Bulk edit lets you set a preferred solution or preferred patch on several host vulnerable items (VITs) at once. In the Security Exposure Management Workspace, you select the items on the Host Vulnerable items list, open the Bulk Edit modal, choose the solution or patch, and select Edit. An asynchronous job then applies the change to the selected items.
Roles and record states needed for a bulk edit
A bulk edit changes many findings in one run, so confirm your access before you select anything. The role you need depends on the workspace or list you use. For host vulnerable items (VITs) in the Security Exposure Management Workspace, the listed roles are sn_vul.vulnerability_analyst, sn_vul.vulnerability_admin, or sn_vul.remediation_owner. In the Vulnerability Manager Workspace, the listed roles are sn_vul.vulnerability_analyst, sn_vul.vulnerability_admin, and any role with the sn_vul.bulk_edit granular role.
On the Vulnerable Items list under All > Vulnerability > Vulnerabilities > Vulnerable Items, the required role is sn_vul.vulnerability_admin or sn_vul.admin. The sn_vul.admin role is deprecated, so check which of the two your team holds before you plan the change.
Records you select must also sit in the right state. Both workspaces update only records in the Open, Under Investigation, or Awaiting Implementation state. Records in any other state are not updated by the bulk edit.
Running bulk edit from the Security Exposure Management Workspace
Use this path when your goal is a preferred solution or a preferred patch for a set of host VITs. The steps are short, but the selection step decides what changes.
- Go to Workspaces > Security Exposure Management Workspace.
- On the List page, open the Host Vulnerable items list and choose the Active or All list.
- Select the check box beside each item you want, which uses the Only Selected Items option in the Record Selection field. Or apply filters, which uses the All Vulnerable Items that match filter option.
- Select the Bulk Edit button.
- In the Bulk Edit modal, select a Preferred solution or a Preferred patch for the selected host vulnerable items.
- Select Edit.
The same modal can also assign or unassign the selected items to an assignment group during that run, so you can combine an ownership change with the solution or patch. Review the selection before you select Edit. A filter that catches more items than you meant is an easy mistake to make, and the job runs in the background once you submit it.
Record selection and state choices in the Bulk Edit modal
The Record Selection field decides which records the job touches. Pick one of these choices first, because it sets the scope for everything else in the form:
- Only Selected Items updates the records you checked on the list.
- All Vulnerable Items that match filter updates the records returned by the filters on the list.
- Remediation Task updates the records inside a remediation task you pick in the Remediation task field.
- Vulnerability Entry updates the records tied to one vulnerability entry that you pick in the Vulnerability Entry field.
The State field offers Do Not Update, Open, Under Investigation, and Awaiting Implementation, along with other values such as Deferred. A preferred solution or preferred patch can be added only when the State is Do Not Update, Open, Under Investigation, or Awaiting Implementation. Choosing Do Not Update leaves the state as it is, and it displays the Unassign check box.
The Vulnerability Entry option changes all VITs for the vulnerability you pick to the selected preferred solution. It affects only the VITs that exist when the job runs.
The Security Exposure Management form also has a Risk rating field. You can change only one of State or Risk rating in a single bulk edit action, and choosing a risk rating hides the State field. Plan a risk change as its own run rather than mixing it into a solution or patch update.
Limits on distinct vulnerabilities and lookup lists
The Preferred Solution and Preferred Patch lookups are built from what the selected items share. The solution list only offers solutions that apply across all selected VITs, and the patch list follows the same rule. A mixed selection gives you a short list, so narrow the selection before you go looking for a missing option.
Two thresholds apply:
- A selection can span up to 500 distinct vulnerabilities. Above that, a warning asks you to choose VITs with different criteria before you set the preferred solution or patch.
- Each lookup list shows up to 170 entries. When there are more, a warning appears.
The preferred patch list also needs Patch Orchestration installed. Without it, the preferred patch list does not display, so plan the patch step around that requirement.
If a filter pulls in more than 500 distinct vulnerabilities, either narrow the filter or scope the run with the Remediation Task or Vulnerability Entry choice. Then work through the set in batches. Smaller batches keep the distinct count under the threshold and make each run easier to check.
For help planning this work, see ServiceNow implementation.
What the job changes and where to confirm it
The bulk edit runs as an asynchronous job in the background. The job writes the preferred solution and patch onto each selected host vulnerable item. A job number with a link appears on the Vulnerable Items page, where you can follow its status.
To check a single record, open one of the items and go to the Remediation section of the Details tab. The preferred solution and patch both appear there, and the updated value also shows in the Vulnerable item list view. The Work notes field takes text that describes the change, so fill it in before you select Edit.
Checks to run before and after a bulk edit
Run these checks before you submit and again after the job finishes.
Before you submit:
- Look for duplicate records. A duplicated finding can appear twice in the selection, so review the guide on identifying duplicate vulnerable items first.
- Check the source data. After an integration run, confirm the detection data for the items you plan to change using the steps in verifying vulnerable item detection data after an integration run.
After the job finishes:
- Open one changed item and check the Remediation section of the Details tab.
- Check the Vulnerable item list view for the updated value on the rest of the set.
- Once the patch is applied, run a scan again to see whether the finding still appears. The steps for rescanning Tenable vulnerable items from the workspace cover this.
- Before you change any state, read the vulnerable item lifecycle guide so each state change matches the stage the item is in.
Running the change from the Vulnerability Manager Workspace
Use this version when your work sits in the Vulnerability Manager Workspace. It offers the same Record Selection choices as the other workspace, and the steps follow the same pattern.
- Go to Workspaces > Vulnerability Manager Workspace.
- On the List page, open the Host Vulnerable items list and choose the Active or All list.
- Select the items or apply filters. The Bulk Edit modal has its own Record Selection field, where you pick one of the four choices.
- Select the Bulk Edit button.
- Fill in the State, Preferred Solution, Preferred Patch, Unassign, Assignment group and Work notes fields.
- Select Edit.
Field names, workspace names and role requirements can differ between releases and instances, so check them on your own instance before you run a large change.
Questions about unassigning, skipped records and access
What does Unassign do to the selected items?
Checking Unassign removes the assignment group and remediation owner from the selected items. The job then creates a remediation task that is sent for approval, and the state of the affected VITs and the task moves to In Review. If the request is approved, the Assigned to and Assignment group fields are cleared on the items. If it is rejected, those fields stay as they were. While Unassign is checked, the Assignment group field is turned off. To move items to a group instead, leave Unassign clear and pick the group.
Remediation owners can unassign only the records assigned to them or their groups. Vulnerability managers and vulnerability analysts update every record that matches the conditions in the modal. The Unassign option appears only when the assignment rules plugin is active.
Why do some selected items stay the same after the job?
In the Vulnerability Manager Workspace, records with an invalid configuration item (CI) or a decommissioned CI are not updated. In the Security Exposure Management Workspace, records with no matched CI are excluded, and records with an invalid substate are not processed. Open one of the skipped items, check its CI, correct the link if it is wrong, and then run the selection again for those items.
Does a bulk edit change the solution for future vulnerable items?
No. The bulk edit modifies the current set of VITs only. Setting the preferred solution at the vulnerability entry level is a separate change, and that change applies to new VITs from then on. Make that change on purpose, because it reaches items created after you make it.
What should I do when the Bulk Edit button does not appear?
Check your roles against the lists in the first section for the workspace you are using. Persona and granular roles control what users and groups can see and do in Vulnerability Response, so a missing button often points to a role that has not been assigned. Ask an administrator to assign the role, then reload the list and try again.