The AI Search Admin console is a no-code workspace for configuring, testing and switching on AI Search. It also shows indexed record counts and query traffic in one place, and it is the entry point for editing result-card (EVAM) configurations. Opening it requires the ais_admin or admin role, while analytics views also need extra roles and one activation.
What the console covers
The console manages and monitors AI Search across search applications, and it supports both AI Search and ServiceNow Otto for AI Search. Its home page has four sections.
| Home page section | What it is for |
|---|---|
| Manage AI Search in your applications | Opens the settings of a supported application, or lists all applications that can use AI Search. |
| Indexed sources | Creates, views and edits the sources that decide which content enters the search indexes. See the indexed sources guide. |
| Track AI Search activity | Shows indexed document counts and search queries, with a refresh option and a link to the full dashboard. |
| AI Search with additional features | Finds and installs applications and plugins that extend AI Search inside a search application. |
Prebuilt configurations cover Service Portal, Now Mobile, Virtual Agent and other supported applications. Step-by-step help for Genius Results is included too, and the Genius Results guide explains that feature.
Installing the console and granting access
The console is the application sn_ai_search_admin, available from the ServiceNow Store, and installing it requires the admin role. Confirm that the application and its linked Store applications have valid entitlements. Then go to All, then System Applications, then All Available Applications, then All, search by name or ID, and select Install. If the application is missing, it may need to be requested from the Store. Afterwards, open it through All, then AI Search Admin, then AI Search Admin Home.
| Role | What it allows |
|---|---|
| admin | Installs the console and activates the Advanced AI Search Management Tools analytics solution. |
| ais_admin | Uses the console, reviews the AI Search dashboards, edits indexed sources and configures multimodal captioning. |
| analytics_admin or analytics_viewer | Views the AI Search analytics dashboard, alongside ais_admin. |
| portal_analytics_admin, portal_analytics_viewer, web_analytics_admin or web_analytics_viewer | Adds the same analytics dashboard access for portal or web analytics users, alongside ais_admin. |
| impersonator | Views NLU intents detected in queries, turns on debugging, and searches as another user in the Search Preview UI. |
Some profiles are gated as well. The ESC Portal Default Search Profile appears for users with the Employee Center administrator role, sn_hr_sp.esc_admin. If a profile is missing from a filter, check the role first. For background on NLU, see the NLU model explainer.
Reading the AI Search dashboards
Two dashboards ship with the Advanced AI Search Management Tools application, and the console offers Performance Analytics indicators. For the other AI Search pages, start at the AI Search overview.
The AI Search dashboard
Find it under All, then AI Search, then AI Search Analytics, then Search Index Analytics. It has two tabs.
| Tab | What it shows |
|---|---|
| AI Search Index | Total Indexed Documents, documents by indexed source and by month, documents by search profile, and counts of profiles, sources, dictionaries, Genius Result configurations and results improvement rules. |
| AI Search Query | Queries by search profile, by language, and run against the index across the chosen time frame. |
Total Indexed Documents can be higher than the number of records a user can search, because search source filters exclude some indexed records. Selecting a segment of the source chart drills into that source’s tables.
The AI Search Profile dashboard
This view sits under All, then AI Search, then AI Search Analytics, then Search Profile Analytics. It covers one search profile, with queries by application and queries by month. Profile setup is covered in the search profiles guide.
Performance Analytics indicators
These indicators in the console track and monitor the search applications.
The AI Search analytics dashboard
This view goes deepest. It shows how people search one search application. Open All, then Usage Insights, select the Launch Dashboard link for the application, then the Search Analytics icon or link in the modules menu. If it does not load, the application may not be sending analytics data yet, so follow the Configure Service Portal steps to enable it. For the wider application, see the Usage Insights guide.
Filters and date range
The application filter accepts one configuration at a time. The list includes configurations used by service portals, Next Experience workspace and global search, Mobile Platform search, and Now Assist in Virtual Agent enhanced chat. The date range defaults to the last 30 days, and the dashboard keeps 180 days of data. A date outside that window produces an error and the dashboard reverts to the last valid range.
