Exception management in Configuration Compliance lets a remediation owner request a time-limited deferral when a task cannot be fixed immediately. Configure the approval route, populate its approvers, and set the allowed duration before requesting approval. An approved exception moves the remediation task to Deferred; it records risk acceptance rather than completion of remediation.
Separate requester access from approval membership
Adding a user to an approver group establishes who can review requests. The person submitting the request needs sn_vulc.remediation_owner. The administrator adding exception approvers needs sn_vulc.admin. A deferral approver needs sn_sec_exception.approver. Approval-level groups accept members holding sn_vulc.exception_approver, sn_vulc.read or sn_vulc.read_auto_exception_rule, so confirm on your instance which role the approval step checks before assigning access. Assign these responsibilities deliberately so that a missing approval destination is not mistaken for missing requester access.
Start with the remediation task and the reason it cannot proceed. A request should explain the obstacle, the requested end date, and what will happen before that date. For the surrounding task process, see Configuration Compliance remediation. An exception needs a defined return to remediation, even when the immediate decision is to accept exposure temporarily.
Identify the approval engine before changing groups
Check the application version and approval configuration on your instance. Starting with Configuration Compliance v13.0, new deployments use Flow Designer by default, while existing deployments can retain workflow. The property sn_vulc.flow_designer_activation identifies this choice: true enables Flow Designer. Moving from workflow to Flow Designer cannot be reversed, and requests already raised through workflow continue through workflow.
The older workflow supports two approval levels. Its first-level group must contain users for an exception to be requested. Under the older workflow, the first-level group must contain users. The outcome for an empty second level is described in two different ways, so configure users in both levels rather than relying on either outcome. Flow Designer approval-level configuration requires at least one user in each level from v13.0 onward; an empty second level can lead to automatic rejection. Do not apply the older empty-group shortcut to a configured flow.
For workflow approval routing from v14.7.5, inspect sn_vulc.exception_approver_L1_CC and sn_vulc.exception_approver_L2_CC under All > System Properties. Their values identify the groups receiving requests. Compare those values with the groups you intend to maintain before changing membership.
Add members to the exception approver groups
Use sn_vulc.admin for this configuration action. For the default workflow groups, follow this sequence:
- Navigate to All > System Security > Users and Groups > Groups.
- Search the Name column for Exception, then open Exception Approver – Level 1 CC.
- In Group Members, choose Edit to maintain membership. Move the intended users from Collection to Group Members, then select Save.
- If creating a user through Group Members > New, complete the user form and select Submit.
- When the intended workflow includes a second review group, repeat the membership work for Exception Approver – Level 2 CC.
Choose reviewers who can judge both the affected configuration and the business reason for the delay. Before routing requests to a group, sign in as one of its members and confirm the request appears under All > Configuration Compliance > My Approvals. A group with no members, or with members who never see the request, holds up every exception sent to it.
Review group membership whenever an approver changes role or leaves. Write down which group makes the first decision and which, if any, gives the second review, so that a stalled request can be traced to a membership change rather than to a missing configuration.
Configure exception management for Configuration Compliance
With sn_vulc.admin, open All > Configuration Compliance > Administration > Exception Management. The Manage exceptions using selection determines whether requests use Vulnerability Response or GRC: Policy and Compliance Management. The GRC option requires the GRC plugin and supports specifying the Policy and Control objective. Changing this configuration does not alter existing data.
Set Duration and Unit to define the permitted request period. These values constrain the requester’s Until date. Choose a duration that leaves time for the proposed remediation work and a review of any remaining obstacle. A longer permitted period should not replace an explanation of why the individual task needs deferral.
To collect supporting information, use Enable questionnaire to request exception and select the questionnaire in Questionnaire to request exception. The default is Exception Questionnaire. The questionnaire goes to the person raising the request and gives approvers more context. Select Save when the configuration is complete.
Keep the decision route aligned with the obligation being deferred. Where the decision belongs within a broader policy process, compare it with ServiceNow policy exceptions. Avoid treating a configuration finding and its associated policy decision as interchangeable records.
