An audit engagement is the record that holds one audit from setup to close: its schedule, scope, auditors, approvers and result. You create it, move it through Scope, Validate and plan, Fieldwork, Awaiting approval and Follow up, and it closes once approved results have no open work left.
What the engagement record holds
The first save fixes the facts that each later step depends on. The number and name identify the audit. The type field classifies it by purpose, with choices such as Internal Audit, SOX Audit, IT Audit, Financial Audit and Regulatory Audit. The state field defaults to Scope, and the percent complete field is a number you update as work moves forward.
Ownership sits in three separate fields. The engagement lead is the audit supervisor who oversees and completes the engagement. The auditors field lists the people doing fieldwork. The approvers field lists the people who sign off the results. Keep them separate. The people in the Approvers field review the results and approve or reject the engagement when it reaches Awaiting Approval, so check that field before you request approval.
The schedule holds planned and actual dates. Planned dates are estimates you enter during setup. Actual fieldwork dates and durations are filled in from the audit tasks once they exist: the planned duration takes the longest planned task duration, the actual start takes the earliest task start, and the actual end takes the latest task end. If a fieldwork date appears that you did not type, check the tasks before you edit the record.
Creating the engagement
There are three routes into the same record, and your role decides which you can use. The workspace route runs from Audit, then Audit Workspace. From the Home page, open the Create list and select Engagement. It requires the sn_audit.manager and sn_audit_ws.supervisor roles. The standard route runs from Audit, then Engagements, then Create New, and requires sn_audit.admin or sn_audit.manager. The Audit Engagement Workbench shows engagements on a timeline view, and you can create a new engagement from it.
Choose the report template at creation, because it controls when a report can be generated. A classic template produces output from HTML, script or XML templates, and the Generate report button appears in Follow up or Closed. A Word template produces a Microsoft Word document, and the button appears in Validate, Fieldwork or Follow up. If you expect to publish findings while fieldwork is still running, choose Word. Only one report can be generated at a time.
Set the confidentiality flag on day one if the audit touches a sensitive area. It restricts the record to assigned users or groups. Also keep the two comment fields apart. Additional comments are visible to the customer, while work notes are private to the audit administrator and the audit supervisor.
The Other issues tab links issues that already exist. Removing a link leaves the issue record in place. Those add and remove controls become unavailable once the engagement is Retired.
Scoping entities in the Scope state
The Scope state is where the audit manager decides which parts of the business the audit covers. A financial audit, for example, might include the business services the finance department relies on, plus the finance department itself. For the wider concept behind scope, see the plain-language guide to ServiceNow audit management. Open the engagement while it is in Scope, go to the Entities related list, and select Add auditable units. The pop-up offers auditable units that already have entities created for them. Select the ones that belong in the audit and choose Add. With GRC Advanced Audit installed, an Add other entities button also covers entities that do not come from an auditable unit.
Adding an entity brings its risks, controls, test plans and indicator results in, but timing depends on the state. If the engagement is already in Validate, the risks, controls and test plans arrive immediately. Indicator results arrive when you click Validate, or Validate and plan. The label depends on the application set: Validate and plan appears with GRC Advanced Audit installed, and plain Validate appears without it. At that step, the direct controls and risks attached to each entity are scoped in, along with indicator results from the audit period.
Validating scope and staffing auditors
In Validate, the audit manager reviews what was pulled in, updates scope if needed, and can begin creating and planning audit tasks. Moving forward is a deliberate action. For a broader view of testing before sign-off, see the testing and acceptance checklist. Advance to Fieldwork starts fieldwork, and Request approval sends the results to approvers later.
Auditors can be named directly in the auditors field. Alternatively, use a resource plan when you need the audit team’s cost visible in planning. That route needs GRC Advanced Audit and Project Portfolio Management, and the plan must be in the Allocated state. On the engagement, open the Resource Plan related list and select Add Auditors. Resources in the plan’s Resource Allocations section are added if they hold the sn_audit.user or external auditor role together with the pps_resource role, and anyone already listed is not duplicated. The button requires sn_audit.manager.
Audit tasks during fieldwork
Work is split into audit tasks. Fieldwork covers control testing, interviews, walkthroughs and other activities, and each one is tracked as an audit task. To create an activity or interview, open the engagement, click New in the Audit Tasks related list, and pick the type in the Audit Tasks Interceptor. An activity can be created in Validate or Fieldwork. An interview can also be created while the engagement is in Awaiting approval.
Both forms share a parent audit task, an assignee, a description, planned and actual dates with calculated durations, and a confidentiality flag. An activity moves through six states: Open, Work in Progress, Review, Closed Complete, Closed Incomplete and Closed Skipped. An interview starts in Open. The interview adds a primary contact, other contacts to reach if the primary is unavailable, and a notes field for those contacts. Activities require sn_audit.admin and sn_audit.manager. Interviews require sn_audit.admin and sn_audit.manager.
During Fieldwork, auditors complete their tasks, and issues found during control testing attach to the engagement automatically. Auditors can also raise general issues, and managers can add tasks when scope turns out to need them. When the work is done, the audit manager records the result as Satisfactory, Adequate or Inadequate, with a justification in the opinion field. Control tests are created from the engagement in Audit Workspace. For the control testing side of this stage, see the evidence and control tests guide.
