To migrate to CRM Workspace from CSM Agent Workspace, separate reusable configurations from workspace-specific changes, configure the new experience through platform lists and forms or UI Builder, and test agent workflows before switching teams. Forms and ribbons can carry over; lists and list categories need separate attention, and shared changes can affect both workspaces.
Plan the move around configurations agents depend on
Start with an inventory of the work agents perform in CSM Agent Workspace. Include the records they open, the lists they use to find work, the information they scan before responding, and the actions they take to finish a case. Use this inventory as the migration checklist rather than treating the new workspace opening successfully as completion.
Group the inventory into reusable configuration, workspace-specific configuration, and items requiring investigation. Forms and ribbons are examples of configurations that work across the two workspaces without modification. Lists and list categories differ for CRM Workspace. Some configuration work happens through platform lists and forms; page and component changes can require UI Builder.
Record the owner and acceptance check for each item. For a case list, the check might be that the intended agent can find the expected cases. For a form, it might be that the information needed to handle that case appears in the right place. These are recommended migration controls, rather than additional product settings.
Keep the scope to the workspace transition. Changes to customer data or service processes need their own acceptance criteria, so record them separately from workspace work, with the CSM migration considerations page as the reference for that wider planning.
Check the target environment before configuring the experience
CRM Workspace functionality comes with Case Management Core, identified as com.sn_customerservice. Its workspace plugin is com.snc.uib.csm_agent_workspace. Before changing an existing installation, check what is already available, along with customer and product data, access management, valid CSM licenses, and the user roles needed for the intended work.
If Case Management Core needs installation, the setup route is All > System Applications > All Available Applications > All. Search for Case Management Core or its plugin ID, select the plugin card, and select Install. Treat installation as a separate prerequisite with its own completion check before testing workspace configuration.
Check release and instance details during planning, before any installation work begins: CRM Workspace depends on Customer Central starting with Yokohama, and an installation with domain separation and delegated admin enabled needs the administrative user in the global domain. Check these conditions on your instance and release before beginning installation work.
For access testing, navigate to All > Workspace Experience > Workspaces and select CRM Workspace, or use Workspaces > CRM Workspace. Test with the intended agent access as well as the account performing configuration. A workspace that opens for a configuration account still needs an agent workflow check.
Review communication channels and assignment alongside access. Chat, email, and phone setup provide the channels agents use; Advanced Work Assignment can route cases to agents or groups. Include routing setup when automatic assignment is part of the service process.
Migrate to CRM Workspace in separate configuration passes
Verify reusable forms and ribbons first
Begin with existing forms and ribbons, since they provide a starting point for the target experience. Open representative case, account, and contact records and compare the information agents need. Reuse does not remove the need to check the resulting experience, especially where teams have customized their daily work.
Separate the form itself from its surrounding presentation. CRM Workspace supports record pages, form headers, ribbon components, and a contextual side panel. A familiar set of fields does not prove that the record page, header values, or supporting tools are arranged appropriately for the agent’s task.
Handle lists and list categories explicitly
Build a separate checklist for list categories and filtered lists. Decide which baseline lists meet the team’s needs and which need adjustment or replacement. Include the records that should appear and the users who should see them. List configuration can tailor what appears by user role.
Test lists through a realistic sequence: find a case, open it, move to another record, and return to the work queue. This exposes navigation gaps that a visual review of list names can miss. Keep expected results specific enough that a service lead can accept or reject the result.
Use UI Builder for page and component work
Use UI Builder for changes to landing pages, record pages, and the Customer Central Customer Information tab. Decide whether a baseline page is sufficient before customizing it. Where a different layout is needed, include page variants in the design review rather than assuming a form change covers the entire record experience.
Coordinate these passes with the CRM Workspace setup checklist. This keeps migration-specific differences connected to the underlying workspace setup tasks.
Validate the tools surrounding the case record
Migration testing should extend beyond opening and updating a case. Activity Stream supports communication with requesters and internal notes. Agent assist presents search results associated with records. Include these tools in the inventory where agents depend on them, and define a visible outcome for each test.
Check the following groups as separate work items so a passing form test does not conceal an unfinished communication or search configuration:
- Communication: Agent Chat, Email Composer, and Email Viewer, with the conversations and records required by the team.
- Customer context: Customer Central, form headers, highlights, and ribbons that help agents understand the record.
- Finding information: Global Search sources and the contextual side panel tools used during investigation.
- Taking action: declarative actions, form actions, and the UI Action Bar functionality required to complete work.
For Customer Central, distinguish Customer Information from Customer History. The first provides customer information and recent touch points. The Customer History view shows the same recent touch points as a running feed, so agents can scan the sequence of contact in order. Ask agents to use each view during a case scenario so missing context is identified before the transition.
Form actions can connect to UI actions, while declarative actions provide configuration options for forms, fields, lists, and related lists. Inventory the actions agents actually use and test their outcome. Do not assume that seeing a familiar action label proves that the full task works.
For help planning this work, see ServiceNow implementation.
Control shared changes and accept the migration
Configuration changes in CSM Agent Workspace can affect CRM Workspace, and changes in CRM Workspace can affect CSM Agent Workspace. Treat the two experiences as connected during migration. For a configuration that is shared, include checks in both workspaces rather than treating the older experience as outside the test boundary.
A recommended acceptance sequence is to establish a baseline, make one bounded configuration change, and repeat the relevant agent scenario in each affected workspace. Record the result and the change responsible. This makes it easier to isolate a regression than reviewing several unrelated modifications together.
- Choose representative cases, customer records, and interaction scenarios that cover the team’s work.
- Test lists, forms, customer context, search, communication, and required actions with the intended users.
- Record differences as configuration issues, access issues, or workflow decisions, with an owner for resolution.
- Repeat affected scenarios after fixes and obtain service-team acceptance before changing the team’s working instructions.
Agree in advance which unresolved differences prevent adoption. A missing action needed to finish a case deserves different treatment from a cosmetic preference. Use the CSM configuration mistakes guide to inform the review, then keep the acceptance record tied to this migration’s actual findings.
Questions about migration boundaries and agent adoption
What if the team has not used CSM Agent Workspace?
Use the new-implementation guided setup path instead of preparing a legacy configuration inventory. Go to Customer Service > Administration > Guided Setup and find the CRM Workspace category (named CSM Configurable Workspace in the migration topic). Select Get Started there, then select Configure on the task to open Configurable Workspace Guided Setup.
Can agents keep several records open?
CRM Workspace supports tabs and subtabs for cases, tasks, and other customer records within one browser window. Include a short orientation on this navigation pattern when introducing agents to the experience, particularly if their current working instructions assume separate browser tabs.
How do catalogs fit into the target workspace?
Service catalogs let agents submit requests for customers from CRM Workspace. Include catalog selection when agents need this workflow, and identify which catalog items their service process requires. This is a distinct configuration decision from choosing the lists used to manage cases.
Does branding require replacing the workspace layout?
Theming and page layout are separate configuration concerns. Theme Builder supports creating and publishing themes, including a default theme, and agents can select among available themes. Decide on visual styling independently from changes to the information and components on a page.
What should agent handover material contain?
A recommended handover focuses on changes agents will encounter: where to find work, how to navigate customer context, and which actions differ from their previous routine. Base examples on accepted test scenarios. Keep unresolved items visible to the service lead so training does not disguise unfinished configuration.