Threat Intelligence Security Center extracts observables from indicators that use the STIX pattern type. Each qualifying comparison in the pattern becomes an individual observable record, linked back to the indicator it came from. Extraction runs when an indicator record is created, not when its pattern is later edited.
How the system turns a STIX pattern into observables
A STIX pattern can hold several tests, and each test compares a property to a value. The extractor reads each comparison and decides whether it qualifies. A qualifying comparison becomes its own observable record, so one indicator can produce several observables with different types and values. A pattern that holds no qualifying comparison produces none.
Extraction covers the observable types that Threat Intelligence defines, with two exceptions: Email Message and Network observables are not produced from patterns. Unrecognized STIX object types, such as vendor extensions, are stored as Other Observables, so they still appear in your results.
If the indicator and observable record types are new to your team, start with the indicators and observables page for Threat Intelligence before you review extraction results.
Which comparisons produce an observable
Extraction is selective, and this is the part that tends to surprise reviewers. Two conditions decide whether a comparison produces a record. The comparison has to resolve to a single literal value, and it has to use the equals, IN or ISSUBSET operator.
The following comparisons are skipped:
- Comparisons that use the inequality, greater-than or less-than operators.
- Comparisons that use LIKE, MATCHES, ISSUPERSET or EXISTS.
- Any comparison preceded by NOT.
A test written with LIKE or MATCHES leaves no observable behind. When a record is missing, read the pattern before you assume extraction failed, because the cause is often the operator rather than a fault in the system.
Writing patterns that extract cleanly
Pattern authors do better when they know in advance which tests will produce records. A comparison against one literal value is the simplest case to reason about. When the threat calls for a specific artifact, a single equality test keeps that intent visible in the pattern itself.
Think about negative tests before you add them. A NOT in front of a comparison removes that test from extraction, so an exclusion written that way will not appear as an observable. If the exclusion matters to the analyst, record it in the text that accompanies the indicator, where the reader will see it in plain words.
Range tests and pattern-matching tests need the same care. A pattern that depends on a skipped test to describe a threat can look sparse in the observable list even when the indicator is sound, so explain the threat in the indicator text rather than leaving the reader to infer it.
Keep each pattern to the tests the threat needs. Each extra comparison is another line an analyst may have to check against the skip rules, and a leaner pattern is quicker to review.
What each extracted observable inherits
An extracted observable takes its threat context from the indicator that produced it. The inherited fields are Confidence, Expiration Time, TLP, Threat Level and Threat Severity, along with the source and source execution run values.
The Additional Context field on each observable records the ID of the indicator it was extracted from. That ID is a way to trace an observable back to its parent when you are looking at the observable on its own.
Treat the inherited values as a starting point. When an indicator’s values change after extraction, check the observable rather than assuming the two still agree.
Relationships between observables and the indicator
The system creates a relationship between the indicator and each extracted observable. It does not create relationships between the observables themselves, so two observables that came from the same pattern are not connected through extraction. If your review process needs that connection, it has to come from another step.
Use the relationship as the starting point for a review. It shows which observables the indicator produced, so you do not need to search the wider instance for look-alike values.
Because editing the Pattern field on an existing aggregated indicator record does not extract observables, plan corrections as new indicator records, then review those results with the steps below.
When observables need to feed a wider risk process, compare your design with the integrated risk management integration patterns and the governance, risk and compliance integration patterns.
Reviewing observables after an indicator is created
Work through the indicator in the same order each time, so a missing or unexpected record has a clear explanation.
- Open the indicator and read the Pattern field.
- List each comparison and note its operator. Mark any that use a skipped operator or are preceded by NOT.
- Find the observables linked to the indicator through the relationships the system creates.
- Open each observable and read its Additional Context field, which should hold the ID of the source indicator.
- Compare the inherited values on each observable with the source indicator.
When an indicator has fewer observables than it has qualifying comparisons, check for an existing record before you flag a fault. Open the observables linked to the indicator, compare their values with the comparisons in the pattern, and log the reason for the difference so the next reviewer does not repeat the check.
Running a review routine across new indicators
Batch reviews can hide the reason behind a short result, so give the team one routine and use it for each indicator.
- Sort new indicators by type and set aside any that do not use the STIX pattern type.
- Run the operator check from the review steps above on each remaining indicator before you open its observables.
- Write down the indicator ID, the number of comparisons, the number of observables and the reason for any difference.
- Send any indicator with a gap that has no explanation back to whoever wrote its pattern.
- Close the review after each observable is compared with its source indicator.
Keep the log short. The aim is to explain differences, so a note that a pattern used LIKE is enough, and a clean match needs no note at all.
Deciding what to do with each observable
Once the observables exist, the question shifts from extraction to response. Start with the Threat Level and Threat Severity values the observable inherited. Then read the Confidence and Expiration Time values the observable carries over from its source indicator.
Keep the TLP value in view when you pass a result to someone else. An observable whose TLP value limits sharing should not travel further because it is easy to copy into a message. Check the value against your sharing rules first.
Observables from one indicator share its context. If the indicator proves to be a false positive, review each observable it produced, including the ones that look harmless when read alone.
Record the decision on the observable, and keep the indicator ID in the note so the next reviewer can trace the decision back to its source.
Handling long values and truncated strings
An extracted value longer than 256 characters is truncated to 256 characters. Check any value of that length against the source pattern before you use it in a search or a decision. A shortened string may not match the full value held by another tool.
Turning extraction off
Extraction is enabled by default. To turn it off, set the property sn_sec_tisc.extract_observables_from_indicator to false. Indicators created after that change will not produce observables from their patterns, so record the current value before you change it and tell the people who review indicators.
For help planning a change like this, see ServiceNow implementation.
Questions about extracted observables in Threat Intelligence
What should I do when a pattern produces no observables?
Check whether all comparisons use a skipped operator or are preceded by NOT. If the threat still needs observables, create a new indicator record with the corrected pattern.
Can two indicators end up linked to the same observable record?
Yes, when the value, type and source match. If an observable with the same value, type and source already exists, the system links that existing record rather than creating another one.
Does a NOT in one test change the other tests in a pattern?
The skip applies to the comparison that NOT precedes. Other comparisons in the same pattern are assessed on their own operators and on whether they resolve to a single literal value.
Should extraction stay on for all indicator sources?
Leave it on unless the team has a concrete reason to stop observable creation. Identify who relies on observable records before you decide, because the setting controls what new indicators produce.
How should a team handle Email Message or Network values in a pattern?
Extraction does not create observables for those two types, so the value stays in the pattern and the indicator text. Decide before the review starts who checks those values by hand, and write that decision into the review routine.
How long should review notes be kept?
Keep each entry for as long as the indicator and its observables remain in the instance, so a later reviewer can see why the counts differed. Your own retention rules may require a longer period.