Resolve configuration compliance import issues by matching the symptom to the integration that supplies the missing data. For Qualys PC Results, check the import start time before rerunning. For failed runs, inspect process status, notes, and payloads. For cloud integrations, distinguish missing policies, missing findings, and queues that are still processing.
Match configuration compliance import issues to a corrective check
Start with one missing result and identify its scanner, assessment period, and expected asset. Configuration Compliance imports third-party results; it does not calculate the scanner’s test outcomes. A missing result therefore calls for an import investigation before a change to remediation rules. Keep the source finding identifier beside the affected integration run so that the investigation stays tied to a specific record.
Use these symptom and resolution pairs to choose the next check:
- Older Qualys test results are missing: inspect Start time in the Qualys PC Results integration. The selected date may exclude the assessment period you need.
- The first Qualys PC Results run returns no data: check whether Start time is empty. Set a supported date before another execution.
- A Qualys integration is failing: inspect the latest Vulnerability Integration Run and its process entries. Review status, notes, and imported XML for the failing stage.
- Qualys tests or supporting records are missing: check the relevant Policies, Controls, and Policies Detail imports before rerunning Results.
- Prisma tests exist but results are missing: distinguish Prisma Policies Integration from Prisma Alerts Integration. They populate different records.
- A Prisma run appears to time out: inspect Last Record Processed and queue progress before treating elapsed time as proof of a stalled import.
- Expected Wiz findings are absent: establish whether they belong to Test Results or Issues and check the installed integration version for host configuration support.
Treat this as a branching investigation. Changing several integrations together makes it harder to tell which correction restored the missing data. Record the initial symptom, change one relevant setting or execution sequence, and compare the next run with that baseline.
Correct the Qualys PC Results time window
Modifying the Qualys PC Results start date requires the sn_vul_qualys.admin role. This permission applies to that action; it does not establish the permissions needed for unrelated integrations.
- Navigate to All > Qualys Vulnerability Integration > Administration > Primary Integrations.
- Open Qualys PC Results and select Integration Details.
- Set Start time to a past value that includes the missing assessment, within the supported maximum of one month in the past.
- Choose Submit or Update to save the change.
- Use Execute Now if an immediate run is needed.
An empty date returns no data on the first run. Moving the date farther back without regard to the supported window is also a poor recovery strategy: a large request can encounter Qualys API rate limitations or execution timeouts. Choose the date from the missing assessment period rather than selecting an arbitrary historical boundary.
Before saving, note the previous value and the earliest result you expect to recover. After execution, compare an expected source result with its imported counterpart. A completed run alone does not demonstrate that your chosen time window covered the missing assessment.
After the run finishes, open Configuration Compliance imported data under Explore and locate the records from that execution. Compare them with the earliest result you expected to recover. If the run reports success but those records do not appear, inspect the process entries for that run before changing the window again.
Start time sets the window for Qualys PC Results and the Qualys PCRS Test Results Integration. The Qualys PC Comprehensive Results job selects records by last evaluation date instead, so do not expect a Start time change to affect it. Avoid changing a results date to solve a missing control or policy record. Those records have separate import paths.
Read the failing run before repeating it
For Qualys failures, navigate through Qualys Vulnerability Integration > Primary Integrations > Qualys PC Results and open the Vulnerability Integration Runs related tab. Select the latest run, then inspect the status and notes of its related process entries. Individual process entries hold the imported XML, giving you a way to examine unexpected data at the point where processing occurred.
Separate the run summary from the individual processes. The summary identifies the execution being investigated; process details help locate the payload and anomaly. Keep the run identifier, process identifier, and relevant notes together in the investigation record. That makes a later comparison possible without relying on memory or screenshots of unrelated executions.
Compare the affected payload with the specific test and asset you selected at the start. If the expected finding is absent from that payload, a downstream remediation adjustment cannot add it to the import. If the finding is present, focus the investigation on what happened during processing. Do not describe either situation as resolved until the expected result is visible. Keep the incident open until the affected assessment period and an asset sample have been checked, because one recovered finding can sit inside a wider gap.
Once data arrives, Configuration Compliance remediation explains the next stage. Keep that work separate from establishing whether the import supplied the assessment data.
Restore the right dependencies before importing results
Qualys imports split supporting records across scheduled jobs. Qualys PC Policies, Qualys PC Controls, and Qualys PC Policies Detail each run as a separate scheduled job. A results investigation should therefore include the prerequisite data, especially when an operator has been running jobs manually.
If you run the Qualys integrations manually, run Qualys PC Policies first and Qualys PC Controls after it, and run Qualys PC Policies Detail after Qualys PC Policies. Run Qualys PC Results after Qualys PC Policies and Qualys PC Policies Detail, and run Qualys PCRS Test Results Integration after Qualys PC Policies, Qualys PC Policies Detail and Qualys PCRS Policy Host Integration. Check the relevant records between stages rather than repeating the results import while its supporting records remain absent.
There is also a Qualys PCRS route for retrieving results. Qualys PCRS Policy Host Integration retrieves the host IDs for each policy. Qualys PCRS Test Results Integration then retrieves test results for each of those host IDs, and it depends on the Policy Host run. Both PCRS integrations are inactive by default, and activating either one deactivates Qualys PC Results, so confirm which route your instance uses before applying a recovery step.
Missing asset context deserves its own check. Use configuration item definitions to align the team’s understanding of the affected asset. Preserve the distinction between a missing assessment and uncertainty about which configuration item it concerns.
Check Prisma execution stages and queue progress
Verifying the Prisma Cloud integration run status requires admin. Navigate to Prisma Cloud Integration > Integrations, select Prisma Policies Integration, and choose Execute Now. This integration populates Configuration Tests, Authoritative Source, and Citations. Open its vulnerability integration run under Items to inspect counts for tests created, updated, and ignored.
Then select Prisma Alerts Integration and choose Execute Now. This stage populates Test Results and Discovered Items. Review the run under Items for result counts, and inspect the Configuration Items tab. Policies define the assessment scope for the selected cloud instance, so a successful policy import is different evidence from a successful alerts import.
Large payloads can continue processing beyond an hour. Starting with Configuration Compliance version 14.8.5, periodic heartbeats help distinguish active processing from a stuck queue. Last Record Processed on the Import Queue Entry reflects record creation or updates. When an entry exceeds the one-hour limit, the age of that field also participates in the timeout check.
The properties sn_sec_cmn.record_threshold_heartbeat and sn_sec_cmn.maximum_heartbeat_delay govern the processed-record threshold and heartbeat delay. Inspect queue activity before proposing property changes. Check version-dependent behavior on your instance and release, including Wiz host configuration support, which is absent before version 1.1.
For help planning this work, see ServiceNow implementation.
Verify Wiz results and close the investigation
Wiz Test Results Integration maps findings to cloud test results in Configuration Compliance. Wiz Issues Integration also maps findings to cloud test results, with Wiz Issues identified as the source. Check which stream owns the finding you are tracing; an issue combining several risks should not be assumed to arrive through the same path as an individual configuration finding.
Close the investigation with a record-level comparison: the expected finding, its integration source, the execution inspected, and the resulting imported record. Retain before-and-after settings and counts. Where policy owners need assurance about assessment coverage, connect this evidence to policy and compliance management rather than presenting an import completion message as proof of compliance.