OBLYTECH Logo
OBLYTECH Logo

Triage self-identified compliance issues

A self-identified compliance issue becomes a triage issue as soon as an employee submits it through the Service Portal. The assigned triage owner analyzes it and selects a result, such as a confirmed issue, a risk event, a tracked recommendation or a non-issue, then completes the triage.

Reporting a self-identified issue in the Service Portal

Reporting is the first stage of the life cycle. The triage team sorts an issue well when the submitter answers the form accurately.

Reporting requires the sn_compliance.user and sn_grc.business_user roles. The Issue Triage feature also depends on the GRC: Advanced Core application, which has to be downloaded from the ServiceNow Store the first time it is used.

Steps to submit the report

  1. In the instance URL, type sp after the instance name, then press Return to open the Service Portal.
  2. In the screen header, go to GRC > My Issues to see the issues already assigned to you.
  3. Click Report an Issue.
  4. Answer the questions presented on screen.
  5. Click Submit. The request creates an issue triage record, and that record starts the triage process.

The same form is also reachable from Request Something on the Service Portal home page, under the Governance, Risk, and Compliance category, through Report Issue.

Preparing reporters for a complete submission

The first submission sets the Issue type, and a complete one makes classification far easier. Before you roll the process out to employees, agree on a short set of facts that every reporter should have at hand:

  • The entity, control, policy, authority document, process, or risk the issue relates to.
  • The type of issue, chosen from the first question on the form.
  • For a policy problem, the affected policy and the reporter’s view of the root cause.
  • Any dates or supporting facts the reporter already has, so the triage owner does not need to ask first.

Back-and-forth in triage often traces back to missing context. Keep the question list in a short internal guide so reporters know what the form will ask before they open it. A vague report tends to trigger a Request Information step, which adds a round trip before analysis can start.

Follow-up questions the form adds

The form branches based on the answers. Answering the What type of issue is this? question with Incident or loss event opens questions about the incident or loss event. Answering with Non-compliance to a policy asks the reporter to name the affected policy and to state what they consider to be the root cause.

Menu options set by a property

The GRC menu does not look the same on every instance. An administrator controls which option appears through the sn_grc_advanced.enable_my_issues_hide_my_reported_issues property, found at Policy and Compliance > Issue Triage > Administration > Properties.

  • When the property is set to Yes, GRC > My Issues is available and My Reported Issues is hidden. Reporters create risk or compliance issues that must be triaged before they are released as actual issues.
  • When the property is set to No, GRC > My Reported Issues is available and My Issues is hidden. Reporters create actual risk or compliance issues directly from the Service Portal.

The steps in this article follow the Yes setting. If a reporter’s menu shows a different label, check the property value before you publish internal instructions.

Who does what in issue triage

Triage involves several personas. Each sits inside the wider governance, risk and compliance model and has a distinct job.

  • Business user or employee: reports the issue.
  • Compliance user or manager, risk user or manager, and triage user or manager: triages and reviews issues.
  • Issue manager: manages and reviews the reportable issue.
  • Issue owner: resolves the reportable issue assigned to them.

The triage user and triage manager roles, and the Issue manager role, were introduced in GRC: Policy and Compliance Management version 11.1.0. Working a triage in the Compliance Workspace requires the sn_compliance.manager, sn_compliance.user, sn_grc_advanced.issue_triage_manager and sn_grc_advanced.issue_triage_user roles.

The four stages of the triage life cycle

The life cycle moves a report from submission to a closed record, and the assigned team does its triage work in the Compliance Workspace. For background on the policy side of the platform, see the plain-language guide to policy and compliance management.

