OBLYTECH Logo
OBLYTECH Logo

Delegation of legal duties and approvals

Delegation of legal duties and approvals in ServiceNow lets legal fulfillers arrange cover for assigned requests, matters, matter tasks, and approvals during an absence. Platform delegation covers broad categories of work, while granular delegation uses predefined rules to select specific duties. Choose the method, delegate, period, and scope before testing the handover.

Choose the scope of delegation of legal duties and approvals

Start with the work that needs attention while the legal fulfiller is unavailable. A colleague covering approvals may need a different arrangement from someone handling a defined category of requests. Write down the intended coverage before selecting a delegation method. This gives the fulfiller and administrator a shared basis for checking the resulting access.

ServiceNow AI Platform delegation is active by default. It supports delegation of approvals, assignments, both approvals and assignments, and notifications. These options give a lawyer a way to limit broad delegation by the kind of responsibility being covered. For broader context on that mechanism, see ServiceNow approval delegation.

Granular delegation selects duties through predefined delegation rules. It is appropriate when the handover needs to cover a specific subset of assigned legal work. For example, a rule on Legal Request [sn_lg_ops_request] can use Category is Privacy to identify the relevant requests. The rule condition determines the scope; a description of the absence does not replace it.

The delegate gets the same level of access as the legal fulfiller for the delegated legal work. Granular delegation does not by itself grant record access: the delegate also needs the roles that the target table requires, and the access rules decide which matching records they can open. Treat the choice of scope as an access decision as well as a staffing decision. Before proceeding, agree which duties should be covered and which representative records will demonstrate that the arrangement behaves as intended.

Prepare granular delegation before the absence begins

Granular delegation requires the Granular Delegation plugin, com.glide.granular_service_delegation. An administrator must configure delegation rule tables, delegation rules, and the workspace list before lawyers use this method. The role required for the fulfiller’s granular delegation procedure is legal_fulfiller. Keep that action separate from the administrator’s setup responsibilities.

On an instance that still runs Legal Counsel Center Classic, the My Delegate workspace list on the Granular Delegate [sys_granular_delegate] table must be active, and the same list on the Delegate [sys_user_delegate] table must be inactive. Legal Counsel Center Classic is deprecated and cannot be newly activated, so on current installs use the Legal Counsel Center Workspace setting described in the next sentence. The corresponding list for Delegate [sys_user_delegate] must be inactive. In the new Legal Counsel Center Workspace experience, the My Delegates UX list must likewise use the active granular table list and inactive standard delegate table list.

These steps match the current release and the earlier releases that describe granular delegation. Check the workspace experience on your instance before applying them, and inspect the table behind a list rather than relying on its name, because the name alone does not show which delegation record the workspace will create. In particular, inspect the table behind the list rather than relying on the visible list name. A familiar name alone does not establish which delegation record the workspace will create.

Ask the administrator to make the required rules available before the fulfiller starts the handover. Agree on the record type and condition for each duty. A privacy request rule should be reviewed against representative privacy work and work outside that category. This makes the boundary clear before a colleague depends on it.

Create the delegation period and select the duties

A user with legal_fulfiller can create granular delegation through Legal Counsel Center. Have the colleague and coverage dates agreed in advance. The Delegate must belong to an assignment group of which the delegating user is a member. Confirm that relationship before attempting to save the arrangement.

  1. Navigate to All > Legal Request > Legal Counsel Center.
  2. Choose the list icon, then open My Delegates under Set Delegate.
  3. In the My Delegates list, select New.
  4. Set Delegate to the user who will cover the duties.
  5. Enter Starts and Ends for the delegation period, then select Save.
  6. In the Delegation Rules tab that appears, select Add Duties.
  7. In the Add Duties dialog, select the required delegation rules and choose Add.

Saving the delegate and dates establishes the delegation period. Selecting rules in Delegation Rules defines the specific duties to be covered. Treat these as two parts of the handover: a named colleague with a date range, and an explicit selection of responsibilities. Review both before telling the team that coverage is ready.

