Time Card Management records time against tasks in the Task table, including projects, project tasks, incidents, problems and change requests. Activating it installs the Time Card Management plugin (com.snc.time_card) and the related Performance Analytics content pack (com.snc.pa.time_card). Dashboard use requires a Performance Analytics license, so separate plugin installation from the decision to use analytics. Whether audit engagement work appears on time cards depends on how that work is set up in your instance, including any advanced planning integration. Test it on your instance before relying on it.

Set the boundary for audit management time card reporting

Start with the reporting question: do you need hours against individual pieces of audit work, a project carrying that work, or operational activities such as meetings? Write down the expected reporting level before configuring entry methods. Otherwise, people can record accurate hours against records that do not support the comparison the audit manager needs.

For project work, the Allow time card reporting on field on the project controls the reporting level. Recording at project level combines work across its tasks into one time card. Recording at project task level creates separate cards for the planned tasks. Choose the level that preserves the distinction your review needs.

Validate the proposed audit work records in your instance before expanding the process. Test whether users can select the intended record, record time against it, and route the resulting card for approval. Do not assume that project task generation covers an audit record simply because both represent work.

For an industry-specific audit planning context, see audit management for financial services. Use the audit scope to decide which effort distinctions matter, then test whether your selected time reporting structure preserves them.

Activate Time Card Management and check analytics access

The admin role is required to activate Time Card Management. Its plugin ID is com.snc.time_card. Installation also activates Performance Analytics – Content Pack – Project Portfolio Suite Dashboards, with plugin ID com.snc.pa.time_card. A Performance Analytics license is required to use those dashboards.

  1. Navigate to All > System Applications > All Available Applications > All.
  2. Find Time Card Management using the plugin name or ID.
  3. Select Install and wait for the completion message.
  4. Check the installed components and establish whether dashboard use is licensed before including it in the audit reporting acceptance criteria.

Time Card Management is also activated through the PPM Standard plugin, com.snc.financial_planning_pmo. Check the current installation before planning a separate activation. Where domain separation and delegated admin are enabled together, the administrative user must be in the global domain for installation.

Keep two acceptance decisions separate: whether time entry works and whether the intended analytics are available. The content pack being installed does not establish that an audit-specific dashboard, measure, or record mapping meets your requirements. Inspect the available reporting output using a small set of known time entries before relying on it.

For help planning this work, see ServiceNow implementation.

Create a traceable time entry and approval test

Creating a time card requires timecard_user. Start with one user, one selected week, and a work record whose identity the reviewer can recognize. Record the expected task, category, dates, and hours outside the test result so you can compare the saved card with the intended entry.

  1. Open the time sheet for the selected week.
  2. In its Time Cards related list, select New.
  3. Check Week starts on, Category, Task, and User.
  4. Where the work uses resource assignments, select the appropriate Resource assignment.
  5. Select Submit to create the card, then verify the period and associated work record.

New time cards begin in Pending. If the week’s time sheet does not exist, creating the card creates a time sheet for that week. Treat card creation and approval as separate checkpoints: finding a saved record does not show that the approver has reviewed its hours.

For portal entry, navigate to All > Time Sheets > Time Sheet Portal. A user with timecard_user can use Add to Time Sheet from a task card. In Logged Time Cards, edit the hours inline or use Open Form View and then Save. Use Add Note where the reviewer needs context for an entry.

When choosing sample work, include an activity with a clear boundary between preparation and review.

Choose automation according to the work record

Time sheet policy controls two different automatic behaviors. Auto create time card on task update creates cards when a task is updated. Auto fill time card with time worked entries supports creation and hour updates from recorded time worked. Both settings are false by default. Test them separately so you can identify which action created a card and which action supplied its hours.

The Time worked field does not appear by default on Project Task, Incident, Problem, and Change forms; it must be configured there. Do not interpret an absent field as evidence that the selected policy is working. Confirm the entry method before asking users to depend on automatic updates.

Scheduled generation is a separate path for project tasks. An admin can open All > System Definition > Scheduled Jobs and select Auto Generate Time Cards. The job is turned off by default. Configure the week and included or excluded groups according to the operating schedule.

The assigned policy must have Auto create time cards every week set to true for scheduled generation. Eligible project tasks must be in progress or planned for the chosen week. An existing card for the project task and week prevents a duplicate during generation. These conditions make project assignment and dates part of the test, rather than treating generation as a catch-all for audit work.

Review submissions before using the hours

Approving or rejecting a submitted time card requires timecard_approver or timecard_admin. The approver can view cards submitted or delegated to them for approval. The user’s assigned time sheet policy governs the process, so test with the intended approver instead of relying on an administrator’s view.

  1. Navigate to All > Time Sheets > Time Cards > Pending Approval.
  2. Select the submitted card and compare its work record and hours with the test expectation.
  3. Select Approve or Reject.
  4. Verify the resulting Approved or Rejected state and the effect on the associated time sheet.

Approval creates an expense line and a Time Card Daily record. When all cards in a time sheet are approved, that sheet moves to Approved. A rejected card moves the associated sheet to Rejected regardless of the other cards’ states. Include a rejection case before accepting the workflow.

Audit managers should agree on the reporting cutoff: entered hours, submitted hours, and approved hours represent different stages of review. Reconcile a known week’s entries with the intended output before presenting a total as reviewed effort.

Keep the test results with the rollout decision: selected work record, time sheet week, entry route, assigned policy, approving user, final state, and reporting result. This gives the team a concrete reference when a later entry appears in the wrong period or under the wrong work.

Questions about repeat weeks and alternate entry methods

Can a recurring week inherit hours as well as cards?

Yes. With timecard_user, open the destination time sheet and select Copy from previous time sheet. Choose the source in Select Time Sheet. Select Copy time logged if hours should also be carried forward, then select OK. Review copied hours against the work actually performed before submission.

Why can copying create a second meeting entry?

Copying handles project tasks and non-task categories differently. Existing project task cards prevent duplicates during copying, but a non-task category such as meetings can receive another card even when one already exists. Inspect those categories after copying so repeated administration does not inflate the week’s audit effort.

Can an auditor enter hours through Now Mobile?

The Mobile Time Sheets entry procedure requires timecard_user. In Now Mobile, open a sheet from Time Sheets, use the action icon to add work, tap the task, enter daily hours, and tap Save. Test the mobile route with the user who will use it.

Which role do Customer Service Management agents need for time sheets?

Customer Service Management agents need the sn_customerservice_agent role to review and submit their own time sheets. Navigate to All > Time Sheets > My Time Sheets > Current Time Sheet, check the Time Cards related list, and select Submit Time Sheet. The sheet moves from Pending to Submitted, and its time cards move to Submitted with it.