The ServiceNow Claroty integration brings Claroty CTD vulnerability data into Operational Technology Vulnerability Response, linking detected vulnerabilities to OT devices for prioritization and remediation. Set up the required applications, assign access by task, run NVD and device imports in sequence, then validate detection mappings before handing scheduled imports to the operations team.
Plan the ServiceNow Claroty integration around device context
A vulnerable item connects a vulnerability with an OT device or configuration item. That relationship makes the device import part of the implementation, alongside the vulnerability feed. Start by identifying who owns the Claroty connection, the CMDB device records, and the response workflow. Agree which site teams will review the resulting work.
The integration connects to the Claroty Enterprise Management Console and retrieves OT device vulnerabilities. Assignment rules can route vulnerable items to local site teams. Decide how those teams will accept responsibility before scheduling imports. Otherwise, a technically successful transfer can leave records without an agreed operational owner.
For acceptance testing, choose a representative device. Record its Claroty identity, expected configuration item, and known vulnerability before configuration begins. This gives the team a concrete relationship to trace, rather than treating a populated list as sufficient evidence. For broader design choices, use the threat intelligence integration patterns alongside this CTD workflow.
The steps here use Brazil behavior; check application compatibility, labels, and access on your instance and release before changing the setup.
Install the applications and separate the access decisions
Installation requires the admin role. Confirm valid entitlements for the application and its associated applications. Have CMDB CI Class Models and Service Graph Connector Integration for Claroty CTD installed before installing Vulnerability Response Integration with Claroty CTD. The CI class models supply the OT extension classes used by this integration.
- Open All > System Applications > All Available Applications > All.
- Find Vulnerability Response Integration with Claroty CTD by name or its application ID, sn_clarotyctdvr.
- Select an available version and choose Install.
- Check the dependencies in Review Installation Details, resolve any entitlement prompts, and select Install.
The installation also includes the Vulnerability response plugin and Vulnerability Response Integration with NVD. Record both dependencies in the handover so the next administrator can account for their presence.
Keep installation authority separate from day-to-day operation. Assigning application roles also requires admin, but that does not make admin the operating role for the integration. Write down the intended action for each person or group first. As a review practice, compare those intended actions with the permissions granted.
Assign Claroty CTD roles to users or groups
An administrator assigns roles through the platform user administration feature, either to users or to groups. Choose the assignment approach that matches your access management process. For group assignments, review membership as part of the implementation so access does not depend on an outdated team list.
- OT VR Integration Viewer [sn_otvr.integration_viewer]: permits viewing OT VR integration records.
- OT VR Integration Admin [sn_otvr.integration_admin]: permits configuring and executing the OT VR integration.
- MID server [mid_server]: permits configuring a MID Server.
For acceptance, validate access with the intended working accounts. A reviewer should be able to inspect the integration records; the operator needs the configuration and execution permission. Treat MID Server configuration as its own responsibility when it forms part of the deployment. Avoid using a successful test with a broad administrator account as the acceptance test for a narrower operator account.
Claroty-side permissions need attention too. Enable View access for Visibility, Investigation, Threat Detection, and Risk and Vulnerabilities for the user collecting data into ServiceNow. Record the permission categories without placing credentials in the handover. If the connection is being transferred between teams, confirm who maintains that account.
The security and access design guide helps organize the ownership review. The CTD role assignments above remain tied to their specific actions.
Configure imports in an order that preserves the relationship
Open Claroty CTD Vulnerability Integration > Admin > Setup to reach Claroty CTD Vulnerability Integration Guided Setup. The connection procedure requires admin and starts with selecting the Vulnerability Response Integration with Claroty CTD application scope. In Connection Manager, enter the EMC connection details and select a MID Server if required for an on-premises EMC. Save the configuration, then test the connection. A successful connection test produces Results 200; follow it with the device and detection checks below.