A handover note describes the work and the decisions it needs; the Delegate field and the selected rules decide what the colleague can see. Check the note against the rules once, before the start date. Keep the human handover and the saved configuration consistent so that the delegate knows what to expect when opening the work list.

Check access, approvals, and notifications together

During the specified period, the delegate can use Delegated to me to access and work on assigned legal requests, legal matters, legal matter tasks, and approvals according to the selected duties. Verify the outcome from the delegate’s perspective. A correct-looking setup form is not enough to establish that a particular request falls within the chosen rule.

Work that was already assigned before the Starts date may not move to the delegate automatically. Include one such open item in the acceptance check, and if it does not appear, update its assignment or the delegate record so it is picked up.

Prepare a small acceptance check around the intended scope. Select a record that should match and a record that should fall outside the rule. Check the record type and actual field values before comparing the result with the expected coverage. This is especially helpful when request categories have similar names or the handover spans different kinds of legal work.

  • Confirm the selected delegate and the saved Starts and Ends values.
  • Review the duties added through Delegation Rules against the agreed handover.
  • Check that representative covered work is accessible through Delegated to me.
  • Include an approval in the check when approval coverage is intended.
  • Verify that the expected activity notifications reach both participants.

Granular delegation sends activity notifications to both the delegating user and the delegate for the relevant legal work. Agree who will act on those messages so that two recipients do not assume the other person has responded. Notification delivery should be checked alongside access and duty selection, rather than used as proof that coverage is complete.

If the handover also touches governance review, use GRC issue workflows and approvals to consider the surrounding approval process. Keep the legal delegation check focused on the particular duties being handed over.

Resolve gaps by checking the delegation boundary

If expected work is missing, first compare the current coverage period with Starts and Ends. Then check whether the required duty was added and whether the record matches its rule condition. For a category-based rule, inspect the request’s category rather than assuming that its subject or short description puts it inside the scope.

If the required duty cannot be selected, ask the administrator to review the available delegation rules. The fulfiller selects from predefined rules in this procedure. A missing option should trigger a review of that configuration rather than a broader delegation chosen merely to finish the setup.

If the workspace presents an unexpected form, review the active workspace list and its underlying table. If the intended colleague is not suitable for selection, check the shared assignment-group requirement. These checks address different parts of the setup; changing the rule condition cannot resolve a delegate eligibility problem.

Keep a short record of the intended scope, the rules selected, and the acceptance result, so that a later question about coverage starts from the same facts. If a covered matter has a conflict of interest, check it before the delegate starts work on it, using legal conflict-of-interest handling.

For help planning this work, see ServiceNow implementation.

Questions to settle before handing over legal work

What should a handover note contain beyond the configuration?

Include outstanding decisions, approaching deadlines, relevant context, and the person responsible for resolving uncertainty. The saved delegation defines access and scope; the note should explain what the colleague needs to do with the covered work. Avoid putting unrelated case detail into a general team message.

How should a team prepare for a longer absence?

Review the expected work types with the covering colleague before the absence starts. Schedule a review of open items during the coverage period and agree how urgent questions will be handled. A longer period warrants closer attention to changing priorities, even when the initial delegation settings are correct.

What evidence helps an administrator investigate a coverage problem?

Provide the affected record, intended duty, delegate, period, and observed result. Include the relevant field value when a rule uses a category condition. A precise example lets the administrator compare expectation with configuration without starting from a broad report that delegation is broken.

Should a team widen delegation because one request is urgent?

First establish why that request falls outside the intended coverage. Decide whether the boundary is wrong or a different colleague should handle the item. Urgency is a reason to resolve the decision promptly, while a broader rule also changes the set of duties the delegate may receive.

What should happen when the legal fulfiller returns?

Reconcile open decisions, completed actions, and work that still needs attention. Compare the handover record with the remaining workload and check the configured end of the coverage period. This closes the operational handover and gives the returning fulfiller a clear starting point for continuing the legal work.