To create a legal contract intake workflow, configure a record producer for the appropriate contract request table, connect it to an intake form in the Contracts practice area, and set the document and ticket visibility rules. Test the complete submission path so the request, contract details, and employee document access work together.
Choose the contract application before configuring intake
Start by identifying the installed contract application and the request type you want employees to submit. An NDA created from your organization’s paper, a review of a third-party contract, and an amendment need different intake choices. Write down which document starts the process and whether external signatures are required before choosing a record producer.
The configuration paths below distinguish Legal Simple Contracts from Contract Management Pro for Legal Service Delivery. Legal Simple Contracts is deprecated. It is no longer supported and cannot be newly activated. If your organization already runs it, plan a data migration to Contract Management Pro for Legal Service Delivery, which is a separately licensed application. Check your installed application and release before applying these settings; the target tables, configuration roles, and application scopes differ.
For the wider relationship between intake and legal operations, see ServiceNow Legal Service Delivery. Keep this workflow focused on contract requests rather than collecting unrelated legal work in the same form.
Build the record producer that receives the request
Configure Contract Management Pro intake
The contract intake configuration procedure lists sn_lg_cnt.contract_config and admin as the required roles. Navigate to All > Legal Administration > Legal Catalog > Record Producers. Select New to build a producer, or open a base producer and select Copy to retain its starting configuration.
The base producers include Non-disclosure Agreement, third party Contract Review, and Contract Amendment and Renewal request. Choose the starting record according to the request being introduced. Copying an NDA producer for a third-party review deserves particular scrutiny because document generation and supplied-paper behavior differ.
Set Table name to Legal Contract Request [sn_lg_ops_contract_request]. Add input fields through New in the Variables related list, and map variables to the corresponding columns in that table. Review the mapping field by field: a clearly labeled question can still send its answer to the wrong destination.
If the requester chooses the contract type, add a Reference variable through the Variables related list. In Type Specifications, reference Contract type [sn_cm_core_contract_type]. Keep the choice of contract type distinct from the catalog category that helps employees find the form.
Configure an existing Legal Simple Contracts installation
In Zurich and earlier releases, the Legal Simple Contracts intake procedure uses the sn_lg_contracts.contracts_config role and the General Contract Support [sn_lg_ops_general_contract_support] table. Legal Simple Contracts is deprecated, so use this path only to maintain an existing installation. Use that target for this application path rather than substituting the Contract Management Pro request table.
For a producer dedicated to one contract type, configure contract_type for the intended type. Validate the stored value against the type you intend to create instead of copying a numeric example into unrelated configuration. Record both the producer and its target table in your implementation notes so a later administrator can identify the chosen path.
Connect the category and Contracts practice area
Creating or changing a legal catalog category requires sn_lg_ops.legal_catalog_admin. Navigate to All > Legal Administration > Legal Catalog > Maintain Categories, then select New for a category or open an existing one. Use a distinct Title and select Legal Operations Catalog in Catalog.
Complete Description with wording that helps an employee distinguish this contract request from neighboring services. The description appears beneath the category name on the Legal Service Portal. Review Active, which controls portal availability, and Parent, which places the category within the catalog hierarchy. Select Submit after completing the category.
Associate the producer through the category’s Catalog Item related list, then associate the category with the practice area. This connects the catalog category, producer, and practice area used for request assignment. A category can look correct in isolation while the mapping still points to a different intake path.
Add the intake form in the Contracts practice area with these settings:
- Set Type to Request.
- In Options, select Assigned To field not mandatory.
- Set Request record producer to the producer prepared for this contract intake.
- For third-party intake, leave Generate Document from Template disabled.
- For a Contract Management Pro amendment intake, enable Amendment request indicator.
Check the finished form from the requester’s perspective. The category should lead to the intended contract service, and submission should use the selected producer. For the neighboring process of collecting a contract for review, see legal contract review intake.
Configure signatures, documents, and template selection
When outside parties need to sign, select Edit in the producer’s Variable Sets related list and add External signatory details. Treat this as an intake requirement: decide what the requester must supply about the outside signer before testing the downstream contract process.
In Contract Management Pro, own-paper requests can include a supporting documents widget, while third-party paper requests can include an external signatories widget. Review the producer’s document collection needs alongside its variables. A field mapping check alone will not demonstrate that a requester can supply the supporting material needed for review.
For own-paper NDA intake in Contract Management Pro, create a contract template and include the new contract category in Conditions. Configure the contract template rules that select a template during request creation. For Legal Simple Contracts, create the applicable legal contract templates and selection rule, also using the new category in Conditions.
Use separate test cases for document generation and supplied-document review. The third-party form should not be configured to generate a document from a template. For generated NDAs, check that the selected category leads to the intended template rather than assuming that creating a template makes it the selected result.
For help planning this work, see ServiceNow implementation.
Make Documents and Preview available on the ticket
Complete this configuration in the scope for the application you selected: Legal Simple Contracts for that application, or Contract Management Pro for Legal Service Delivery for its intake path. Navigate to Standard Ticket > Standard Ticket Configuration and open sn_lg_ops_request.
- In Tab Configuration, open Documents.
- In Visible, add a category condition using Category, is, and the category created for this contract.
- Select Update to save the condition.
- Repeat the visibility configuration for Preview.
Test both tabs on a submitted request in the new category. Then compare a request from another category to check that your visibility change has the intended reach. Evaluate document creation and tab visibility separately: a missing tab and an incorrectly selected template point to different configuration checks.
Validate request creation and handoff
For custom Contract Management Pro intake forms, modify the business rule needed for data synchronization. Include that synchronization in acceptance testing by comparing submitted answers with the resulting request data. Do not treat a successful form submission as evidence that the custom intake has synchronized correctly.
Also include the Verify if Contract type is active script from the base Non-disclosure Agreement producer when the new producer must validate contract type availability. Without that validation, submission for an inactive contract type creates the legal request in Cancelled and does not create the contract request.
Build a short acceptance record around observable results:
- An active contract type creates the expected request with the mapped answers.
- An inactive type is handled through the configured validation path.
- Third-party review collects the supplied material without template generation enabled.
- An own-paper NDA selects the intended template through its category conditions.
- The resulting ticket presents Documents and Preview for the intended category.
Keep approval design as a separate decision after intake has captured the right information. Where contract handling connects to risk work, GRC issue workflows and approvals covers the adjacent workflow concern. A shared need for approval does not establish that two processes use the same configuration.
Intake settings to check during testing
Why does a request for an inactive contract type end up cancelled?
Without validation, a submission for an inactive contract type creates the legal request in a Cancelled state and never creates the contract request. When the new producer must check contract type availability, carry over the Verify if Contract type is active script from the base Non-disclosure Agreement producer, then confirm the failure path during acceptance testing.
Why should third-party intake leave template generation switched off?
Third-party review collects supplied material without template generation enabled, so the form has to gather that paper rather than produce a new document from a template. Leave Generate Document from Template disabled on that form, and have the third-party test case confirm that no template is generated.
What does a missing Documents or Preview tab point to?
Check the Visible condition on the Documents and Preview tab configurations against the new category first. A tab configuration shows its tab only when that Visible condition is true. Then check template selection as a separate step, because a missing tab and a wrongly selected template need different fixes.