Domain separation in Process Mining groups project data and related records by domain, helping service providers control access across tenants. New project definitions use the current user’s domain, while related entities follow the project definition. Scheduled jobs accept projects from their own domain, so project placement and scheduling need to be planned together.
Plan domain separation for Process Mining around the project
Process Mining builds process flows from audit trails so teams can examine how work moves and where it becomes inefficient. In a service provider environment, that analysis also needs a clear tenant boundary. A process model that belongs to one customer should have an explicit domain before people build related definitions or arrange recurring processing.
The support level is Basic. Runtime separation covers the user interface, cache keys, reporting, rollups, and aggregations. The instance owner must configure the application for multiple tenants. Treat that setup as a prerequisite for a tenant analysis rollout, and check the behavior on your instance and release before using production customer records.
Start with a short inventory of the projects you intend to create. For each project, record the tenant, intended domain, creator, expected viewers, and planned scheduled job. This is a planning record, rather than an additional product setting. Its purpose is to expose disagreements about ownership before a project accumulates dependent records.
For example, two customers may use similar incident processes without sharing a mining project. Naming the customer and domain in the planning record helps reviewers distinguish similar projects. For the wider configuration work that precedes this decision, see domain separation setup and administration.
Check the creator’s domain before creating a project definition
A new project definition takes the current user’s domain. That makes the creation context a concrete part of project design. Before creating a definition for a tenant, establish which domain the user belongs to and compare it with the intended project owner. Do not rely on the project’s display name to establish its domain.
- Identify the tenant whose process the project will analyze.
- Record the intended domain and the user who will create the project definition.
- Verify the user’s domain before creation, then inspect the resulting project definition’s domain.
- Compare the saved result with the planning record before adding related definitions.
This sequence provides an early checkpoint. If the result differs from the intended domain, resolve the discrepancy before expanding the project. Adding more definitions while ownership remains uncertain makes the subsequent review larger and makes it harder to distinguish an initial placement problem from a later configuration problem.
The same creation rule applies when a project definition is launched from a Performance Analytics KPI: it is created in the current user’s domain. Include that entry route in your review if analysts start mining work from a KPI. The adjacent subject of Performance Analytics domain separation deserves its own configuration review alongside the mining project.
Review the records that follow the project’s domain
Domain placement extends beyond the project definition. Activity definitions, breakdown definitions, child table definitions, extract data logs, filter sets, notes, and CIM initiatives associated with the process model definition are created in that definition’s domain. A related entity added to a domain separated project takes the project definition’s domain.
This distinction matters when a person works on a project they did not create. The initial project definition follows the creator’s domain; a related entity follows the project definition’s domain. During review, compare each record against the rule that applies to its creation, rather than expecting the current person’s domain to explain both cases.
Use a representative project to check the relationship. Record the project domain, create the related entities needed for the analysis, and inspect their domain assignments. Keep the review focused on entities the project actually uses. A list of theoretical record types is less informative than evidence from the activity, breakdown, or filter set being prepared for that tenant.
A new CIM initiative added from a Process Mining workspace also takes the project definition’s domain. Include this handoff when improvement work moves from analysis into an initiative. Record the originating project beside the initiative in your review notes so another reviewer can trace why that domain was expected.
Match scheduled jobs to the project domain
A Process Mining scheduled job can include project definitions from the job’s domain only. Visibility and scheduling eligibility therefore require separate checks. A person may be able to view records across a domain hierarchy without being able to place those records together in a particular job.
Consider a tenant named ACME. For a scheduled job in the ACME domain, the eligible project definitions belong to ACME. When a project cannot be included, compare the project definition’s domain with the scheduled job’s domain first. A familiar project title or a viewer’s wider access does not establish that the two domains match.
- List the project definitions intended for recurring processing.
- Group the planned work by the recorded project domains.
- Compare each scheduled job’s domain with the projects intended for it.
- Record discrepancies and resolve the intended placement before treating the schedule as ready.
This review avoids designing a schedule around a mixed-domain project list that the job cannot accept. Keep the job inventory aligned with the project inventory as new tenant projects are introduced. When discussing the resulting analysis with users, distinguish this scheduling check from Process Mining dashboards and KPI configuration, which addresses another part of the analysis workflow.
Test visibility and sharing with named audiences
For a project definition in ACME, users in ACME, its parent domain, or the global domain can view the definition. The same example applies to viewing a Process Mining scheduled job in ACME. Use these relationships to construct a review that includes tenant users and the people responsible for oversight.
A project can be shared with users in its own domain or with global domain users. Plan the intended audience explicitly before sharing. Parent-domain visibility and the stated project-sharing audiences are different details; do not turn the visibility example into an assumption that the sharing choices are identical.
Write down the expected result for each test identity before checking access. Include the person’s domain relationship, the project or job being checked, and whether the person should see it. Where tenant isolation is a requirement, add a separate tenant identity to the review and assess the observed result against your instance’s access design.
For help organizing this configuration work, see ServiceNow implementation.
Handle domain corrections as a controlled review
Cascade domain changes are not supported. Do not plan a correction on the assumption that changing a project’s domain will automatically move its related records. Before making a domain correction, inventory the project definition, its related entities, its scheduled job relationships, and the audiences using the analysis.
Use that inventory to define the intended final arrangement and a validation checklist. Compare the actual domain of each affected record with that arrangement after the approved correction work. This page does not prescribe a record migration command: the safe procedure depends on the affected records and the configuration being maintained.
Retain the before-and-after inventory with the review outcome. It gives the next administrator a concrete explanation of what was checked and prevents a corrected project label from being mistaken for evidence that the complete record set has been reviewed. Close the change when ownership, scheduling, and access checks agree with the intended tenant boundary.
Questions to settle before a tenant rollout
What should a handover record contain?
Include the intended tenant, the project identifier, the recorded domain, the scheduled job identifier, and the people responsible for reviewing access. Add the date and outcome of the checks. This gives the receiving team enough context to repeat the review without reconstructing the original planning discussion.
How can teams review several similar projects efficiently?
Use a consistent review sheet and distinguish projects by identifiers as well as names. Assign one reviewer to verify ownership and another to assess the planned audience where your working arrangements allow it. Similar terminology across customers should not obscure which tenant a review concerns.
What evidence helps explain an unexpected result?
Capture the affected record identifiers, the observed domains, the test identity’s domain relationship, and the expected outcome. Record the entry route used to create the project. These details make an investigation more focused than a report that a project is missing or inaccessible.
When should the team repeat its acceptance review?
Repeat the relevant checks when the intended tenant ownership, project creation route, scheduling arrangement, or audience changes. Base the scope on what changed, while retaining the earlier results for comparison. This keeps acceptance tied to the operating arrangement the team actually intends to use.