OBLYTECH Logo
OBLYTECH Logo

Add a business process to operational resilience reporting

To include a business process in business service operational resilience reporting, use an account with sn_oper_res.manager, open Operational Resilience Workspace, and navigate through List and Services to the Business processes list. Select New, complete the Create Business Process form, and select Save. Then check the process relationships and reporting setup.

Define the process before adding it

A process record gives the resilience team a specific piece of business activity to track. Before creating it, agree on its boundary and the business service it supports. For example, a payment service might depend on a payment exception review process. That example is a planning choice: your record should reflect the activity your organization actually manages.

Check for an existing process before entering another one. Similar names can conceal different boundaries, while different names can describe the same work. Compare the intended activity with the records already available to your team.

Keep the supporting service in view during this preparation. The process name, its association with a service, and the reporting data around it answer different questions. A clearly named process still needs the appropriate relationship before a reviewer can follow its contribution to a particular service. Use the business services setup guidance when the service structure needs attention first.

Create the business process with the manager role

The role required for the business process creation procedure is sn_oper_res.manager. Check that the account performing this action has that role before beginning. Keep this permission check specific to creating the process; managing service relationships has separate requirements described below.

  1. Open Operational Resilience Workspace.
  2. Navigate to List, then Services.
  3. Find the Business Process module in the list of modules.
  4. Select New in that list.
  5. Enter the process details on the Create Business Process form.
  6. Select Save.

After saving, inspect the resulting record and compare it with the activity you intended to add. Check that the saved details describe the correct process before associating it with a service. This catches a scope error while the record is still easy for the team to review.

Beginning with Operational Resilience Release 21.0.x, service, business service, offering, business process, and application service records use a vertical layout. Check the navigation on your instance and release when following these steps. Treat the process form as its own form rather than importing fields from a business service form.

Connect the process to the service it supports

Creating the process and associating it with a service are separate activities. For adding or removing services and processes in Operational Resilience Workspace, the required combinations are sn_oper_res.manager with itil, or sn_oper_res.admin with itil. A user with sn_oper_res.user cannot make those changes in the workspace.

Open the relevant service record and review its associated business processes. In the service’s Business Process related list, use Add to associate an existing process with the service. Select the process that actually supports the service. If the process already exists, associating that record keeps the relationship tied to the same activity instead of introducing another representation of it.

Use Remove when correcting an inappropriate association in the related list. Review the service and the selected process together before making that change.

On a business service record, Open dependency view displays the relationship hierarchy when relationships have been added. Compare that view with the associated process records. If the expected connection is absent, inspect the underlying relationship rather than treating the missing visual connection as proof that process creation failed.

For help planning this work, see ServiceNow implementation.

Check business service operational resilience reporting setup

A saved process is one part of the reporting model. Entity types, pillars, generated entities, and Main node configurations also affect how dependencies reach Operational Resilience. Review those components when the process exists but its relationship or reporting context is missing.

New customers use the Opres with CSDM header Main node configuration, which fetches business services, business processes, service offerings and application services. Existing customers typically use the Service (CMDB) Main node configuration. Establish which of these your instance uses before investigating a missing dependency. Comparing a process against the wrong service context can send the investigation toward the wrong configuration.

For the business service workflow, the required roles are sn_oper_res.manager with itil, or sn_oper_res.admin with itil. Check that the business service has an active entity and that its entity type is active. Entity creation uses the GRC Profile Generation scheduled job. Review the entity filter conditions against the service that should be included.

The Update CSDM and other dependencies scheduled job clears the staging tables and then updates the CSDM dependencies, bringing configured relationships into the entity hierarchy, and it runs weekly at midnight local time. Its results depend on the node relationship configurations. The Calculate red flags for CSDM and dependencies scheduled job then calculates the red flags, and it runs daily at 3:00 AM local time. These are distinct stages, so investigate missing hierarchy data separately from missing red flags.

Use the hierarchy to trace the business service to the relevant process and dependencies. Then inspect the reporting information associated with that structure. This sequence makes a stronger check than looking at a dashboard count in isolation. Broader reporting design can continue with ServiceNow Process Intelligence once the resilience relationships are understood.

When checking a business service, distinguish its own attributes from the process association. The service’s Owned by, Business criticality, and Operational status values, shown in the record header with the Record Type, describe that service. Inspect them to establish which service the team is reviewing, then examine the associated process separately. Do not assume those service values describe the process record.

On a business process record, the Services and dependencies tabs show Dependency, Pillar, Impacted objects, and Red flags count for each related item. Use those details to identify the relationship under review and select a specific reporting discrepancy to investigate. A process name alone gives less context than its association and affected objects.

Validate the saved record and reporting result

Review completion in three passes: the process record, its relationship to the intended service, and the reporting data around that service. Capture the outcome of each pass in your team’s handover notes. This gives the next reviewer a concrete starting point if a later report differs from expectations.

  • Record: Reopen the saved business process and inspect its details against the agreed activity.
  • Association: Inspect the business processes associated with the intended service and check the dependency hierarchy.
  • Entity setup: Check the business service entity, active settings, and relevant filter conditions.
  • Data processing: Review dependency collection before investigating red flag calculation.
  • Reporting: Inspect the relevant service information and follow a count to its underlying records where available.

The Business services overview brings together active business services, importance, impact tolerance, red flags, and resilience activities. Red flag categories depend on the applications integrated with Operational Resilience. A missing category therefore calls for a different investigation from a process that was saved against the wrong business activity.

Keep assessment work separate from this record check. Adding a process does not replace the team’s review of service importance, impact tolerance, or disruption scenarios. Use the impact tolerance and scenario analysis guidance when moving from the dependency model into those decisions.

Questions about process reporting edge cases

Can a process have reporting data without a parent service?

Yes. A business process or service offering can lack a business service or service as its parent entity. Scheduled processing can still fetch its dependencies and integrate red flags. Decide whether the missing parent matches the intended model before treating it as an error.

Does the manager role also allow business service creation?

Adding an existing business service to reporting needs only the sn_oper_res.manager role. Creating a new business service from the Business services list is documented with sn_oper_res.manager plus the itil user role, or sn_oper_res.admin plus itil. Check this combination if the work expands beyond the process record.

Why might Add to OpRes reporting disappear on a service?

After a service has been added to reporting, that action no longer appears on its form. Inspect its entity relationship and available entity navigation before attempting to add it again. The action’s disappearance can reflect completed reporting enrollment.

Why can Business services overview be absent from the workspace?

Administrators can show or hide the Business services overview and Services overview tabs according to organizational needs. Ask the administrator to check that workspace configuration when the expected overview is unavailable, rather than creating another process to resolve a navigation issue.