Set Flow Designer approval rules and levels
Configuring approval rules requires sn_vulc.admin. Navigate to All > Configuration Compliance > Administration > Approval Rules > Exception approval rules for Remediation Task. Select the group for the approval rule and review Name, Table, Application, Rule type, Active, and Description before selecting Update.
Approval expiry (days) controls the period in which the approver can act. Notify approver (days) determines when the approver is notified to take action. These approval settings serve a different purpose from the duration of the requested exception: one governs the decision window, while the other limits the deferral being requested.
For approval levels, open the rule’s Approval Configurations tab, select a configuration, then select a level in Approver Levels. Maintaining these levels also requires sn_vulc.admin. Review the following settings together:
- Required approval: choose One approver required or All users must approve.
- Active: check that the intended level is enabled.
- Order: lower values execute before higher values.
- Assign using: select User and user group, Approval table field, or Script.
- Groups and Users: identify the people who will receive the approval work.
The Groups field lists sn_vulc.exception_approver, sn_vulc.read, and sn_vulc.read_auto_exception_rule as supported roles for users across exception management and exception rules. Confirm which role the approval step checks on your instance, because deferral approvals may check sn_sec_exception.approver instead. Select Update to save the level.
For help planning this work, see ServiceNow implementation.
Request the exception and verify its decision
The requester needs sn_vulc.remediation_owner. Open All > Configuration Compliance > Remediation Tasks > All Tasks, select the task, and check its state. The request action applies to tasks in Open, Under Investigation, or Awaiting Implementation. Select Request Exception.
For the Vulnerability Response request form, complete Until, Reason, and Additional information. Until must fall within the configured duration. Reason choices include Risk Accepted, Awaiting Maintenance Window, Fix Unavailable, Mitigating Control in Place, and Other. Use Additional information to explain the specific constraint and the plan behind the selected reason.
For example, a request using Awaiting Maintenance Window should identify the maintenance dependency and the intended remediation activity. A request using Mitigating Control in Place should explain the control and why it supports the requested delay. These are recommendations for decision quality, rather than extra form requirements.
Select Request Approval. The task moves to In Review. Track the request on the State Change Approval tab of the remediation task. The approver, with sn_vulc.exception_approver, opens All > Configuration Compliance > My Approvals, selects the request, and approves or rejects it with comments.
Approval moves the task to Deferred. Rejection returns it to its earlier state, with rejection comments in Work notes. When the exception expires, the task returns to Open. Check each outcome against the request’s dates before counting the test as passed. For the wider ownership structure, see governance, risk, and compliance.
Before a wider rollout, exercise the intended route with a controlled remediation task. Check the selected group, the reviewers reached, and the final task state. If approval stops unexpectedly, inspect the rule’s Active setting, its selected configuration, and the membership of each required level. If the Until date is unsuitable, check it against Duration and Unit before changing approval routing. These checks separate a request-period problem from a decision-routing problem and keep troubleshooting focused on the setting that governs the failed step.
Questions about exception routing and follow-up
Why is Approval Rules missing after enabling Flow Designer?
The Enable module approval rules scheduled job runs within 24 hours after the activation property is set to true. Running that job manually makes the module available sooner. New deployments using Flow Designer have the module available by default.
Can a scanner reopen a task during an active exception?
From Configuration Compliance v14.7, sn_vulc.auto_defer_test_result_in_active_exception_window can return a scanner-reopened task from Open to Deferred during the exception window. This behavior is disabled by default. The deferred-until date also persists after reopening following expiration.
Can task-level approval tracking show individual test-result status?
When an action is taken on a remediation task, approval tracking does not provide the status of the individual test results within that task. Plan operational checks around the level at which the action was requested.
Are exception questionnaires and false-positive questionnaires separate?
Yes. Exception Management has separate enablement and questionnaire fields for false-positive requests. For the Vulnerability Response option, false-positive questionnaires are available starting with Vulnerability Response 22.0. Select the questionnaire that matches the decision being requested.