks from the to-do staging table into the HR Pulled Integration To-do table. Each transform map specifies the data relationship between its source table and its target table. For the underlying concept, see the transform map explainer.

The Enterprise Service Management Integrations Framework has its own set of maps. Creating a transform map requires the sn_hr_integr_fw.admin role. Navigate to Integrations Framework > Transform Maps. For every transformation, either select an existing transform map or create a new one with New. The framework lists six maps:

Transform map Source staging table Target table
HR Pull to-do transform map HR Pulled To-do Integration Staging HR Pulled Integration To-do
HR Profile Transform Map HR Profile Staging HR Profile (sn_hr_core_profile)
Job Transform Map Job Staging Job (sn_hr_core_job)
Department Transform Map Department Staging Department (cmn_department)
Location Transform Map Location Staging Location (cmn_location)
Position Transform Map Position Staging Position (sn_hr_core_position)

The HR Profile map covers workers, future workers and effective workers.

The Oracle Cloud HCM integration uses five of these maps: HR Profile, Job, Department, Location and Position. Its components include tables, user roles and scheduled jobs, and the application is identified as sn_hr_oracle_hcm. For these maps, index the coalesce fields to improve transformation performance.

Import set tables and job tracking for Workday Learning

The Workday Learning integration uses two import set tables. The to-dos staging table receives Workday Learning tasks, and the user course activity staging table receives course activity for each user. All user activity data ships with the integration. To view or change the details of a specific activity, edit the subflow that handles it and then edit the record.

Each pull from ServiceNow to Workday Learning is logged in the track approval view. It shows when the job began and ended, when records started loading into the staging tables, and whether the job completed or failed partway through. Check this view after a failed run. For the wider Workday connector, see the Workday integration guide.

Frequently asked questions

Which Cornerstone setting forces a complete pull on the next run?

Set full-pull to True. It pulls all active users, all active trainings and incomplete to-dos. If the framework has no record of a last successful run, the first pull is a full pull regardless of the setting.

Why does a Cornerstone certification not appear in the To-do list?

Only the child topics of a certification appear as To-do tasks in Employee Center. The certification record does not, so the learner sees the individual topics they need to complete.

What does a Cornerstone status ID such as 25 mean?

Status ID 25 maps to Pending approval in Cornerstone OnDemand. The Status page in the application lists the value for each status ID, so check there when a task shows a number instead of a status.

How does ServiceNow match a Cornerstone user to an employee record?

It matches on email ID. Matching on CSOD ID, CSOD User or CSOD User ID requires an override of the getUser method in the CSODIntegrationsUtil script.

What should I check if an Oracle Cloud HCM transform is slow?

Index the coalesce fields on the HR Profile, Job, Department, Location and Position maps, to improve transformation performance.

Where can I see what a Workday Learning pull did?

Use the track approval view. It records when the job began and ended, when records loaded into staging, and whether the job completed or failed.

Related reading

For the wider HR integration, the HR Service Delivery overview places these connectors alongside the rest of the service. For the Employee Center side of the Cornerstone OnDemand flow, the Employee Center integration patterns guide covers how tasks reach the portal. Transform map runs that update existing records instead of duplicating them are covered in the transform map coalesce guide.