OBLYTECH Logo
OBLYTECH Logo

Integrate with the UCF Common Controls Hub

Compliance administrators can bring authority documents, citations and control objectives from the Unified Compliance Framework into ServiceNow GRC by connecting the instance to the UCF Common Controls Hub. The work needs a UCF CCH account with API access, Compliance UCF activated, a Now Support case for the account link and a shared list. Imported UCF data is read-only.

How UCF terms map to GRC records

The hub and the GRC application use slightly different names for the same layers of content. Read the names below as you compare a shared list with what is already in the instance, so you do not chase a control that is stored under a different label.

  • Authority documents keep the same name in both products.
  • Citations keep the same name in both products.
  • A UCF control is recorded in GRC as a control objective.

Citations sit between the authority document and the control. Each authority document in the UCF content is mapped to its citations, and each citation is mapped to a common set of controls. When a control objective looks wrong in GRC, trace it back through its citation to the authority document before you blame the import.

Prerequisites before the first import

Treat the setup as a sequence of account and approval steps that come before anyone opens a shared list. The order below is the one the setup follows. Screens and labels can differ by release, so confirm each step on your own instance.

  1. Sign up for a UCF Common Controls Hub account and customize the basic subscription to include API Access.
  2. Activate Compliance UCF on the ServiceNow instance. It is sold as a separate subscription, so confirm it is licensed first.
  3. Raise a Now Support case for the UCF-CCH account integration information. The Now Support Service Portal is where that integration process starts.
  4. Configure the UCF integration from the UCF Common Controls Hub.
  5. Download a shared list from the hub and import it into the instance.

The OAuth route through the hub in step four is still supported but no longer the recommended method. The preferred route is a UCF-supplied API key, so confirm which route your account uses before you configure anything.

Check the subscription before you sign up. Free access to UCF content that came with a GRC license ended on November 30, 2018. The ServiceNow Store offers a subscription route, but customers must also buy from Unified Compliance directly. Confirm with your contract owner which route applies, and confirm that the subscription includes API Access, because the account setup depends on it.

For help planning this work, see ServiceNow implementation.

Connecting the instance and downloading a shared list

A list has to be marked as Shared in the UCF Common Controls Hub before compliance managers can download its authority documents. Check that status first if a list you expected is missing from the download.

Roles split by step. Configuring the integration needs the sn_comp_ucf.admin and oauth_admin roles, because only the UCF OAuth administrator can reach the system OAuth tables. Downloading a shared list needs sn_compliance.admin or sn_compliance.manager. Agree in advance which person pulls each list, so the same file does not get imported twice.

To import, go to All > Policy and Compliance > Administration > Unified Compliance Integration, open the UCF configuration and click Import Shared List. A progress bar tracks the download.

Once the configuration is in place, the import brings in the authority documents together with their mapped citations and controls. Keep a copy of each list file with the change record so later imports can be compared against it.

Importing a shared list without breaking existing records

For a single shared list, the main rule is that every authority document already imported into the instance must also appear in any shared list you import later. The hub copy may have changed since your last import, and this rule stops the two copies from conflicting.

If one of those documents is missing, the instance shows an error. Build the comparison from the instance’s current authority documents rather than from memory, count the documents on both sides before you start, and keep both counts with the change record.

The reimport routine:

  1. List the authority documents currently in the instance.
  2. Download the shared list from the hub and compare the two lists item by item.
  3. Resolve each gap before importing, either by including the missing document in the shared list or by agreeing with the compliance owner how the gap will be handled.
  4. Import the list and check the result against the count from step one.

Working past the 100 authority document limit

A shared list can hold no more than 100 authority documents. If you need more, split the content across several shared lists, for example SL1 with the first 100 documents and SL2 with the rest. Group similar documents together so that no document depends on a document in another list.

Multiple shared lists also need a system property change. The property sn_comp_ucf.deactivate_deprecated_docs is true by default and must be set to false before you import more than one shared list. Make that change deliberately and record who made it and when.

When the property is true, the import checks whether the authority documents being imported already exist in the instance. When it is false, they are not validated at all, so that checking becomes your job.

With the property set to false, deprecated authority documents, citations and control objectives are not deactivated. You validate them yourself. The instance sends an email with links to the mappings between citations and control objectives, and that email is the starting point for the review.

Validating deprecated content by hand

  1. Open the email that lists the citation and control objective mappings.
  2. Open each link in the email and fix the record it lists.
  3. Confirm that each mapping matches the hub’s current content, and raise any mismatch you cannot resolve with the compliance owner.
  4. Click Import Shared List again, then record the decisions in the change record.

Keeping imported UCF records intact

All data imported from UCF authority documents is read-only and needs protection. Leave the authority documents, citations and control objectives as delivered, including the fields that the import transforms into GRC tables.

Editing imported records is a common way the integration drifts, usually because a team wants its own wording. Change the content in the hub, mark a new shared list, and reimport it under the rule for existing documents. If a team needs its own commentary on a control, keep that note outside the imported records, and confirm with your administrator which fields are safe for local work.

Checks to run after each import

Run the same short set of checks after every import, whether it is a single list or one of several.

  • Compare the number of authority documents in the instance with the number in the list, and explain any difference.
  • Open a sample of imported authority documents and confirm that each one shows the citations and control objectives you expect.
  • When the property is false, finish the review of deprecated items and the mapping email before you call the import complete.
  • Record the list name, the import date and the value of the property in the change record.

Once the import settles, the common controls it brings in can be tested. See checking shared and inherited common controls for that work. For the citation side, which covers how imported citations connect to controls, see mapping UCF citations to controls.

Common setup mistakes to avoid

These mistakes show up as a failed import, a gap in the mapping or a record that no longer matches the hub.

  • Starting a download before the list is marked as Shared.
  • Importing a list that leaves out an authority document already in the instance.
  • Importing several lists while the deactivation property is still true.
  • Editing imported authority documents to match internal wording.
  • Skipping the review of deprecated items when the property is false.

For related problems outside this integration, see common ServiceNow GRC setup mistakes and policy and compliance management mistakes.

Questions about UCF Common Controls Hub imports

What happens to deprecated content at the default property setting?

At the default value of true, deprecated items are deactivated, which is what the property name describes. Setting it to false stops deactivation and sends an email for manual review instead. Check the state of any deprecated item on your instance after the first import that contains one.

How often should a team pull a new shared list?

UCF content is updated on pre-defined intervals. Confirm the schedule against your subscription terms, set your own review date in the change calendar, and pull a new list when a review finds that the hub content has changed. When you do pull, update all authority documents together so the framework stays in sync with the authority documents you use.

Does the integration replace an existing controls library?

Using the hub as the source is a choice, and it needs a subscription. If your organization wants that content to be the source for its controls library, decide that before the first import. Settle how the UCF records will sit alongside any library you already run, so the two sets of controls do not overlap by accident.

Why does a reimport fail with an error?

One cause to check first is a shared list that leaves out a document already in the instance. The instance then reports that the selected shared list does not match the existing authority document list. Compare the list with the instance’s authority documents, resolve any gap, and click Import Shared List again. If the error is a generic download failure, check the email from the instance for links to invalid records and fix those first.