OBLYTECH Logo
OBLYTECH Logo

Vulnerability Assessment Workspace in ServiceNow VR

The Vulnerability Assessment Workspace is where a vulnerability event manager turns a vulnerability of concern into a tracked assessment record. The record starts from a primary CVE or an affected product, takes a priority and an exposure level, collects the configuration items it touches, and can be escalated to a major security incident.

What the workspace is built for

The workspace is designed for zero-day work. It lets an event manager open a vulnerability event and assess it while the situation is still moving. Three triggers fit it: a zero-day flaw rated critical or high, new threat intelligence on a specific vulnerability, and rapid exploitation of a critical or high severity issue. In each case the same two questions come first. How exposed is the estate, and how quickly does the response need to move?

The workspace has three pages.

Page What it is for
Exposure Assessment Shows impacted assets for a vulnerability or a piece of software, runs standalone assessments, and creates vulnerable items
Vulnerability Assessment Runs the crisis workflow, from tracking an event through to declaring a crisis
List Holds a library of CVE, TPE and CWE entries

Confirm the supporting plugins are installed before you troubleshoot a missing menu. The workspace depends on the Vulnerability Crisis Management plugin 1.0, Vulnerability Response 20.0, Vulnerability Response with NVD 1.4.2, Vulnerability Response integration with CISA 1.2, Data Model for SBOM 1.1.2, Software Bill of Materials Core 2.0.2, Basic Software Asset Management or Software Asset Management Professional, and Major Security Incident Management 2.2.5, and a scheduled job named Vulnerability Assessment runs daily to keep the affected configuration items table current.

Creating an assessment record

Go to All, open the Vulnerability Assessment Workspace, select the Vulnerability Assessment icon and choose New. Enter a title, optionally pick a primary CVE, optionally set a CI filter, and submit. You need membership in the base system Vulnerability Assessment Event Manager assignment group, and the sn_vul_analyst.vul_event_manager role.

When you choose a primary CVE, its details fill the Details tab by default, and related CVEs populate the Vulnerability Entries tab, where you can add more. Leaving the primary CVE empty still produces a default record. Add CVEs on the Vulnerability Entries tab, and affected products on the Affected Products tab, as the assessment needs them.

Affected products have their own tab. Fill in Publisher and Product, which are mandatory, and optionally Version and Edition. If the software already appears in the table with its status set to false, the system does not create a second entry. It switches the existing entry to true, so check for that before assuming a product is new to the record.

The CI filter controls what gets collected. When the assessment runs, it gathers only the configuration items that match the filter. Without one, it gathers all CIs related to the vulnerability or the affected products. You can edit the filter later, and the change applies to the next run.

Working the Details tab

Field What it holds
State The current stage of the record
Priority A rating from 1 to 5
Exposure level A rating from 1 to 5
Source Read-only. Names the system that created the record, such as a value passed by the Exposure Assessment REST API. Empty for records made by hand
Risk Score Calculated automatically and not editable by default
Assignment Group and Assigned To Who owns the record and who is working it

Adding a primary CVE moves the record into the Pending Assessment state. From there you can widen it in two directions. The Vulnerability Entries tab takes further related CVEs, and the Affected Products tab takes the products the vulnerability affects. Removing either kind of entry is possible while the record is in New or Pending Assessment. After that, the Delete button stops appearing, so settle the list before you run the assessment.

Risk attributes and the calculated score

The risk attributes sit under the primary CVE, or under an affected product, and they feed the score. They are a mix of yes or no questions and short scales.

Attribute Values
Memory corruption, remote code execution, local privilege escalation, unauthorized access, DDOS Yes or no
User interaction, scope change Yes or no
Attack complexity Low, Medium or High
Attack vector Network, Adjacent network, Local, Physical or None
Privileges required None, Low or High
Confidentiality, integrity and availability impact None, Low or High, set separately
Remediation level Official Fix, Temporary Fix, Workaround, Unavailable or Not defined
Exploit code maturity Unproven, Proof-of-concept, Functional, High or Not defined

Report confidence records how sure you are that the vulnerability exists, and it belongs in the same set of inputs.

