ServiceNow Otto for Contract Management Pro reads a contract document against the clauses your organization expects, then flags non-standard and missing clauses. Fulfillers review those flags in the Microsoft Word add-in, replacing clause text, adding a missing clause or ignoring a suggestion. Ask Otto can also summarize a contract or answer questions about it.
Who can do what
Each step checks a specific role, so confirm yours before you open a contract request. For the intake side of contract review, see the legal contract review intake page.
| Role | What it lets you do |
|---|---|
| sn_cm_gen_ai.ai_contract_fulfiller | Start AI analysis, review clause suggestions and extract metadata |
| sn_cm_core.contract_fulfiller | Preview documents and use Ask Otto summaries |
| sn_cm_core.contract_reviewer | Review the contract document during the internal review task, using comments and redlines |
| sn_cm_gen_ai.ai_contract_config | Configure use case and clause mappings for the skill |
| sn_cm_gen_ai.ai_contract_admin | Activate and deactivate the skills in AI Admin Hub |
Analysis starts from the Work in progress state, and the person running it must be assigned to the request as a collaborator or group manager. Before the first run, verify that AI has data access for your role.
How the analysis produces suggestions
The analysis runs on the latest revision of the contract document, so confirm that revision is the one you want reviewed before you start. Only Microsoft Word (.docx) and PDF files can be analyzed. A PDF can be analyzed, but its suggestions cannot be acted on, so work from a Word file whenever you expect to make changes.
When you submit, the platform makes a copy of the document and runs the analysis on that copy. The contract status moves to Awaiting review, and a card appears for each document. The analysis then moves through the states below.
| State | What it means |
|---|---|
| Not started | Analysis has not been requested for this version |
| Analysis in progress | The analysis is running |
| Ready to review | Suggestions are ready for review |
| Completed | Suggestions have been reviewed and marked complete |
| Canceled | The analysis was canceled |
| Error | An error occurred while starting or running the analysis |
When the state reaches Ready to review, the side panel shows two counts: deviations still pending and reviews already completed. Selecting a document card shows the reason each clause was marked non-standard. The contract fulfiller, the collaborator and the assignment group manager each receive an email notification, and the activity stream records the analysis details.
If you analyze several documents at once, the list shows a status for each one before you submit. Ready to analyze means the latest version can be sent. Not configured means no configuration exists for that document’s contract type, and a configurator needs to set it up. File type error means the format is not supported. Resolve any document that shows Not configured or File type error before you select Analyze contract.
Choose the right storage before you open the file
Where the contract document is stored decides how you edit it, so check the storage configuration before you open the file.
| Storage | What happens when you open the document |
|---|---|
| Internal storage | The document downloads to your computer |
| Microsoft OneDrive | The document opens online, and you can edit it online or download it |
| Google Drive | The Word add-in does not work on the opened file, so download it and work offline |
If you work offline, you must upload the edited file again by creating a revision in the contract request. Until that revision exists, your edits do not reach the contract request.
Work through pending reviews in the Word add-in
Suggestions are acted on in the Microsoft Word add-in for ServiceNow Contracts. The side panel lets you view them.
- Open the contract document, then select the ServiceNow Contracts add-in from the Word ribbon.
- Sign in with your fulfiller credentials. The add-in has two tabs, Review analysis and Clause library. Pending reviews and Completed sit under Review analysis.
- Select Pending reviews. This list holds the non-standard and missing clauses that still need a decision.
- Select a non-standard clause card. Word moves to the clause that the card refers to.
- Read the card, then replace the clause or ignore the suggestion.
- Work through the missing clause cards in the same way, adding or ignoring each one.
- Open the Completed tab to check the actions that were recorded.
- Mark the review complete when you have finished.
Reading a suggestion card
Each non-standard card contains an AI comment, which gives feedback on that clause and the responses you would expect to see in it. The card also contains a standard clause suggestion taken from the clause library. Show more and show less expand or collapse the text. Use the AI comment to decide whether the deviation matters in your negotiation, and use the standard clause to decide what should replace it. The suggestion is a proposal, so check it against your own requirements before you accept it.
Replacing a non-standard clause
Select the clause text in the document that needs to change, then select Use this clause. The card moves to the Completed tab with the action recorded. To leave the original text in place, select Ignore instead.
Adding a missing clause
A missing clause card offers the same two choices. Use this clause inserts the suggested clause into the document, and Ignore dismisses the suggestion without changing the text.
Giving feedback on suggestions
Each suggestion has thumbs up and thumbs down icons. Selecting either one opens a pop-up where you can choose the options that describe your experience. You can select more than one option and add a comment, then select Submit. Submitted feedback is recorded in the Contracts Gen AI Feedback table and is meant to improve analysis accuracy over time.
Add clauses from the clause library
The Clause library tab lists the standard clauses that are active for the contract type of the document. Search by clause name, place the cursor where the clause belongs, and select Use this clause.
Open the library from the Clause library tab in the add-in while you work through the review.
When the inserted clause contains a valid metadata mapping, its fields fill in automatically. Without a valid mapping, the add-in inserts a content control tag name, and someone must update the metadata by hand. The suggestions depend on clause mappings maintained by a configurator. In AI Admin Hub, the Contract analysis tile lets a configurator edit a clause mapping, deactivate it for later reactivation, or delete it. The AI uses the current mappings to decide which suggestions appear, so check the mapping whenever a suggestion looks wrong.
Get a summary or FAQ with Ask Otto
Ask Otto works on contract documents that you open in the document viewer. Three things must be in place first: the smart documents skill must be activated, your role and the relevant tables must be configured for contract summarization, and the ServiceNow Otto panel must be enabled. The role that uses this feature is sn_cm_core.contract_fulfiller.
- Open the contract request from your workspace and go to the Contract documents tab.
- Select Preview document, choose the contract type in the Preview document window, and select Preview.
- When the document opens in the viewer, select Ask Otto.
- In the panel, choose to summarize the contract, generate FAQs from it, or ask a specific question.
You can run the same summary and question features on supporting documents and signed contracts from the document viewer. For the records and renewals side of the same product, see Contract Management Pro records and renewals.
A summary helps you find the relevant clause, but the clause text decides the position. Open that clause in Word before you act on it.
Mark the review complete
Mark as complete closes the review. Select it, then confirm with Yes, or select Cancel to keep working. Confirming updates the file in the configured storage and changes the contract status to Review completed. The request itself stays in Work in progress. For contract changes that amend an existing agreement, see the amendments and parent-linked requests page.
After you mark the review complete, no further actions are possible on it, even if pending items remain. Check the Pending reviews tab before you confirm, and make sure each deviation you intended to decide has a result. For the obligations a contract carries after the review, see the obligation management tasks page.
Common mistakes to avoid
- Running the add-in on a file opened from Google Drive. Download the file first.
- Expecting to act on suggestions for a PDF. The add-in works on Word documents, so open a .docx copy to make changes.
- Editing offline and forgetting to upload the file as a new revision.
- Marking the review complete while pending items remain open.
- Treating a summary as a replacement for the clause text it points to.
For more pages on ServiceNow products and processes, visit the IT asset management section of this site.