GRC mobile policy approval lets a compliance manager approve or reject pending policy requests submitted to them. Open Policies from the Policy and Compliance landing screen, review the record, and choose Approve or Reject. Approval comments are optional; rejection comments are required. Submit the decision with the Send icon or Submit.
Prepare for GRC mobile policy approval
The role required to process these policy approval requests is Compliance manager (sn_compliance.manager). Start with a signed-in mobile session for the intended ServiceNow instance. The GRC Mobile application supports Policy and Compliance work on Android and iOS devices, including pending policies and policy exceptions assigned to the manager.
On the landing screen, distinguish Pending Approvals from Team’s Unassigned Work and Team’s Overdue Work. These folders organize different responsibilities. A policy awaiting your decision belongs to the approval workflow; an unassigned issue or indicator task calls for an assignment action. Choose the record type before deciding what action to take.
Check the navigation and available actions on your instance and release before using this sequence as a team procedure; the labels described here follow Brazil. For a broader view of the surrounding work, see GRC mobile policy and compliance tasks.
Before starting a review session, decide what information you need to judge the policy. A short checklist can include the policy’s purpose, the control objectives it relates to, and any unresolved questions.
Find the pending policy and choose a review route
From the Policy and Compliance landing screen, tap Policies. The Policies screen displays a list of records. If the list is difficult to scan, use filtering to narrow the records to those matching your criteria. Mobile filters work through conditions, so check the conditions you have applied before treating a missing record as an approval-routing problem.
There are two ways to reach the decision. Swipe left on a record to expose the action menu directly from the list, or tap the record to open its details. Use the list route when you already have enough context to decide. Open the record when you need to inspect its fields or related control objectives first.
- Check that the selected record is the policy request you intend to process.
- Tap the record if further review is needed.
- Read the policy fields on the Details tab.
- Open the Related List tab to inspect Control Objectives where relevant.
- Return to the policy record before choosing the decision action.
Under Control Objectives, tap an item to open its record and review more detail. A filter can help when several records appear. Use this relationship review to confirm what the policy supports, rather than deciding from the policy name alone. If your review depends on evidence preparation, see policy evidence planning.
Approve or reject and submit the decision
With the Policies list displayed, swipe left on the intended record and select Approve or Reject. If you have opened the policy instead, use the menu icon at the top right of the record to reach the approval actions. Both routes lead to the decision and comment step.
For Approve, enter any explanation you want to retain in Comments. Approval comments are optional. Tap the Send icon or Submit to save and submit the changes. For Reject, enter an explanation in Comments before submitting: a rejection requires a comment. Then use the Send icon or Submit.
You can also add a work note before you process a request. Use it to record the reasoning behind a decision you have not yet submitted, or to leave context for the next reviewer. A single record usually takes about five to ten minutes once you have the policy and its control objectives in view, so plan a queue of reviews with that pace in mind.
Write the rejection so the next reviewer can understand the reason without reconstructing your mobile session. Identify the concern and the change or clarification needed. For example, a reviewer might ask for a clearer relationship between a policy requirement and its control objective.
Before submitting, compare the selected action with your intended outcome. A detailed comment does not replace selecting the right decision. After submission, review the available record information to verify that the intended change was saved. Avoid interpreting navigation away from the screen as sufficient evidence that the decision succeeded.
When designing a repeatable approval process, put the review criteria and comment expectations alongside the tap sequence. A team can agree to explain approvals even though the application makes those comments optional. Keep that local working agreement distinct from the application’s requirement for rejection comments.
The ServiceNow implementation page covers how a rollout of this kind is scoped.
Keep policy exception decisions in their own workflow
The Policy Exceptions applet handles pending policy exceptions and extension requests assigned to the reviewer. Processing those mobile requests also requires Compliance manager (sn_compliance.manager). A policy decision and permission to depart from a policy concern different records, so begin from the appropriate applet.
Policy Exceptions uses Additional comments for decision comments. Its approval action can include editing Valid to with the calendar icon. Its menu also provides Request more information and Edit. These controls belong to the exception workflow; use the policy sequence above when reviewing a policy itself.
This distinction matters when a request arrives with an ambiguous description such as “approve the policy change.” Check whether the record asks you to approve a policy, an exception, or an extension before acting. For an exception, inspect the Policy and Control Objective fields when you need to understand the relationship. The exception’s related records can provide context for the decision.
Exception and extension routing can be configured through the GRC Approval Configurator. It supports rule conditions, designated users or groups, and multiple approval levels. That configuration concerns exceptions and extensions. Do not treat it as a prerequisite for the Policies applet sequence described here.
Enabling that configurator requires sn_compliance.manager. The setting is under All > Policy and Compliance > Properties: select Yes for Enable GRC Approval Configurator instead of legacy and verification rules for policy exception property, then select Save. Treat a change to routing as separate administrative work with its own review, rather than something to alter while trying to clear a mobile approval.
Check the request before escalating an approval problem
When the expected policy is absent, work through the narrow checks first. Confirm that you are in Policies, review applied filters, and check whether the pending request was submitted to you. A screenshot of an empty list does not by itself explain whether the issue is selection, filtering, or request assignment.
If you can open the record but cannot finish a rejection, check that Comments contains the required explanation and that you used the Send icon or Submit. If the issue concerns an exception instead, check the corresponding Additional comments step. Keep the record type and action in your support notes so another person can reproduce the same path.
Separate approval problems from neighboring task work. Indicator Tasks, Issues, and Remediation Tasks are the GRC Mobile applets for assigning unassigned tasks and issues to a member of your assignment group. Their menus and assignment fields answer a different need from the decision on a pending policy. The broader policy and audit evidence workflow helps place these activities in context.
For an escalation, record the policy identifier, the applet you opened, the intended decision, and the point where the sequence stopped. Include the conditions needed to reproduce the behavior without assuming a cause. This gives the person investigating a concrete case and reduces the chance of troubleshooting exception routing for a policy approval problem.
Questions about mobile review sessions
How do I return after switching to another app?
Tap the Now Agent app to return to the last displayed screen after navigating away from GRC Mobile. Check which record is open before continuing a review that was interrupted.
Where can I see mobile notifications?
Tap More and then Notification to view notifications from the ServiceNow instance and GRC Mobile. Use the notification as a prompt to examine the relevant work before taking action.
How do I leave the current instance session?
Tap More, then Settings, followed by Logout. Include this navigation in shared-device working instructions so reviewers know how to finish their session.
Can I switch to another ServiceNow mobile application?
When another application’s icon is displayed at the bottom of the screen, tap it to open that application. The installed core applications and GRC Mobile setup determine the applications displayed after login.
How do I return to the compliance landing screen?
Tap the Policy and Compliance icon at the bottom of the screen. This returns you to the landing screen, where you can choose the next category of work.