OBLYTECH Logo
OBLYTECH Logo

Create an application vulnerability entry manually

An application vulnerability entry describes a weakness affecting custom software and supplies the vulnerability reference for a penetration test finding. To create one manually in ServiceNow, use the Ethical Hacker role, open Application Vulnerability Response > Libraries > Third-Party, select New, complete the penetration test fields, and select Submit.

Decide whether an application vulnerability entry is needed

Start with the weakness identified during testing. The entry describes the vulnerability; the application vulnerable item connects that vulnerability with a potentially affected application. Keeping those purposes separate helps you avoid describing an entire test campaign inside a reusable vulnerability record.

For example, a tester might identify an authorization weakness in a custom order application. The entry should explain the weakness and its consequences. The penetration test finding then relates the vulnerability to the application where the tester observed it. A clear distinction makes later review easier when a similar weakness appears elsewhere.

You can reuse an existing vulnerability entry or create one during penetration testing. Before choosing New, review the entries available to you and compare their meaning with the observed behavior. Matching a broad category is insufficient if the existing entry describes different exploitation conditions or a different mitigation.

Application Vulnerability Response also imports application vulnerable items and supports remediation through rules. Manual entry is the route covered here for a penetration test vulnerability. Broader planning across applications belongs with application portfolio management; this record needs a focused description of the weakness.

Prepare access and the test evidence

The role required for the manual creation procedure is Ethical Hacker. Do not substitute an administrative configuration role for that action. Configuration is overseen by the App-Sec Manager user group, and assigning users to these groups requires the admin role through User Administration (Administration > Groups). These are distinct responsibilities.

Gather the test observations before opening the form. As a working checklist, prepare the vulnerability identifier, the conditions needed to exploit the issue, the security impact, and a proposed mitigation. Separate observed results from assumptions so that reviewers can see which conclusions still need validation.

For a hypothetical authorization finding, record whether exploitation required an authenticated account, whether another person had to interact with the application, and what information or functions became accessible. Those observations give the exploitability and impact fields a defensible basis. Avoid selecting a high impact simply because the application is business critical.

Check the form against your instance and release: weakness reference labels differ by release, with CWE entry used in 12.1 and Primary CWE in 13.0. The creation view lists Primary CVE while describing a CWE reference; other field descriptions use Primary CWE or CWE entry. Verify the reference target before selecting a record.

Create the record in the penetration test view

  1. Navigate to All > Application Vulnerability Response > Libraries > Third-Party.
  2. On Application Vulnerability Entries, select New.
  3. Complete the fields on the Application Vulnerability Entry form in the Penetration test view.
  4. Review the vulnerability details against the test evidence.
  5. Select Submit to save the form.

Use ID to identify the entry. Severity is the normalized rating the team reviews. Check it against the severity mapping that applies to the source before you copy a value across records. Category name carries the classification supplied by a third-party integration and can assist assignment. Where information originated in a manual test, keep your classification choices consistent with the team’s agreed vocabulary rather than implying that a scanner supplied them.

The weakness reference should describe the underlying failure. CWE represents types of software weakness, whereas CVE identifies publicly known vulnerabilities and exposures. A custom application finding can therefore need a weakness classification even when the tester has no matching public vulnerability identifier. Do not invent an identifier to make the record appear complete.

Review the proposed entry before saving, particularly when several testers work from the same report. Decide whether they are describing one reusable vulnerability or materially different weaknesses. That review reduces ambiguity when findings are later associated with applications.

Translate test observations into vulnerability details

The vulnerability details separate exploit conditions from consequences. Write down the reasoning for your selections as part of the assessment work. A colleague should be able to follow the assessment without guessing what the tester meant by a short severity label.

  • Attack vector: identify the route through which the vulnerability can be exploited.
  • Attack complexity: consider conditions outside the attacker’s control that exploitation depends on.
  • Privileges required: describe the access an attacker must already possess.
  • User interaction: consider whether successful exploitation depends on another person’s involvement.
  • Scope: assess whether the vulnerability can affect resources beyond its own security boundary.

Scope here is a vulnerability scoring metric. It is distinct from the platform concept explained in ServiceNow application scope. Treating those two meanings as interchangeable can produce an assessment that describes the platform’s packaging rather than the vulnerability’s impact.

Next assess Confidentiality, Integrity, and Availability. These three fields ask what an exploit could expose, alter or take offline. Record only the consequences the test actually showed. Distinguish what the test demonstrated from a plausible consequence that still needs investigation. An ability to read a restricted record does not by itself demonstrate an ability to change it.

The CVSS Vector string records the metric choices behind the score. The CVSS Base Score is a 0 to 10 number, so check that the score matches the impact selections before you save. Review the vector, impact selections, and score together for consistency. A contradictory combination needs investigation before the record becomes a reference for remediation decisions.

Write threat and mitigation text for a handoff

Threat should explain the security consequence of the weakness. Mitigation description should explain the steps proposed to address it. Keep the two fields distinct so a developer can understand both the reason for the work and the intended correction.

For the hypothetical authorization issue, a threat description could explain that an authenticated user can reach information belonging to another account under the tested conditions. A mitigation description could recommend checking authorization for the requested object before returning it. These are writing examples, not evidence that a particular application has that flaw.

Prefer a correction that addresses the weakness over a vague instruction to improve security. Include enough context for the receiving team to identify the affected behavior, then agree how the correction will be tested. Keep sensitive test material in the organization’s approved evidence process rather than adding unnecessary secrets to narrative fields.

If ownership, severity normalization, or routing still needs design, review Application Vulnerability Response configuration before scaling the workflow. For help planning this work, see ServiceNow implementation.

Verify the saved entry and the finding relationship

After submission, inspect the saved entry and compare it with your prepared notes. Check the identifier, weakness reference, severity, exploit conditions, threat, and mitigation. The goal is a coherent record that another tester can recognize and a remediation team can interpret.

Application vulnerability entries are stored in Application Vulnerability Entry, whose table name is sn_vul_app_vul_entry. That table extends Vulnerability Entry, sn_vul_entry, so an application entry also appears through the parent table.

Next verify that the penetration test finding relates the intended vulnerability to the intended application. Creating the library entry and establishing the application finding are separate checks. A correctly written entry can still support a misleading finding if the application association is wrong.

Once the finding is ready for downstream work, review remediation rules and exceptions for the next decisions. Creating a vulnerability reference does not show that remediation has been assigned, completed or accepted.

Reviewers ask four questions about severity, CWE entries, NVD and the Source field.

Should Severity be copied from an NVD entry?

Application Vulnerability Response derives Severity from imported Source severity rather than NVD. Check how the relevant severity mapping applies before transferring a rating from another record. A familiar label does not establish that two records use the same normalization.

Can an imported CWE record be rewritten to match a test?

The CWE vulnerability entry fields are read-only. Treat the imported weakness as a reference and retain the test-specific explanation in the appropriate assessment work. Changing a shared weakness definition would also blur the distinction between classification and observation.

Does a CWE reference require CVE enrichment?

No. No. Application Vulnerability Response does not use NVD data. A CWE entry can point to an NVD record for reference only, so assess the finding on its test evidence. Assess the finding on its evidence rather than waiting for enrichment to supply its meaning.

What can the Source field help a reviewer understand?

Source identifies the origin of the vulnerability, such as a scanner or a physical test. Use that distinction during review to understand how the information entered the workflow and which assessment context to examine when details need clarification.