To assign a safety action, open the incident or observation in Health and Safety Workspace, select New in the Health and Safety actions tab, and complete the action form. Set the responsible group, assignee, location, and due date, then select Save.
Assign safety action ownership from the right record
Start with the reported incident or observation that needs follow-up. Creating the action from that record keeps the work connected to the event that prompted it. Before entering the form, decide what needs to change, who can carry out that change, and what evidence would show that the work has addressed the problem.
For adding an action to an incident or observation, the required role is sn_ohs_im.manager, sn_ohs_im.agent, or sn_ohs_im.action_writer. Check the role for this operation rather than assuming that access to a workspace also grants permission to create its actions.
- Navigate to All > Health and Safety > Health and Safety Workspace.
- In the Lists tab, look under Incident Management.
- Choose Safety Incidents and then All, or Safety Observations and then All.
- Open the incident or observation that needs follow-up.
- In the Health and Safety actions tab, select New.
- Complete the action form and select Save.
Multiple actions can belong to one incident or observation. Separate work when it has different owners or distinct completion conditions. For example, replacing damaged equipment and reviewing how damage is reported may need separate assignments. A single broad instruction often hides which part is still open.
Complete the action form with an actionable handoff
The Health and Safety task field identifies the parent safety record. Check that it points to the intended incident or observation. An action attached to the wrong record is typically harder to review, because the reviewer has to reconstruct why the task exists.
Assignment group identifies the responsible user group; Assigned to identifies the responsible user. Make the distinction explicit during the handoff. A group can provide the operational context, while the named person needs to understand the expected work. Do not substitute a department name in the description for an actual assignment.
Use Location for the place where the action applies and Due date for the completion deadline. The Number field supplies a system-generated identifier. Retain that identifier in discussions about the work so that similarly named actions are not confused.
Short description should make the required outcome recognizable in a list. Description gives room to explain the condition, the affected area, and the intended correction. As a writing practice, describe an observable result rather than a vague instruction such as “investigate safety.” Specify what the assignee should examine and what decision or change should follow.
For example, an action about a blocked access route could name the affected area, ask for the obstruction to be removed, and request confirmation that the route is usable. Keep this explanation tied to the reported condition. Avoid adding unrelated improvements simply because the same person might eventually perform them.
Choose the action type for the intended outcome
Type distinguishes the purpose of the assignment. Corrective concerns removing causes behind an undesirable situation so that it does not recur. Preventive concerns stopping such a situation from arising. Task provides a general work assignment. Learning supports an assignment involving learning, such as training.
Choose the type by the outcome rather than by the team receiving it. A maintenance assignment may address an existing cause or prevent a future issue. The label should help the reviewer understand the purpose of the work, while the description explains the particular condition being addressed.
Learning is available when the Learning Core application, sn_lc, is installed. Selecting Learning exposes Learning material, which lists content created in Learning Core. Check the fields and available options on your instance and release before planning the handoff around them.
Training should have a clear relationship to the incident or observation. As a review practice, ask whether learning addresses the identified cause or whether equipment, access, or working conditions also need attention. A training action can be one part of a response without carrying unrelated corrective work in its description.
Verify the saved action and the assignee’s route
After Save, the new action appears in the parent record’s Health and Safety actions tab and in the workspace Actions list. Check the parent, assignee, location, and deadline against the handoff you intended. Saving the form is a recording step; this review checks whether the assignment makes sense to the person receiving it.
The assigned user receives the action in My Tasks in Employee Center and the Now Mobile app. From either location, that user can respond and update its status. The action form also includes State. Use the values available in the record rather than inventing a status sequence for your local operating procedure. You can also assign the action to yourself or to another safety team member to begin the work.
Agree on what a meaningful response should contain. As an operating practice, the assignee should distinguish completed work from a blocker, a request for clarification, or a need to change ownership. A status update without enough context can leave the safety team unable to judge whether the original condition has been addressed.
Keep the reporting loop open after assignment. A safety action closes a concern only when the assignee reports back with enough detail for the safety team to judge whether the original condition is resolved.
For help planning this work, see ServiceNow implementation.
Check related work without losing the incident context
Safety actions also support inspection findings, audits, and risks. These entry points matter when reviewing an incident response because related corrective work may already exist elsewhere. Before creating another assignment, check whether it represents a separate outcome or repeats work that someone is already carrying out.
For inspection actions, the required role is sn_hs_rm.safety_inspection_manager, sn_hs_rm.safety_inspection_writer, or sn_ohs_im.action_writer. For audit actions, it is sn_hs_rm.safety_audit_manager, sn_hs_rm.safety_audit_writer, or sn_ohs_im.action_writer. Inspection actions can be created through Inspection actions, audit actions through Audit actions, and finding-level actions through the finding’s Actions tab.
For safety risk actions, the required role is sn_hs_rm.risk_assessment_manager, sn_hs_rm.risk_assessment_writer, or sn_ohs_im.action_writer. Risk actions can be created from the Risk actions list. A risk assessment can also use Action schedules to generate and assign work through conditions.
An action schedule has its own assignment controls. Active makes the schedule available for generating assignments, Location identifies where the work applies, and Assign to uses conditions to select people with a Health and Safety profile. Days to complete action after creation sets the generated action’s due date. Use this route when the requirement calls for scheduled assignments, rather than treating a manually assigned incident action as a recurring schedule.
If a proposed extension involves platform automation, distinguish that design discussion from entering the safety record. Actions in Flow Designer explains the separate automation concept. An action created on a safety record should still have a readable purpose, owner, and completion expectation.
Before handing the action over, read the short description as if you had not seen the incident. Can the assignee identify the affected condition, understand the requested result, and judge whether the deadline is achievable? Resolve those questions with the safety team before relying on the record as a work instruction.
Sharing actions and creating them from surveys
Sharing an incident action with another team
Copy action supports sharing an action independently of the incident with other groups or agents. Before sharing, review the wording for details specific to the original location. Another team needs to understand which condition applies to its own work rather than receive an unexplained reference to the original event.
Using the Action planner instead of the Actions tab
The Action planner in the contextual sidebar is the other entry point, documented alongside the Actions tab. Use the same purpose and owner check on the action it creates.
Creating inspection survey actions offline
The Mobile Agent inspection survey workflow supports offline creation for sn_hs_rm.safety_inspection_agent. Offline behavior must be configured and offline mode enabled. Scheduled caching uses glide.sg.offline.scheduled_download.enabled; if it is not set, use Settings and Update Cache before going offline. Completed offline surveys synchronize after connectivity returns.
Identifying the question behind an Employee Center survey action
That workflow requires sn_hs_rm.safety_inspection_writer and an assigned safety agent. Actions must first be added to the inspection’s findings related item. After answering survey questions, the agent uses Create action in the Action widget. Section and Question identify the answered survey item, and Create adds the action beside the survey before Submit.