Approval, follow up and closing
In Awaiting Approval, the approvers review the audit task results and the issues raised, then approve or reject. Approvers start from the workspace tasks icon, which lists engagements assigned to them, including those waiting on approval. The Needs my approval button in the My pending tasks related list opens the approval record from the State column. Choose Approved or Rejected in the State list and save. The roles are sn_audit.user and sn_audit_ws.auditor.
The outcome depends on what is still open. Approved with open tasks or issues moves to Follow Up. Approved with nothing open moves straight to Closed. Rejected returns the engagement to Fieldwork. In Follow Up, auditors close out the remaining issues, tasks and milestones. Milestones appear when GRC Advanced Audit is installed. An engagement can also be closed as incomplete during Scope, Validate or Fieldwork.
| State | What happens | What moves it on |
|---|---|---|
| Scope | Entities are selected for the audit | Validate |
| Validate | Risks, controls, test plans and indicator results are associated | Advance to Fieldwork |
| Fieldwork | Tasks are completed, issues and result recorded | Request approval |
| Awaiting Approval | Approvers review results | Approve (onward) or Reject (back to Fieldwork) |
| Follow Up | Remaining issues, tasks and milestones are closed | Automatic once the open items close |
| Closed | Engagement complete | None |
Reading results across the program
The Engagement Overview gives leaders an executive view. It is shown to users with the Audit Administrator, Audit User and Audit Manager roles. It includes results by entity, entity and control counts per engagement, and single scores for satisfactory, adequate and inadequate closed engagements. It also shows control test effectiveness, an issue breakdown by engagement, state or response, an audit task breakdown, and a list of open tasks past their planned end date.
Will using ServiceNow make a climate disclosure assured, and what assurance evidence should the team prepare?
No. Using ServiceNow does not make a climate disclosure assured. Assurance is a conclusion an independent assurance provider reaches about a specific disclosure, against a named standard, for a stated period. ServiceNow can hold the records that provider will test, so the team’s job is to prepare traceable evidence before the engagement starts.
Software use does not create an assurance opinion
An assurance opinion is reached by an independent party after it tests a disclosure. A platform can hold the records that party will test, but it does not test the number. Phrases such as audit-ready describe an inspectable record, not an issued opinion.
The regime and the reporting period set the requirement
Assurance level and timing come from the regime that applies to the entity. Positions as of November 2026 are below, and each one needs rechecking before a reporting cycle.
- California: SB 253 requires limited assurance from 2026, but CARB’s enforcement discretion lets first-cycle submissions go in with or without it.
- Australia: ASSA 5010 phases assurance in, and reports for financial years commencing on or after July 1, 2030 must be audited.
- New Zealand: records and GHG assurance depend on adoption provisions and exemptions, so check each entity.
- Canada: OSFI B-15, which covers federally regulated financial institutions, does not currently expect external assurance, and CSDS 1 and 2 are voluntary unless mandated.
Evidence to prepare before an assurance engagement
Keep every item dated and tied to its entity and period.
- Applicability decision: which entities and periods are in scope, and any relief applied with its expiry date.
- Source records: utility, fuel, refrigerant, travel and procurement data, with units and periods checked and duplicates removed.
- Calculation evidence: the methodology version, each emission factor and its vintage, and the approved inputs, so a total can be reproduced.
- Estimate log: each estimate with its basis and owner. AASB S2 allows estimation in Scope 3 measurement, but the assumptions still need documentation.
- Approval trail: a named preparer, reviewer and approver for each published figure, with preparation and review kept apart.
- Narrative support: for AASB S2 and NZ CS, the governance, risk process, scenario analysis and metric definitions behind the text. An emissions total alone does not cover these.
A walk-through test to run before scoping assurance
Choose one published emissions figure and follow it back to the records and factor version behind it. Rebuild the figure from approved inputs and name the approver. Then correct one input and check that each dependent disclosure moves with it. If any step fails, repair the evidence trail before scoping an assurance engagement.
Questions to put to the vendor and the assurance provider
- Vendor: which calculation methods and factor sets are native in the installed release, and can you show a sample calculation?
- Assurance provider: which standard, scope, period and level of assurance applies to each disclosure, and which evidence items will be sampled?
Frequently asked questions
Who can create an engagement?
It depends on the route. The workspace route requires the audit manager role with the workspace supervisor role. The standard form requires the sn_audit.admin or sn_audit.manager role. Check that your account holds the role for the route you plan to use.
What happens to a control when its entity is added to scope?
Its direct controls and risks are scoped in when the engagement reaches Validate, and indicator results from the audit period come along too. You can review them in Validate and change the scope if something should not be there.
Why does my engagement show Validate instead of Validate and plan?
The label depends on whether GRC Advanced Audit is installed. The function is the same: it moves the engagement from Scope into Validate.
What happens if an approver rejects the engagement?
It returns to Fieldwork. The team addresses the points raised and requests approval again.
Can I remove an issue from an engagement without losing it?
Yes. Removing it from the Other issues tab removes just the link. The issue record stays in place and can be linked to another engagement.
What happens to an approved engagement with work still open?
It moves into Follow Up. Once the remaining tasks, issues and milestones are closed, it moves to Closed.
For the program overview, see the audit management hub. The roles and responsibilities guide explains who holds each part of this workflow, and the common mistakes guide covers setup errors that tend to appear during scoping.