Overview metrics
| Metric | What it tells you |
|---|---|
| Search users | Unique users who submitted a search. Searches made while impersonating another user are ignored. |
| Total queries | Search queries submitted in the range, with a trend. |
| Searches over time | Queries executed, results clicked, and Genius Result answers clicked. |
| Average response time | Mean response time in milliseconds, with a distribution. |
| Average click position | Average position of the results users select. |
| Self-Solved Rate | The share of queries that produced a result click. |
Query lists
Each entry in the queries section shows the text, the click position of the first result selected (0 if none), the Genius Result type that answered it, language, geography, organisation and date. View all opens the underlying records in the sys_search_event table.
Four ranked lists sit alongside: Top queries, Queries with no clicks, Queries with no results, and Top clicked results. The no-results list helps spot questions your content does not answer.
Getting the dashboards to populate
Activating the analytics solution
The dashboards depend on the Platform Analytics Solution. You need the admin role, and the Usage Insights API application from the Store must be active.
- Go to All, then System Applications, then All Available Applications, then Available To Obtain From Store.
- Find Advanced AI Search Management Tools and confirm your entitlements. You need a Now Support account with permission to request applications for the instance, and the account and instance must belong to the same company.
- Install the application.
Three menus then appear under AI Search: the two dashboards and the Search Preview UI. The dashboards start empty and can take up to an hour to fill.
If a dashboard reports a denied read on a table from the Advanced AI Search Management Tools scope, an administrator needs to create a cross-scope access privilege for that table.
Scheduled jobs behind the figures
Four scheduled jobs in the sn_ais_admin_tools plugin refresh the numbers. The by-month document job runs every minute, and the others run hourly. Pausing Update Search Analytics Data slows the analytics dashboard and leaves it showing the metrics from its last run.
Customising the console and its views
Replacing the analytics banner logo
As an admin, switch to the Advanced AI Search Management Tools application. In the UX Theme Asset table (sys_ux_theme_asset), delete the header_for_dashboard record, then create one with Category set to Image and Name set to header_for_dashboard, attach your logo and submit. Then, in the SearchAnalytics Dashboard Theme record of the UX Theme table (sys_ux_theme), edit the asset under the Legacy: Experience Theme tab so its Asset field reads header_for_dashboard, and select Update.
Customising result cards with EVAM
Entity View Action Mapper (EVAM) standardises how different data sources appear in cards and lists. Each card is built from a view template that maps entity fields to display components, and an action can run a server script or client action, or navigate within the platform.
Managing hybrid search
Hybrid search combines meaning-based matching with keyword matching. When it is switched off, results come from keyword matching alone. It is available from ServiceNow Otto for AI Search version 15.0, and at least one indexed source needs semantic fields and semantic indexing before you can turn it on.
Hybrid search improves relevance for most experiences, especially when people type questions or descriptive phrases. Exact values such as record numbers, IDs and codes return more predictable results from keyword search. An upgrade leaves your existing hybrid setting unchanged.
Multimodal captioning
Captioning describes images and other visual attachments from supported sources, so text search can find them. It currently applies to Knowledge records and to content from external content connectors, and it has been validated for English content only. It requires the Platform Multimodal Service plugin (com.glide.platform_mm_service), and the options stay hidden without it.
With the plugin installed and the ais_admin role, go to All, then AI Search Admin, then AI Search Admin Home, then System Properties. In the Multimodal captioning section, choose a provider, which is the visual language model that writes captions, then a model, and select Save. If your provider is missing, approved third-party large language models can be configured through AI Control Tower (AICT). For the AICT side, see the AI Control Tower overview. NowLLM does not support captioning.
Frequently asked questions
Why does the AI Search dashboard show nothing right after installation? The dashboards start empty after the Advanced AI Search Management Tools install and can take up to an hour to fill.
Why are searches from the last hour missing from the analytics dashboard? The dashboard caches source results for 60 minutes. Recent searches appear once the cache refreshes.
Who can open the AI Search Admin console? Users with the ais_admin or admin role. Installing the console itself requires the admin role.
Which roles open the analytics dashboard? ais_admin, plus one of the analytics, portal analytics or web analytics admin or viewer roles.