Workforce Optimization for HR: Forecasting and Scheduling

Workforce Optimization for HR gives HR service teams one workspace to forecast staffing needs, build shift and schedule plans, publish rosters, and check adherence. Forecasts are built from historical data, converted into a headcount by a formula, and compared with the team calendar so managers can spot understaffed and overstaffed intervals early.

How the demand forecast turns history into a headcount

A forecast starts with a data collection definition. You name the collection, choose the source table, such as cases or interactions, pick the date field the forecast will project forward, and add conditions that filter the rows. The collection type defaults to Collection, so a scheduled job gathers the data. After saving, create a table index that uses the date field and the same conditions. The MetricBase plugin (com.snc.clotho) must be enabled first, and this setup runs under the sn_hr_wfo.admin role.

The resource conversion formula is the calculation that turns forecast volume into a number of agents. Its related links let you attach forecast configurations (FC) and forecast parameters (FP). The group forecast configuration then connects an assignment group to a formula. One forecast configuration can serve several assignment groups, but each assignment group can have only one forecast configuration, so a queue with a very different workload needs its own group.

Forecast parameters set the period length unit, the period length, the number of periods to forecast, and the algorithm. Periods are counted as seasons, so a one-day period length with 30 periods ends 30 days including the current day. A forecast can run for a maximum of 90 days. Updating a parameter creates the forecast in Draft, and Preview calculates it before anything is published.

Publishing is what makes a forecast drive the calendar. One forecast can be in Published state at a time, so publishing a new parameter deactivates the previous one. The Forecast resources for future job runs daily, applies the published parameters through the formula, and updates the team calendar.

Adjusting a forecast by hand

A manual adjustment overlays known changes in demand on a fixed window.

Adjustment unit What the value means Example with a value of 15
Percentage A percentage change on the forecast 15 percent more than the forecast
Number A count added to the forecast 15 more than the forecast

The value applies to each group in the groups table. In the worked case here, two groups with two agents each become 17 agents apiece under a value of 15, so the total reads 34. Save puts the adjustment in Draft, where it appears as a green line on the forecast model. Publish moves it to Ready to Publish, and the next forecast run applies it and marks it Published. End Now stops an adjustment that has already started, and publishing one adjustment returns the others to Draft.

Building shift plans, work shifts and breaks

Shift plans are built in the Shifts tab of the Manager Workspace. Open the Schedule icon, choose Shifts, and click the plus icon to add a work shift or an on-call shift.

A work shift needs a name, a time window with start and end times, a time zone, and the days of the week it runs. Selecting the agent time zone option makes the application read each agent’s time zone from the user record, which suits teams spread across regions that share one shift name. Without that option, agents on the shift follow the time zone you chose.

Breaks are added after the shift is saved. Each break has a name, a duration, an earliest start time, and a latest end time. For example, a one-hour break that can start no earlier than 11:00 and must end by 15:00 is staggered across agents. With four agents on the shift, the application offsets each agent’s break so the four together cover the shift span.

On-call shifts take a name, a group, a time window, a time zone, and days of the week. An on-call rotation is then created so the shift moves among employees.

Event types such as meetings, training and time off are created from the team calendar when you add an event.

Creating schedule plans and publishing them to agents

A schedule plan covers a span of dates for an assignment group. You enter a name, a start date, and an end date, then choose either the groups you manage or specific groups. Use the contextual side panel to add a work shift, then add agents to that shift. For the wider concept, see agent schedules.

Coverage shows as the plan takes shape. The Total coverage/demand row displays how many agents cover each shift in a day, and the day view compares scheduled agents with forecast demand for each hour. A cell reading 4/5 means four agents are scheduled in that hour and the forecast is five.

Publishing happens in two steps. Saving a work shift generates a preview on the team calendar. When the plan is right, select the schedule, save any edits, and click Publish. Draft schedules move to Published and appear on the calendar.

Copying a schedule gives you a starting point for the next period. The copy starts in Draft, with its start date set to today and its end date 30 days later. To change a published schedule, unpublish it, edit, and publish again. If the start date is today or earlier, the schedule stays Published and its end date moves to tomorrow. If the start date is in the future, the schedule and its agent schedules return to Draft.

Reading staff alignment on the team calendar

In the Manager Workspace, open the Schedule icon, go to the Team Calendar tab, and filter by assignment group and shift plan. The day view shows a Total resources needed row at 15, 30, or 60-minute intervals, and each interval is colored by how it compares with the schedule.

Color What the interval shows
Green Scheduled agents match demand exactly
Yellow More agents are scheduled than demand
Red Fewer agents are scheduled than demand
Grey Demand and scheduled agents are both zero

The week view uses one row, Total coverage/demand, with three indicators. A down arrow means the forecast is lower than the agents needed, an up arrow means it is higher, and a check mark means the two line up.

Tracking the live schedule, time off and shift swaps

The team calendar can be filtered by assignment group, location, and shift plan. Clock-in and clock-out times are the agent’s actual times, generated from login and presence changes, so they can differ from the planned shift.

Managers approve or reject agents’ time-off and shift-swap requests.

A manager can also swap an agent’s shift. From the team calendar, the manager points to the shift, clicks the Shift Swap icon, selects an agent who can work that shift in the Requested Shift section, and submits. This swap skips the approval process.

Measuring adherence and conformance

Adherence measures whether agents worked their scheduled times. It compares minutes worked inside the shift against the scheduled shift length plus any overtime. Conformance measures the work completed regardless of when it was done, against the same scheduled length.

The system generates the events itself. A clock-in is created when an agent logs in or changes presence to Available. A clock-out is created when an agent logs out or changes presence to Offline or Break. If an agent does not clock out, the system generates a clock-out 60 minutes after the shift ends by default.

Thresholds are set on the Schedule Adherence settings form. The defaults are:

Setting Default What it controls
Early check-in threshold 60 minutes Early start allowed before a shift counts as non-adherent
Adherence threshold 70 percent Minimum adherence before a flag
Conformance range 80 to 120 percent Lower and upper conformance bounds
Clock-out generation threshold 60 minutes Wait before an automatic clock-out

For example, a shift from 8 a.m. to 5 p.m. with a clock-in at 7 a.m. falls inside the default 60-minute early window, so the agent is not treated as non-adherent. Administrators can change these thresholds.

Organizing teams and KPI groups

Create a KPI group under Team Performance with its type set to Teams. A group holds up to five KPIs. Attach the group to assignment groups. A KPI assignment group can be associated with only one KPI type.

Frequently asked questions

Does each team need its own forecast?

No. One forecast configuration can serve several assignment groups. Each group can hold only one configuration, so a team with a very different workload needs its own group and formula.

Why does a newly published forecast not show on the team calendar straight away?

The published forecast reaches the calendar when the Forecast resources for future job runs, which happens daily.

Can I change a schedule after it is published?

Yes. Unpublish it first, make the change, and publish it again.

What happens if a time-off request is not approved in time?

Review pending time-off requests before the start date, because a manager decides each one.

For the wider set of HR service delivery topics, see the HR service delivery pages. Teams that run customer service use a separate product, described on its own customer service workforce optimization page.