To disable Dynamic Translation for LLM Virtual Agent conversations, an admin sets sn_generative_ai.disable_dynamic_translation to true in System Properties and selects Save. Dynamic Translation for Virtual Agent must be installed and active. Record the current value first, then test multilingual conversations to establish the actual language behavior before accepting the change.
Understand the translation change before editing the property
Dynamic Translation is enabled by default for this scenario. Its purpose is to translate a requester’s chat messages into English before they reach the large language model in generative AI topics. Responses can then be translated into the requester’s preferred language. That creates two language boundaries to consider: the message going toward the model and the answer returning to the person.
The setting for this task is sn_generative_ai.disable_dynamic_translation. Keep the full name in the change record because the word disable affects how the value should be interpreted. The procedure for disabling the feature uses true. Do not substitute a similarly named translation property or treat a general language preference as the same configuration.
Check the behavior on your instance and release. A saved property is evidence that configuration changed; it does not by itself demonstrate which language reached the model or what a requester received. Plan to validate those outcomes separately. This distinction matters when a conversation looks successful on screen but the team has not established whether translation still occurred along the way.
If the broader conversation model is unfamiliar, start with the plain-language guide to ServiceNow Virtual Agent. For this change, keep the scope centered on generative AI conversations and the translation property.
Prepare an admin change with a measurable baseline
The role required to perform this procedure is admin. Dynamic Translation for Virtual Agent must already be installed and active for the Virtual Agent being configured. Confirm that prerequisite before editing anything. A missing prerequisite would make a comparison difficult to interpret because there would be no established translation behavior to compare.
Before the administrator changes the value, prepare a short record of what the team expects to observe. Treat the following as a validation plan, rather than assumptions about the product’s output:
- Identify the generative AI topic and the requester language used for the baseline.
- Record the existing property value exactly as it appears.
- Choose a representative non-English request with a clear intended meaning.
- Note the requester’s preferred language and whether that language is configured for detection.
- Record the visible answer and whether it resolves the intended request.
- Agree who will assess the language and meaning after the change.
Use the same request and conditions in the comparison. Changing the topic, account, and language together makes it harder to decide which difference caused the result. A controlled example gives the administrator a clearer basis for accepting the setting or investigating further.
Keep sensitive information out of test prompts where it is unnecessary. A made-up request with the same language structure can be sufficient for checking meaning. Record the test conditions alongside the outcome so another reviewer can understand what was actually exercised.
Disable Dynamic Translation for Virtual Agent LLM conversations
Carry out the property edit with the admin role. The following sequence uses the list search to locate the exact record and avoids relying on a broad translation search that could return unrelated settings.
- Navigate to All and enter sys_properties.list in the filter.
- Select the magnifying glass icon to expand the column search row.
- In the Name column, enter sn_generative_ai.disable_dynamic_translation and press Enter.
- Open the matching record and compare its name with the full property name above.
- Record the current value, then set the property value to true.
- Select Save to save the record.
After saving, reopen the matching record and check the stored value. Include that value in the change record rather than relying on a screenshot taken before Save. This gives the team a concrete configuration checkpoint before conversation testing begins.
If the exact record cannot be found, pause the edit. Check the spelling, the instance being accessed, and the prerequisite installation. Do not create a replacement property simply to make the procedure continue. A new record with an assumed name is not a substitute for finding the intended setting.
For help planning this work, see ServiceNow implementation.
Validate the conversation in both directions
Run the baseline request again after checking the saved value. Evaluate the request and response separately. First establish whether the original request retains the intended meaning in the conversation. Then assess the returned answer for language, clarity, and whether it addresses that request. A fluent answer alone is not enough to prove that the input was handled as intended.
Use a reviewer who can understand the test language. Ask that reviewer to compare the meaning of the two exchanges rather than checking for matching words. Different wording may still convey the same answer, while familiar terminology may conceal an incorrect interpretation.
Keep configuration evidence distinct from conversational evidence. The property record establishes the saved setting. The conversation establishes what the requester experienced. If the team needs to establish the language presented to the model, require evidence that directly supports that conclusion rather than inferring it from the final response.
Use Virtual Agent conversation transcript review to organize the conversation evidence. Record the test request, observed response, language assessment, and property value together. That makes an unexpected result easier to reproduce without relying on someone’s recollection of the chat.
Decide acceptance criteria before reviewing results. For example, a team might require that the request is understood correctly, the answer is understandable to the requester, and the language handling can be explained from the evidence collected. These are proposed checks for the change, not guaranteed effects of setting the property.
Separate translation limitations from configuration problems
Two limitations deserve explicit test cases. Catalog item names are not automatically translated, and language recognition is restricted to languages configured for detection. An untranslated catalog name therefore needs a different interpretation from an entire answer appearing in an unexpected language.
Include a request containing a catalog item name if catalog interactions matter to the intended rollout. Assess whether the requester can identify the item and understand the surrounding answer. Do not use the catalog name alone as the indicator that translation has been enabled or disabled.
Likewise, establish whether the test language is configured for detection before interpreting a language recognition failure. Without that check, the team could attribute a recognition limitation to the property change. Keep the recognition question separate from whether the model’s answer is helpful.
If results remain unclear, preserve the exact test conditions and use the guide to debugging Virtual Agent conversations for the next investigation. Avoid making several translation-related changes at once. A small, recorded change with a reproducible request gives the next reviewer a narrower problem to investigate.
Make the comparison record readable to someone who was not present during testing. Separate what was observed from what the team inferred, especially where the final chat does not expose the intermediate language handling. Record an unresolved outcome as unresolved. That prevents a later rollout decision from depending on a stronger claim than the test actually supports.
Questions about accepting the language change
How should a team choose its first test request?
Choose a request with an unambiguous intended outcome and vocabulary the reviewer understands. Avoid starting with a long message containing several unrelated needs. A short, representative request makes meaning easier to assess and gives the team a stable reference before it adds more demanding examples.
Should mixed-language messages be included in acceptance testing?
Include them when they reflect how the intended audience writes. Treat them as a separate test category and record which parts use which language. Do not extend a successful single-language result to mixed-language exchanges without testing those exchanges and reviewing the meaning of the answer.
What should a handover to another administrator contain?
Include the property name, recorded previous value, saved value, prerequisite check, tested topic, requester language, and acceptance decision. Attach the observations that support that decision. A handover should let the next administrator repeat the comparison without reconstructing the change from scattered chat messages.
When is a translation change ready for wider use?
Move forward when the responsible team has reviewed representative requests and accepted the observed language handling. Include unresolved cases in the decision rather than silently treating them as successes. If an outcome cannot be explained, keep it as an open investigation with a reproducible example and a named reviewer.