OBLYTECH Logo
OBLYTECH Logo

Configure the CrowdStrike Falcon Intelligence integration

To configure the CrowdStrike Falcon Intelligence integration in Threat Intelligence Security Center, a user with the sn_sec_tisc.admin role enters the Client ID and Client Secret from CrowdStrike on the matching form. A lookup setup needs one scope, Read for Indicators (Falcon Intelligence). The premium feed needs five scopes and a decision on ingestion filters before you enable it.

Choose between the lookup integration and the premium feed

CrowdStrike Falcon Intelligence reaches Threat Intelligence Security Center through two configurations, and each one has its own form. The enrichment integration under Threat Lookup lets analysts run lookups on observables. The premium CrowdStrike feed ingests indicators, actors, reports, malware and vulnerabilities, along with their context, from the Falcon Intelligence feed into TISC.

If you are still working out how TISC organizes intelligence, start with the plain-language guide to ServiceNow threat intelligence. For the wider view of how feeds and lookups connect to other tools, see the threat intelligence integration patterns page.

Both paths require the sn_sec_tisc.admin role. The lookup also depends on the Threat Intelligence Security Center and VirusTotal Threat Lookup plugins, which must be installed and active. Download the VirusTotal integration from the ServiceNow Store and confirm you have a valid VirusTotal account before use.

Gather the CrowdStrike API client and scopes

Both configurations start in the CrowdStrike Falcon Intelligence portal. Under your Falcon Intelligence profile, obtain an API Client ID and API Client Secret. If you do not have them yet, generate them first. Set the API scopes on that client before you copy the values into TISC.

Scope for the lookup integration

In the portal’s API Scopes, enable the Read setting for Indicators (Falcon Intelligence). This is the only scope the lookup needs.

Scopes for the premium feed

The premium feed requires these five scopes, each labeled Falcon Intelligence:

  • Indicators
  • Actors
  • Reports
  • Malware Families
  • Vulnerabilities

Configure the Threat Lookup integration

Use this path when analysts need to look up observables against CrowdStrike data.

  1. Navigate to Workspaces > Threat Intelligence Security Center > Integrations > Enrichment Integrations > All Integrations > Threat Lookup.
  2. Select Configure New Enrichment.
  3. Complete the fields on the Configure New Enrichment form. Enter a Name, such as CrowdStrike Falcon Intelligence. Vendor Name fills in with the selected vendor’s details by default. Integration Type shows the type you chose, such as Threat Lookup. Add a Description.
  4. Under Integration Configuration, enter the Client ID and Client Secret from CrowdStrike.
  5. Select Save. TISC validates the integration details, and the status is set to inactive.
  6. Select Enable.

Once enabled, CrowdStrike Falcon Intelligence appears as a choice for lookups on observables in Threat Intelligence Security Center. The starting status is labeled inactive in some releases and disabled in others, so check the label on your own instance.

If you run more than one enrichment integration, a clear Name helps you tell them apart in the list. Use the Description to record which environment or team each configuration serves, so a later change to the Client Secret is easier to trace.

Set up the premium CrowdStrike feed

The feed uses the same credentials on a separate form, and its filters decide what gets ingested.

  1. Navigate to Workspaces > Threat Intelligence Security Center > Integrations.
  2. Select Custom.
  3. On the CrowdStrike Feed form page, select Edit. The feed is disabled by default, so you edit its configuration before turning it on.
  4. Select Details, then enter the Client ID and Client Secret.

Adding the Client ID and Client Secret makes the feed parse a specific response from CrowdStrike during configuration.

Choose record types

Select Additional Settings, then select Edit Settings. Choose the record types to ingest from Indicators, Reports, Actors, Malware and Vulnerabilities. If you leave all the record types unselected, the feed ingests all five. All configured filters apply together while the feed ingests indicators.

Set indicator filters

The indicator filters decide which CrowdStrike indicators reach TISC. Where a field is left blank, that dimension stays open.