Run the National Vulnerability Database integration before running the Claroty vulnerability integration. NVD populates published CVE records in ServiceNow. Then run the Service Graph Connector for Claroty CTD before the vulnerability integration, placing the vulnerability run immediately after the connector run so it uses current CMDB information.
These prerequisites address different parts of the resulting record: NVD supplies the vulnerability reference, while the connector supplies device context. In your run plan, name the owner and completion check for each prerequisite.
The setup includes Delta Import for vulnerabilities, Auto-Closure Integration for closing corresponding ServiceNow Vulnerability Detections, and Full Import for a device’s entire vulnerability inventory. Decide which behavior the acceptance exercise needs, then validate its outcome. Keep initial data population and ongoing changes as separate test cases.
For help planning this work, see ServiceNow implementation.
Trace detection mappings before accepting the first run
Start with the representative device chosen earlier. Trace its detection from the Claroty fields to the ServiceNow fields, keeping the source value and destination value together in the test record. For troubleshooting, this comparison helps distinguish transport, mapping, and identity questions.
- Source is set to Claroty CTD.
- Identified_on maps to First Found, and Last_updated maps to Last Found.
- Status maps to Status: 0 means Open, while 2 means Closed/Fixed.
- Resource_id resolves the Configuration item through a CI lookup rule searching sys_object_source for the Resource ID.
For a missing device association, compare the source Resource_id with the identity available for the imported CI. Then review the connector run preceding the vulnerability import. Do this before changing mapping logic: the lookup depends on source identity, so a visible device name alone does not establish that the expected match is available.
For status checks, retain the source numeric value alongside the resulting destination status. For date checks, compare First Found and Last Found separately. This makes the evidence specific enough to investigate an unexpected result without repeating the whole import blindly.
These CTD field comparisons can serve as explicit sign-off criteria within the testing and acceptance checklist.
Hand over a repeatable operating check
Before scheduling unattended operation, ask the operator to demonstrate the workflow using the assigned account. Retain the prerequisite run sequence, representative device, detection comparison, and agreed remediation owner. Record what the team will inspect when imported data looks incomplete.
The integration can run newly detected vulnerability imports on a schedule you choose. Select a cadence that the teams can support, with the connector-to-vulnerability sequence built into the plan. Give the receiving site team a clear route for reporting incorrect device associations or unexpected statuses.
Separate permission, prerequisite, identity, and field-value checks in the support notes. That division helps the next responder choose the first investigation step from the symptom. The threat intelligence troubleshooting guide provides a broader framework for organizing those investigations.
Make the acceptance record usable during an incident: identify the device tested, the source platform, the operator account, and the values compared. Write down unresolved differences and assign someone to investigate them before declaring the feed ready. If the first sample passes, choose another device from a different receiving site to test the handoff assumptions. This is a recommended review approach, with the sample size determined by your deployment scope and the teams accepting the data.
Questions about CTD inventory and vulnerability references
Why might the EMC feed provide fewer CVEs than expected?
The Claroty CTD EMC platform insights API has a limit of 10 CVEs provided to ServiceNow. The xDome platform does not have that limitation. Identify the source platform when reviewing completeness so an API constraint is considered before the team changes import settings.
Does the integration create a new vulnerability entry for an existing CVE?
A vulnerability entry is created when the CVE is absent from National Vulnerability Database Entry [sn_vul_nvd_entry]. When investigating a missing new entry, check whether that CVE already exists there before deciding that the import failed.
How can reviewers recognize entries backfilled by Claroty?
When the integration creates a CVE entry, it adds [Claroty] to its Summary. Include that marker in the review notes when distinguishing a Claroty-backfilled entry from a previously populated vulnerability reference.
Which source fields populate a newly created vulnerability entry?
Cve_id maps to ID, Title to Summary, Cvss to V3_base_score, Published to Date_published, and Modified to Last_modified. Compare these entry fields separately from detection fields; they describe the vulnerability reference rather than the device’s detection history.