OBLYTECH Logo
OBLYTECH Logo

Schedule patches for vulnerable items with patch orchestration

To schedule a patch in Vulnerability Response, open the Patch Update record or remediation task, click Schedule Patch, and fill in the deployment dialog. You can do this in the Vulnerability Response Workspaces or in the classic environment from version 16.1 onward. Clicking Deploy sends the request for review.

Where patch scheduling starts in Vulnerability Response

Patch scheduling runs from three record types. The Patch Update record describes one patch and lists the devices, vulnerable items, deployments and patch requests tied to it. A remediation task is the record that tracks work on the vulnerable items it covers. A discovered item is a third entry point, covered in the questions near the end of this page.

Read the related items on a Patch Update record before you schedule anything. Other patches may already be scheduled against the same assets, and the Patch Deployments and Patch requests lists show them. Checking those lists first is the quickest way to avoid adding a second deployment against the same assets without noticing.

The workspace list shows only Patch Update records with preferred patches assigned to you. A patch assigned to someone else will not appear there, so when you need a record outside your own queue, use the List view route in the steps below to reach it.

Scheduling a patch from the IT Remediation Workspace

Find the Patch Update record

  1. As a user with the sn_vul.remediation_owner role, go to All > Vulnerability Response > IT Remediation Workspace.
  2. On the Home page, click Preferred patch on VIs. The list shows Patch Update records for vulnerable items with preferred patches that are assigned to you.
  3. Open the record you need. If it does not appear in that list, click Patches > All in the List view and locate the Patch Update record there.

The Patch Update record opens on the Overview tab, which shows the record number, the article and bulletin IDs, the release date and category, the site name, the risk rating, the risk score, the description, the solution if one is provided, and the remediation status. The related items links open Associated Devices, Vulnerable items, Patch Deployments and Patch requests. Records you open from those lists stay open as tabs until you close them, and messages about missed targets appear in the lists.

Complete the Schedule Patch dialog

Click Schedule Patch when you are ready to submit a request. The dialog has two steps.

In Step 1, Select Target, choose a Collection. These are the collections imported from SCCM. You cannot move on until you pick one.

In Step 2, Schedule, fill in these fields:

  • Deployment Name: a name that makes the deployment easy to find when you track it later.
  • Deployment type: Required for a required update, or Available for a patch that is not required but can be deployed.
  • Deadline time: the last day the patch can be installed.
  • Available time: the point at which the patch first becomes available for deployment.
  • Deployment time based on: the time zone that your deployment window is based on.
  • Allow restart: deactivated by default. Select it to have the machines in the group restart automatically after the patch installs successfully.
  • Description: free text that also appears in the Description field of the Patch Update record.

Click Deploy to submit.

Scheduling a patch from a remediation task

Remediation tasks assigned to you or your group are the second starting point. The Schedule Patch action on a remediation task appears only when patches are mapped to the vulnerable items in that task. To see them, open the task, keep the Overview tab selected, and scroll right to the Preferred patch column.

When patches show there, click Schedule Patch from the RT record and complete the same two-step dialog described above. The field definitions in this section apply to both starting points.

If the item details look unexpected, how vulnerable items move through Vulnerability Response covers the lifecycle of a vulnerable item.

Scheduling in the classic environment

From version 16.1, the classic environment also supports scheduling. You reach the records through the classic navigation.

  • Patch Update records: All > Vulnerability Response > Patches > All, then locate the record.
  • Remediation tasks: Vulnerability Response > Remediation Tasks, then locate the record.
  • Remediation status: the Remediation Status tab on the task tracks progress. Patch data appears under Related Links at the bottom of the record.

Click Schedule Patch and complete the classic dialog. It has these fields: Deployment Name, Description, Deployment type, Collections, Deployment time based on, Available Time and Deadline. Unlike the workspace flow, Collections lets you select more than one collection for a single deployment. Click Deploy to submit.

Before you write steps for other users, open the dialog on your own instance and check the field names against this list.

Roles needed to schedule and to view patch data

Configuring and viewing patch data use different roles, so match the role to the task you are doing.

  • To configure and schedule patches, you need the sn_vul_patch_orch.configure_patch role.
  • To view patch information on records in a read-only way, you need the sn_vul_patch_orch.read_patch role.
  • The read role is inherited through the sn_vul.remediation_owner and sn_vuln.vulnerability_analyst roles, which the IT Remediation and Vulnerability Manager Workspaces require.
  • Navigating to the IT Remediation Workspace, as described above, requires the sn_vul.remediation_owner role.

Each patch orchestration integration sets its own roles, so confirm the role list for your integration before you assume a user can schedule.

If a user can open a Patch Update record but cannot complete scheduling, compare that user’s roles with the list above, starting with sn_vul_patch_orch.configure_patch. Read-only access alone does not cover the scheduling steps.

What happens after you click Deploy

The request goes to review. Open Exception requests > My requests from the List view to follow the status of your submitted requests.

What SCCM does with the request depends on how many patches and collections you select. Selecting more than one patch for a single deployment creates a Software Update Group in SCCM that bundles those patches. A separate deployment record is created for each collection you select, and each per-collection deployment includes the full Software Update Group. For example, two patches sent to three collections produce three deployment records, and each one carries the same two-patch group. For the full integration setup, see running patch orchestration with Microsoft SCCM.

Deployment names are easier to match later than they look while you type them. Put the patch article ID and the collection name in the Deployment Name field, so you can tie a request in My requests to the matching deployment record in SCCM without opening each one.

Checks to make before you schedule a patch

These checks take a few minutes and fit in before you open the dialog.

  1. Open Patch Deployments and Patch requests on the Patch Update record and note any deployment already scheduled for the collections you plan to use.
  2. Confirm the vulnerable items in the remediation task are the ones this patch addresses. If they are container vulnerable items, review how container vulnerable items are remediated before you schedule them.
  3. Set the Deadline time and the Available time with room between them, and read both against the time zone in Deployment time based on.
  4. Decide on Allow restart before you submit, because it stays off unless you select it.
  5. Choose Required or Available based on whether the patch is required for the collection you picked.

For help planning this work, see ServiceNow implementation.

Questions about scheduling patches in Vulnerability Response

Can I schedule a patch from a discovered item record?

Yes. Discovered Item (SDI) records are one of the places you can schedule patches from. In the classic environment, find them under All > Security Operations > Discovered items.

Where do I review solution data before I choose a patch?

In the classic environment, go to All > Vulnerability Response > Solutions. Solution and other vulnerability information also appears on records in both the classic environment and the Vulnerability Response Workspaces, so you can review it before you schedule.

Can a deployment go through change approval first?

Yes. From a remediation task record, route the deployment through a Change Request for approval instead of scheduling it directly. Use this route when the deployment needs a change record before it moves forward.

Do the same roles apply to HCL BigFix patches?

Not necessarily. Roles depend on the integration, so check the role list for BigFix before you grant access. The page on Vulnerability Response patch orchestration with SCCM and BigFix covers both integrations.

Can I leave a note or attach a file while I plan a deployment?

Yes. In the workspace, click the Activity icon at the far right of the screen, enter a work note, and click the icon again to close the panel. You can also upload a file.