OBLYTECH Logo
OBLYTECH Logo

Group threats with threat grouping

Threat grouping in ServiceNow brings related threat intelligence objects together around an analyst-defined context. In Threat Intelligence Security Center, an analyst creates the grouping, describes why its contents belong together, and reviews associated records. The grouping supports an investigation while the evidence and interpretation continue to develop.

Define the context before creating a threat grouping

A grouping makes a specific analytical claim: its referenced STIX objects share a context. That context might be an investigation into a security event or collaborative analysis of campaigns and indicators. Threat groupings apply to STIX 2.x and can reference domain objects, cyber-observable objects, and relationship objects.

Start by writing a sentence that explains the connection you are investigating. For example, an analyst might group indicators and campaigns being examined for a suspected connection to the same event. Treat that as an investigation hypothesis. Membership alone should not be presented as proof that a particular actor carried out an attack.

As a review practice, distinguish direct observations from interpretations. Describe which evidence establishes the shared context and which questions remain open. This gives a colleague a way to assess the grouping without reconstructing your reasoning from a name or a collection of indicators.

Choose a name that helps analysts recognize the investigation, then use the description to explain its purpose and characteristics. Avoid names that imply a settled conclusion while the analysis is still changing. For broader review habits, see threat intelligence best practices.

Create the grouping in Threat Intelligence Security Center

The role required for this creation procedure is sn_sec_tisc.analyst. Check the navigation and fields on your instance and release before following the steps below; the Security Center and IoC Repository procedures use different roles and controls.

  1. Navigate to Workspaces > Threat Intelligence Security Center.
  2. Click the Threat Intel Library icon in the workspace.
  3. Go to the Threat Grouping object and click New.
  4. Complete the form with the grouping name, description, source information, and other relevant details.
  5. Click Save, then click Continue to edit the record and work with relationships.

Creating a new object record also creates a source record and redirects you to the aggregated record. Account for that transition when checking your work. Verify the grouping name and source after saving so that a change of record view does not leave you reviewing the wrong information.

The Prevent System Updates check box appears after you create observable, indicator, or STIX object records. Check whether it is offered on a threat grouping in your instance before relying on it. Where it is available, selecting it stops system updates to that record. Make this an explicit review decision: identify why the record needs protection and who will reconsider that decision as the investigation develops.

Review the fields as evidence, provenance, and handling

Use Name and Description to make the grouping understandable. The description should explain the event or investigation context, its purpose, and distinguishing characteristics. Put additional analyst observations in Notes and supporting context in Additional Context, rather than relying on the name to carry the full explanation.

The form includes Confidence, TLP, Source, and Revoked. TLP records information sensitivity for sharing; the listed colors are White, Green, Amber, and Red. Revoked indicates that the object creator no longer considers the object valid. Review those fields separately: handling sensitivity and object validity answer different questions.

Preserve provenance when completing source-related information. Created Time In Source and Modified Time in Source describe source timestamps. Created By Ref identifies the identity object representing the creator. Use available source evidence for these entries instead of substituting the analyst’s recollection of when the grouping was reviewed.

Spec Version identifies the STIX specification version; STIX objects defined according to the 2.1 specification use 2.1. Lang identifies the language of the object’s text. These fields help describe the represented object, so review them alongside provenance rather than treating them as analyst commentary.

As a quality check, ask a second analyst to read the saved description without an explanation from its author. If the reader cannot state why the records belong together, improve the context before adding more material. Adding more records rarely clarifies an unclear premise, so improve the stated context first.

Check associations without overstating relationships

The grouping form provides related lists for associated records, including Campaigns, Indicators, Infrastructure, Intrusion Sets, Locations, Malware, Observables, Observed Data, Threat Actors, Threat Events, Tools, and Vulnerabilities. Review the lists that matter to the investigation instead of treating the presence of a list as a reason to populate it.

Related records can be linked and unlinked. Potential relationships can also be reviewed through Potential Relationships in the Threat Intel Library or through the object’s Related Records section. Use those review points to assess the proposed connection before confirming it.

For each candidate association, ask what the relationship adds to the stated context. An observable might be relevant because it was encountered during the event under investigation; an actor association needs its own reasoning. Do not let proximity in the same grouping substitute for that assessment.

After relationship work, revisit the grouping’s description. Check that the collection still supports the original question and that new evidence has not broadened the scope beyond recognition. Record uncertainty in the narrative so a later reviewer can distinguish a working lead from an established connection.

For related review failures, see common threat intelligence mistakes. For help planning this work, see ServiceNow implementation.

Use the IoC Repository procedure when working there

The IoC Repository creation procedure requires sn_ti.admin. Navigate to All > Threat Intelligence > IoC Repository > Threat Groupings, then click New. Complete the relevant fields and click Submit. Keep this procedure separate from the workspace sequence when preparing instructions for analysts.

Here, Context captures the common context of the referenced content. Description provides the grouping’s purpose and characteristics. Name identifies the grouping, Source identifies its threat source, and Source ID identifies the object within that source. The form also includes Created Time in Source and Modified Time in Source.

Review Grouped Objects, Grouped Indicators, and Grouped Observables after creation. Show Relationships opens the STIX Visualizer and appears when the object has an associated object. If that link is absent, check the associated records before interpreting its absence as a display problem.

When preparing repeatable work instructions, record which interface the team uses, which role applies to creation there, and how reviewers will check the saved context. That makes later discussions about threat intelligence automation opportunities more precise: the team first needs an agreed analytical decision to support.

Test the grouping against a concrete investigation question

Consider a hypothetical review of indicators found during a suspected security event. Before adding records, write down what would make an indicator relevant to that event.

Then read the saved grouping as a colleague would. Can the colleague identify the event being investigated, understand why the selected material belongs together, and find the unresolved question? If an object requires a long verbal explanation to justify its inclusion, put that reasoning into the record or reconsider the association. This review keeps the grouping focused on a question that another analyst can actually investigate.

Questions about grouping lifecycle and analyst handoff

Does developing a grouping into a report mean automatic conversion?

A grouping can mature through analysis into information conveyed by a STIX Report object. Treat that as an analytical progression. Plan a review of the conclusions and supporting evidence rather than assuming that saving a grouping automatically produces a finished report.

Can a grouping be added to a case?

Objects can be added to cases. When using a grouping in that handoff, explain the investigation question and the remaining uncertainties so the case reviewer understands what the grouped material contributes.

How should analysts use tags and taxonomies?

The workspace provides Select Tags, Add Tags, Select Taxonomy, and Add Taxonomy Values. As a team practice, agree on classification terms before adding them. Keep the investigation explanation in the record’s narrative fields.

What belongs in an analyst handoff note?

Include the question under investigation, the evidence still needing review, and the next decision. This is a recommended working practice: a handoff should let the receiving analyst continue the reasoning, rather than merely acknowledge that a collection of records exists.

How should a team handle an investigation that changes direction?

Reassess the grouping’s stated purpose against the new evidence. As an analytical practice, make the change of interpretation explicit and explain which earlier assumptions need reconsideration. That preserves the reasoning a colleague needs to evaluate the revised investigation.