Remediation target rules in Vulnerability Response calculate when vulnerable items should be remediated, using a matching rule, a starting date, and a target in days. Set the conditions, reminders, and recipients, then apply the changes. For OT items, load the demo records and separate critical OT targets from critical non-OT targets.
Plan remediation target rules around vulnerable items
Start with the record whose deadline you need to control. A Vulnerability Response remediation target rule calculates a target for a vulnerable item. Application Vulnerability Response has a separate rule configuration for application vulnerable items, or AVIs. Choose the matching administration area before creating a rule, so your test records and rule conditions refer to the same population.
Write down the intended coverage before opening the form: the risk rating, whether OT devices belong in the population, the allowed remediation interval, and who needs a reminder. Treat this as a testable policy statement. “Critical OT vulnerabilities have their own target” needs a condition that distinguishes those devices from critical non-OT devices.
The target calculation uses Target from (date) plus Target (days). The default starting point is Last opened date. Days are measured in 24-hour increments. A rule saved today therefore does not automatically give an older vulnerable item a fresh interval starting today. Check the starting date on the record before deciding that its calculated deadline is wrong.
Risk selection and deadline calculation need to agree. Use vulnerability prioritization when deciding which risk populations need distinct targets, then express those choices in the rule conditions.
Create the rule and define its timing
Creating or editing a Vulnerability Response remediation target rule requires sn_vul.vulnerability_admin or sn_vul.admin (deprecated). Complete the initial assessment in Setup Assistant before setting up these rules. The OT configuration action described below has a different required role.
- Navigate to All > Vulnerability Response > Administration > Remediation Target Rules.
- Select New and give the rule a Name that identifies its population and purpose.
- Set Target (days) to the agreed remediation interval. Inspect Target from (date) to establish which record date anchors the calculation.
- Set Active and build the Condition that selects the intended vulnerable items.
- Set Notify (days before due), and select Users and Group for the people who need the notifications.
- Use Description to explain the policy decision, then select Submit.
Check field availability on your instance and release: Target from (date) is identified with V17.1, and recalculation controls also depend on installed application versions. Select a supported date or date-and-time field for the starting point. Keep the chosen date explicit in the test record so another administrator can reproduce the calculation.
Test the condition against realistic data volume. A condition that returns the expected sample records can still be expensive across a large Configuration Management Database. Measure evaluation time with the production-scale population before broad rollout. Record both the matching result and the time needed to obtain it.
Configure separate OT and non-OT critical targets
Configuring OT remediation targets or loading the associated demo records requires sn_sec_wf.manage_admin_rules. Navigate to All > Industrial Workspace > Guided Setup > Operational Technology Vulnerability Response > Remediation Targets > Configure. The alternative route is Workspaces > Security Exposure Management > Administration > Remediation target > Configure.
Load the Operational Technology Vulnerability Response demo data records for this configuration example. Industrial maintenance opportunities can be infrequent, so an OT device may need a different remediation deadline from another device with the same critical risk rating. The demonstration uses two records to express that distinction.
- Critical Risk Rating rule (OT only): use Configuration item.OT device details is not empty AND Risk rating = 1- Critical. Update Target (days) and activate the record.
- Critical Risk Rating rule (exclude OT): use Configuration item.OT device details is empty AND Risk rating = 1- Critical. Update Target (days), inactivate the existing critical target rule being replaced, and activate this replacement.
Activate both records. Activating the OT rule while leaving a broad critical rule in place can defeat the intended separation: an OT item may also match the shorter critical target. Remediation target rules are applied from smaller targets toward larger targets, and overlapping matches use the more restrictive deadline.
Validate the configuration with a critical OT item and a critical non-OT item. Inspect the referenced configuration item’s OT device details, rather than assuming its name identifies it correctly. A missing OT detail can place a device in the non-OT condition. Also test a noncritical item to confirm that the critical conditions do not include it.
For help planning this configuration, see ServiceNow implementation.
Apply the changes and prove the resulting dates
Saving a rule does not complete validation. New and updated rules take effect through the Evaluate remediation targets scheduled job or Apply Changes on the Remediation Target Rules list. The job is scheduled daily at 4:00:00. Check the job configuration when planning a test rather than assuming a saved rule has already been evaluated.
Apply Changes is the manual route for pushing an edited rule onto existing items. It skips anything already Closed, Deferred or Resolved, so a large estate makes the run slow. Do not start one while the daily evaluation job is running, because the system will not accept it. Plan the test around that constraint and inspect the resulting records after evaluation finishes.
Before broad activation, keep a short acceptance record for each population. Include one item expected to match and one expected to fall outside the condition. This makes a failed result easier to trace to the device data, the filter, or the timing calculation without changing several settings at once.
For each sample, capture the starting date, target interval, matching condition, expected deadline, and stored deadline. Check whether another active rule could produce an earlier date. Where matches overlap, the more restrictive rule wins; rule names do not establish priority.
Include an item without a target and an item whose existing target is later than the candidate rule’s date. The scheduled evaluation can populate a missing target or replace a later date with an earlier one. Rule evaluation also occurs on import and when a vulnerable item is reopened.
Keep grouping investigations separate from date investigations. Triage and grouping rules address how work is organized. Changing a remediation task’s grouping criteria is a different operation from changing the target calculation.
Check reminders and application rule coverage
Notify (days before due) establishes the reminder point before the deadline. Before that point, the list indicator is green; approaching the target, it is orange; after the target, it is red. Inspect the calculated dates behind the indicator when investigating an unexpected status.
Set recipients deliberately. Each rule sends its own summary email, and it goes out whenever some of its items are nearing their target or have passed it. Test with the intended Users and Group so a correct deadline does not mask a missing recipient. Record notification expectations alongside the deadline calculation in your acceptance checks.
For application vulnerable items, creating or editing an application remediation target rule requires the App-Sec Manager group. Navigate to All > Application Vulnerability Response > Administration > Remediation Target Rules, select New, complete the form, and select Submit. Use Rule applies to for the AVI selection criteria.
The three supplied application target rules are inactive by default. If you edit a supplied record, check Active before saving it. Verify application coverage independently from infrastructure coverage, because the reapply processes for Vulnerability Response and Application Vulnerability Response are independent. For the surrounding application policy decisions, see application remediation rules and exceptions.
Questions about target rule edge cases
What happens when a rule is deactivated?
Deactivating a rule clears the target dates it had set on items. An item that matches another active rule picks up that rule’s date; an item with no matching active rule loses its target and shows No Target. Review affected records when retiring a rule.
Can a reminder interval of zero send an advance warning?
Setting Notify (days before due) to 0 produces only a Target Missed notification, with no earlier reminder. Use a positive number if you want a warning ahead of the deadline. Choose a positive interval when the intended behavior includes warning before the remediation deadline.
Why can the notification count differ from a broad item list?
The notification email count excludes vulnerable items in Deferred, Resolved, or Closed states. Compare counts using equivalent state filters before treating the difference as evidence that a rule missed records.
Can a condition distinguish text by capitalization?
The condition builder offers no case-sensitive matching on this form, so build populations from real field values and relationships instead of capitalization. Avoid designing populations that depend on capitalization differences. Choose criteria that distinguish the records through their actual field values and relationships.
Where can an administrator inspect later rule activity?
Update History stays blank when a rule is first created. After that, the system logs its work notes there. Retain your acceptance checks alongside that history so a later deadline investigation can distinguish the policy originally tested from subsequent rule changes.