The score recalculates each time you save a change to these fields. The rules sit under the Vulnerability Assessment Risk Rule record in the calculator area, where you can add criteria and change the weighting of existing ones. Treat those rules as configuration, not as an edit to one record.

Setting priority and exposure level

Open the record, go to Risk Attributes on the Details tab, choose a Priority and an Exposure Level, then save. The priority does more than label the record. When you change it, the system updates the priority of each associated vulnerable item (VIT) and application vulnerable item (AVIT) whose source is ServiceNow. If an item is linked to several assessments, it takes the lowest priority number among them, which is the highest severity.

Take a vulnerable item linked to one assessment at priority 5 and another at priority 3. It takes priority 3, the lower number.

The roll-down has a boundary. It applies to items created through NVD assessments inside Software Asset Management, and to items created in the Vulnerability Assessment Workspace with the source set to ServiceNow VR. Vulnerable items imported from a third-party scanner keep the priority that the scanner integration assigns through its own severity mapping. If an expected change does not reach an item, check where that item came from before you suspect the record.

Adding affected CIs and creating vulnerable items

Assessments miss things. You can add a known affected asset by hand while the record is in Declared or Pending Assessment:

  1. Open the record from the workspace list and select Add CIs.
  2. Choose the configuration items in the dialog and select Add CIs again.
  3. Follow the background job from the notification using View Status.
  4. On the Assessment tab, refresh the Configuration Items (Host/Infra) widget.

Manually added CIs are stored in the Affected Configuration Items table with their source marked as Manual, so you can tell them apart from assessment results later.

Creating vulnerable items is a separate step that needs the admin role. From the Assessment tab, select the CIs without vulnerable items in the Configuration Items widget and choose Create Vulnerable Item. Associate the primary CVE as you go, so each item points back to its threat. Application vulnerable items follow the same pattern through the BOM Components and Product models widget, where the Business Application field supports targeted remediation and reporting.

Exposure views by software and by publisher

When a new piece of software is in question, go to Exposure Assessment, choose Assess by Software or Assess by Publisher, and select the discovery model. The Software Installations tab lists the active CIs linked to the software record, with their location in the Installed on column.

To export, choose a file type and delivery type, then select Export.

Linking an assessment to a major security incident

Escalation needs three roles, sn_vul_analyst.vul_event_manager, sn_si.analyst and sn_msi.workspace_admin, plus access to Major Security Incident Management. Start from the More Actions icon on the Details tab.

Option What you enter
Link to Major Security Incident An existing major security incident, picked from the list
Propose as Major Security Incident Detection date, justification and potential impact
Promote as Major Security Incident Detection date, estimated resolution date, justification and potential impact

Once linked, the connection shows on vulnerable items in the Vulnerability Manager Workspace and the other Vulnerability Response workspaces.

Where this workspace sits in the wider set

The Vulnerability Response guide groups the work into areas. This workspace is for judging an event. Its priority and exposure level roll down to the vulnerable items it creates (source ServiceNow VR), which the Vulnerability Manager Workspace monitors and manages. To see that handoff in practice, read about remediation tasks and vulnerable items, or the prioritization guide. If the workspace is not yet configured, the vulnerability response implementation page is the next place to look.

Frequently asked questions

Who can create a vulnerability assessment record?

Members of the base system Vulnerability Assessment Event Manager group, who hold the role sn_vul_analyst.vul_event_manager.

Do I need a primary CVE to create a record?

No. You can start from an affected product, and the system creates a default record if the primary CVE is left empty.

What happens to vulnerable items when I change the priority?

Items whose source is ServiceNow take the new priority. Items imported from a third-party scanner keep their scanner mapping.

Can I add configuration items the assessment did not find?

Yes, while the record is in Declared or Pending Assessment. They appear in the Affected Configuration Items table with their source marked as Manual.