OBLYTECH Logo
OBLYTECH Logo

Generate correlation insights in the Security Incident Response workspace

To generate correlation insights for a security incident, open its Investigation tab in Security Incident Response Workspace, choose affected users, configuration items, or associated observables, select matching items, and select Generate Insights. Review related records, the lookup period, and existing investigation work before deciding which follow-up actions still need an owner.

Prepare correlation insights for the security incident

Start with the incident you are investigating and a specific question: has somebody already examined this user, system, or observable? Correlation insights connect the current record with earlier activity through shared values. They give you a starting point for checking previous work, rather than a reason to assume that two records have the same cause.

The roles for generating insights in the workspace are sn_si.analyst, sn_si.manager, or sn_si.basic. Open a security incident assigned to you through All > Security Incident > Security Incident Response Workspace. Generation is available for incidents in any state. For the surrounding analyst workflow, see the Security Incident Response Workspace guide.

The correlation insights skill is turned on by default in Brazil and is automatically available to appropriate role users. The correlation insights generation skill must be activated before you can see the Generate correlation insights option in the workspace. Check availability and labels against your instance and release; the older Yokohama panel uses the Now Assist name.

Before running the lookup, review which users, CIs, and observables are attached to the incident. You can find these values on the Details tab in the workspace, or in the Configuration Items, Affected Users, and Observables related lists in the legacy UI (UI16). A missing relationship can leave the intended investigation subject outside the selection. Write down the question you want the results to answer so the review stays focused on unfinished work.

Select the evidence that connects investigations

The Investigation tab provides three ways to choose the subjects of your lookup. Select values that reflect the incident evidence, rather than adding unrelated items simply to produce a longer result set.

  • Associated Observables: use shared indicators such as an IP address or file hash to look for related security incidents. A repeated indicator can suggest infrastructure appearing in more than one investigation.
  • Configuration items (CI): use a shared system to examine related activity. A laptop appearing in earlier records may provide context for the incident being handled now.
  • Affected Users: use shared users to investigate repeated involvement, such as successive phishing reports or unauthorized access attempts affecting the same person.

Two incidents involving one laptop may concern different events. Read the connected records before carrying a previous conclusion into the current investigation. This is where correlation can reduce duplicated work: find the earlier analysis, establish whether it applies, and identify the question that remains unanswered.

Keep the selection understandable to another analyst. When several users or systems are involved, record why each belongs in the review. If one item represents a separate line of inquiry, assess its results separately so a strong match for one subject does not obscure weak evidence for another.

Generate and review the workspace results

  1. Open the assigned security incident and select Investigation.
  2. Select one or more filters for the relevant observables, CIs, or affected users.
  3. Review the matching items that appear, then select the items you want to investigate. You can include multiple observables.
  4. Select Generate Insights and wait for the dialog to display the results.
  5. Review each entry alongside the incident question, checking its time range and Last generated value.

Results are displayed in a modeless dialog. Use Expand to resize the dialog and drag it around the page. If you change the selected items after generating results, use Refresh insights to update the review. Keeping the dialog visible helps when comparing several investigation subjects.

For each relevant connection, ask what was investigated, what conclusion was recorded, and whether the current incident introduces new evidence. An earlier record shows that work was done, not that it is complete.

A good review outcome is a short set of decisions: reuse a supported finding, ask the earlier investigator for context, or start a new task because the existing work does not answer the present question. For the broader skill context, see correlation insights skills for Security Incident Response.

Control the time window and recognize stored insights

The default lookup period is 30 days. Observable insights are stored after generation and remain stored until regenerated with a different lookup period. An insight therefore needs a freshness check, especially when the investigation has continued since the earlier generation.

Use Change time range on an entry to reload matching insights for another period. That entry regenerates automatically when its range changes, and the range appears beside the insight. Review Last generated as well. The range explains which period was searched; the generation date helps establish when that result was produced.

Changing the system lookup property requires the Security Incident Manager role, sn_si.manager. Navigate to sys_properties.LIST, open Correlation lookback period [sn_sec_gen_ai.correlation_lookback_period], enter a number up to 360 in Value, and save. Return to the incident, refresh the page, and generate insights using the new period.

Choose a wider period when the investigation question calls for older activity. Record the reason for that choice when sharing the finding. Otherwise, two analysts may compare searches covering different periods and mistake the different results for conflicting evidence.

For help planning this work, see ServiceNow implementation.

Check access and missing matches before repeating work

Your correlation results are based on the tables you can access: Configuration item [cmdb_ci], Incident [incident], Change request [change_request], Problem [problem], Vulnerable item [sn_vul_vulnerable_item], and Associate observable [sn_ti_observable]. Consider this access boundary before interpreting a short result list as a complete history. To view vulnerable items (VIT) in the results, the Vulnerability Response application must be installed and you need the read access role sn_vul.read_all.

The ServiceNow Otto panel offers another route from an open incident: select its icon in the top header, then Generate correlation insights. The panel displays filters that have matches. Enter an exact observable value, such as a complete file hash. If no filters appear, add the relevant value to the incident, save, then use More options and Reset Conversation before trying again. In the legacy UI (UI16), locate the security incident on the Security Incidents [sn_si_incident] table and open it first.

Panel results are grouped by record type. Affected-user searches return SIR, INC, and CHG records; CI searches can include SIR, INC, CHG, PRB, and VIT records; observable searches return SIR records. SIR is the security incident record, INC the incident, CHG the change request, PRB the problem, and VIT the vulnerable item. Use those boundaries when deciding which missing connection to investigate. Broader process guidance is available in security operations incident response.

For a handoff, capture the subject searched, the period reviewed, the related record that matters, and the remaining question. For example, an earlier investigation might already explain a shared file hash while leaving the current user’s exposure unresolved. Assign the remaining question clearly so another analyst can continue from the evidence rather than restarting the same search.

Questions about sharing and continuing the investigation

Can I edit an insight before putting it in work notes?

Yes. Share to work notes lets you edit the content before publishing it to the security incident. Add the investigation context and distinguish a verified finding from a lead that still needs review. That helps the next analyst understand what action follows.

Can I copy an individual insight for review?

Use Copy on the correlation insight entry to place it on the clipboard. Before using it in another working context, check that the selected entry is the one you intend to share and that its wording preserves the relevant incident context.

How can I provide feedback on the generated content?

Each entry includes Rate the content with positive and negative feedback controls. Use the control that reflects your assessment of the entry. Record your decision in the incident work notes. Use the rating controls only to score the generated text, not to record the investigation outcome.

What happens if I open the panel without an incident record?

After you choose Generate correlation insights, the panel prompts for a security incident number. Supply the intended record before proceeding. This matters when switching between investigations because the selected incident determines which values provide the starting point for the lookup.

How do I start a new search in the panel?

Your search criteria and results remain displayed in the panel until you reset the conversation. To reset it, select the More options icon in the panel, then select Reset Conversation. Before handing over the investigation, preserve the findings that matter in the incident record.