  • Indicator types to ingest: select the CrowdStrike indicator types you want. If none are selected, all available types are retrieved.
  • Malicious confidence of indicators to ingest: select the levels you want. If the field is left blank, indicators are fetched regardless of malicious confidence.
  • Targeted industries of indicators to ingest: select the industries. If none are selected, indicators are fetched regardless of targeted industry.
  • Associated actors, reports and malware families: each group has a check box that fetches indicators only if they are associated with that type, and a comma-separated name field. A blank name field matches all actors, reports or malware families.

Map malicious confidence to TISC confidence

Enter a confidence value from 0 to 100 for each CrowdStrike level: High, Medium, Low and Unverified. A matching mapping saved in Additional Settings overrides the value in the Details section, including a value you typed in manually.

Set vulnerability filters

The vulnerability filters follow the same rule: a blank field means all vulnerabilities are fetched for that attribute. Severity, exploit status and CVSS v3 severity each take a selection. The minimum CVSS v3 base score is a threshold. The feed ingests only vulnerabilities scored above the value you enter. For example, a value of 9.5 ingests only vulnerabilities scored above 9.5.

CVE IDs take a comma-separated list. The published date range uses two fields, on or after and on or before. Fill in both to ingest CVEs published within a range. The actor, threat, product and vendor filters each pair a check box with a comma-separated name list. CrowdStrike threats correspond to malware in TISC.

Select Update on the Additional Settings dialog box to save your changes.

Enable the feed

Select Enable to turn on ingestion. Once the feed is enabled, its configuration fields become read-only and the Save button is hidden. To change the configuration, disable the feed first.

What the feed writes into TISC

Indicators updated after the configured ingestion time that match your filters become observables. The feed maps these CrowdStrike indicator types to TISC observables:

  • SHA256 Hash
  • MD5 Hash
  • SHA1 Hash
  • URL
  • Domain
  • IP Address
  • Mutex Name
  • File Name
  • Email Address
  • Username
  • IP Address Block

Threat actors map to Threat Actors in TISC. Reports map to threat reports, malware maps to malwares, and vulnerabilities map to Vulnerabilities. Reports, malware and vulnerabilities are mapped into TISC based on matching attributes.

If your team also pulls CrowdStrike detections into incident records, see the page on mapping CrowdStrike Falcon detection fields for that side of the work.

How ingested records relate

TISC relates records that come from the same CrowdStrike feed and the same ingestion, records from the same feed across different ingestions, and records from different CrowdStrike feeds. The filters you configured also apply when the feed ingests indicators associated with indicators, reports or actors it ingested earlier.

Checks to run before and after enabling

  • Lookup: after you enable the integration, run a lookup on an observable and confirm that CrowdStrike Falcon Intelligence is listed as a choice.
  • Feed record types: review the record type selection and the filter values before you enable the feed, since enabling locks the configuration.
  • Vulnerability scope: a broad vulnerability set can produce many more records than a narrowed one, so settle your severity and CVSS thresholds before you enable the feed.
  • Confidence mapping: confirm the 0 to 100 values you entered for each level match the scale you plan to use in TISC.

For help planning this work, see ServiceNow implementation.

Questions about the CrowdStrike setup and its filters

Does the feed bring in older CrowdStrike records?

The feed fetches records that were updated after the configured ingestion time. A record that last changed before that point falls outside what the feed fetches.

Can I copy an existing feed’s settings into a new feed?

Yes. Select Duplicate on the feed to create a new one that uses the same Additional Settings. That suits a second feed that needs the same record types and filters without re-entering each value.

Why is an expected vulnerability missing from TISC?

Start with the vulnerability filters. A vulnerability has to match all of the filters that have values, so a minimum CVSS v3 base score, a published date range or a CVE ID list can exclude a record you expected to see.

What happens to indicators that CrowdStrike deletes?

The Include deleted indicators for ingestion check box controls whether deleted indicators are pulled in at all. Deleted indicators become observables only if they were ingested earlier. Indicators removed from CrowdStrike receive a Deleted in CrowdStrike tag.