  • Create and assign triage issue. An employee identifies an issue related to an entity, control, policy, authority document, process, or risk, and submits it. Based on the type of issue and an assignment rule, the system assigns a triage team and a triage owner.
  • Analyze triage issue. The triage team decides whether the issue is an actual issue or risk event, or whether it should be tracked as a recommendation for a policy or for optimizing a process. The team can request more information from the submitter, and can send the issue to a compliance manager, risk manager, or triage manager with a triage result.
  • Review triage issue. This stage is optional. The compliance manager, risk manager, or triage manager decides whether to confirm the issue or risk event, track it as a recommendation, or close it as a non-issue.
  • Close triage issue. If the outcome is an actual issue or risk event, those records are created, or the triage issue is added to an existing issue. The triage closes automatically when the process completes, and a manager or the triage team can also close it manually.

Analyzing the triage issue as the triage owner

Start in the Compliance Workspace. Navigate to All > Policy and Compliance > Issue Triage > My Triage Issues, or to Risk > Issue Triage > My Triage Issues for risk triages. The list shows the triage issues created and assigned to you.

  1. Click the number of the triage issue you want to work on.
  2. Check the Classification and Triage group. Classification fills in automatically from the Issue type. The assignment rule named sn_grc_advanced_issue_triage fills in the Triage group, using the Source and the Classification.
  3. Select a Triage owner, then click Analyze when you are ready for triage to begin.

Assignment rules also handle triages in Risk Management. Triages whose Classification is Other start from an unknown classification, so set the Triage group manually to Risk or Compliance for those records.

Once analysis is underway, the owner can take several actions:

  • Click Request Information to ask the issue submitter for more detail.
  • Click Request Review to send the issue to the user named in the Reviewer field.
  • Open the Details related list to add enrichment to the issue.

Choosing a result for the triage

When analysis is complete, the triage owner selects a result from the Results related list. The options depend on the Issue type. For a Control design effectiveness failure, for example, the list offers the set that applies to that issue type. The possible results include the following.

  • Confirmed as a new issue
  • Confirmed as an existing issue
  • Confirmed as a risk event
  • Track as a recommendation
  • Close as a non-issue/No action required

Some results need more information than others. Selecting Confirmed as a new compliance issue, which needs more action than simple observation, opens additional analysis fields. Selecting Confirmed as an existing compliance issue opens an Existing issue field, and you must name the existing issue the triage refers to. If the outcome touches risk management rather than compliance, the ServiceNow risk pages give wider context.

Sending the triage for review

Review is optional. A triage owner who wants a second opinion clicks Request Review, which routes the issue to the user named in the Reviewer field. That user opens the issue from Policy and Compliance > Issue Triage > My Pending Reviews.

Completing the triage and tracking the issue

When analysis and any review are finished, the triage owner clicks Complete Triage. The triage moves to the Closed state, and a link to the issue appears at the top of the screen. From there, the issue is analyzed with the usual issue management procedures. Check that link before you tell the submitter the matter is resolved, because the triage record and the issue record are separate.

Checks before you close a triage

Run through these checks before you click Complete Triage:

  • The Issue type and Classification match what the submitter described.
  • Any Request Information reply is recorded before the result is selected.
  • The Details related list holds the enrichment the next person will need.
  • An Existing issue field names the correct record when the result is Confirmed as an existing compliance issue.
  • The Triage group and Triage owner match the team that should handle the result.

A triage that closes with a vague result tends to come back to the same owner, so these checks are worth the time. Teams that want a wider set of habits for these records can compare them with the governance, risk and compliance best practices. For help planning this work, see ServiceNow implementation.

Questions about scope, roles and the issue record

Which issues go through this triage process?

The initial release handles only self-identified issues. System-generated issues, such as those caused by indicator or attestation failures, are handled in a later release.

What changes when the triage owner changes the Issue type?

The owner may find that an issue is misclassified and change its Issue type. That change can also move the Triage group and the Triage owner. The assignment rule runs in the background, and the issue is removed from the current owner’s queue.

Who completes a triage that is out for review?

The reviewer can click Complete Triage while the issue is out for review. That completes the triage and creates an actual issue, so the reviewer’s click moves the record into normal issue management.

Where do I find the triage history on an issue?

The Issue form has an Issue Triages related list. Opening the triage record from that list shows the analyst the details of the triage that led to the issue.