OBLYTECH Logo
OBLYTECH Logo

Eliminate duplicate citations in the GRC library

Duplicate citations in the GRC library appear when UCF content is downloaded and the same authority document ends up with several citations. Two citations count as duplicates only when their Reference, Authority document and Description match. You keep one citation active, mark the others inactive, and move their control objectives across.

Why UCF downloads produce duplicate citations

A single UCF download can bring in several citations that point at the same authority document. Each citation may be linked to one control objective or to several, and each carries its own Source ID. Because the Source IDs differ, the library treats the records as separate, and the same reference can appear more than once in the list.

Duplicates matter for review work. Each copy can carry its own control objective links, so a reviewer who opens only one of them sees only part of the picture, and the authority document’s citation count is inflated. Clearing duplicates before assessments begin keeps each requirement in one place. If you are still deciding how UCF citations attach to control objectives, read UCF integration citation control mapping first, then return here for the cleanup steps. Teams that run reviews across several business units can also look at the enterprise GRC use cases.

Check the three fields before you change anything

The platform identifies a duplicate by comparing three fields together. Citations tied to one authority document are duplicates when their Reference and Description values match and their Source IDs differ. Close wording does not count. A Description that differs by a few words makes the pair two different citations, even when the reference is identical, so compare the text itself rather than relying on a quick visual check of the list.

Before you run any cleanup, write down a few facts for each group. That record lets you confirm the result later, and it gives you a baseline if a count looks wrong. A sensible set to capture is:

  • The Reference, Authority document and Description shared by the group.
  • The Source ID of each citation in the group, and the one you plan to retain.
  • The number of control objectives linked to each citation.
  • Any parent citation and the child citations that sit under it.

Common mistakes to avoid

  • Grouping by Reference alone. Matching references do not make duplicates unless the Authority document and Description also match.
  • Treating a near-match Description as the same text, which hides a pair that should stay separate.
  • Running the fix before the UCF content is in the library. The job works on citations already downloaded, so import the Shared list or confirm the content is present before you execute it.
  • Skipping the citations list check after the cleanup runs, so a missed group goes unnoticed until a review.

Pick the citation to keep and see what moves

Retain one citation in each group as the active record. The active citation takes on the control objectives of the duplicates, so it becomes the single place a reviewer looks for that requirement. Choose it with that in mind. A reasonable rule is to keep the record whose Source ID you want to appear in the library going forward, and to make that call once for the whole group rather than one citation at a time. The other citations in the group are marked inactive.

Settle the choice before anyone starts reviewing the group. A reviewer who finds an inactive copy in the Active column then knows which retained record holds the control objectives for that reference, and the Source ID you wrote down tells them where to look.

What the fix moves between records

The fix changes the links between records. For each duplicate, its relationship with the control objective is removed from the many-to-many table, and the record of the active citation is added to that control objective in its place. A control objective that was linked to a duplicate ends up linked to the retained citation instead.

Keep parent and child citations linked

A duplicate can sit in a parent–child hierarchy. When it does, its Source ID is updated with the Source ID of the active citation. Child citations of the duplicate are grouped with the child citations of the active parent, and they appear in the Citations related list of the active record. Where a child’s parent reference pointed at a retired citation, that reference is updated to the retained Source ID.

Take Source ID 0123 as the retained citation. If a child citation sat under a retired duplicate, its parent Source ID is updated to 0123, so the parent–child hierarchy holds after the cleanup. Confirm the Source IDs in your record before you rely on the grouping.

Run the deduplication fix

The fix is applied when you import UCF content from a UCF Shared list, and it is also available as an on-demand job for content that is already downloaded. Use the import route when you are bringing in a Shared list. Use the job when the content is already in the library and you do not want to import it again.

Run the on-demand job

  1. Navigate to All > System Definition > Scheduled jobs.
  2. Select UCF citation deduplication issue fix.
  3. Click Execute Now.

The job removes the duplicate citations and repairs the parent–child relationships by appending the child citations of each inactive parent to the active parent. Run it after the UCF content is in the library, then move to the checks in the next section before you make any other change.

If the job name or menu path on your instance does not match these labels, stop and compare them with what your release shows. The job you need is the one named UCF citation deduplication issue fix. Labels can differ by release, so confirm them on your own screen first.

For help planning this work, see ServiceNow implementation.

Confirm the cleanup in the Citations list

Check the result in the citations list, grouped by reference, so each group sits together. Use these steps.

  1. Navigate to All > Policy and Compliance > Citations.
  2. Select Group By, then right-click the list controls icon.
  3. Select Reference in the list.

After the fix, each reference appears once with a unique Description, and each citation belongs to a different authority document. In the Active column, the retained citation shows true and each duplicate shows false.

Open one of the retained citations to check its links. The Control objectives related list shows all the control objectives you recorded for that group, and the Citations related list shows the child citations gathered under it. If a count differs from the figure you wrote down, compare the group’s Source IDs against your record before you make any further change.

Leave the inactive rows visible while you check. They show which citations were retired, so you can compare them with the retained record and confirm that each control objective moved.

Keep a note of each retained Source ID. When a later UCF download brings in the same reference with a new Source ID, run the three-field test again. That tells you whether the new record is a duplicate of a retained citation or a separate entry. If a cleanup surfaces a finding that needs sign-off, the GRC issue workflows and approvals page covers that path. For the wider compliance features this library supports, see ServiceNow compliance solutions.

Questions about citation cleanup after a UCF import

Does the cleanup change the control objectives themselves?

No. The change is to the link between each control objective and a citation. The inactive citation is removed from that control objective’s many-to-many entry, and the active citation is added in its place, so the control objective now connects to the record you kept.

Why do two citations with the same Reference stay separate?

The three fields have to match together. If the Authority document differs, the citations belong to different authority documents, and the fix treats them as two different citations. The same applies when the Description differs, even slightly.

What if a group contains three or more citations?

The procedure is the same. You keep one citation as active and mark the rest inactive, so a group of three ends with one true and two false values in the Active column. Each duplicate’s control objectives move to the retained record, and each parent-child link is repaired in the same way.

What if my menu path does not match these steps?

Menu labels, job names and list layouts can differ between releases and between instances, so the steps here may not match your screen exactly. If the labels differ, do not guess at a substitute job. Ask whoever maintains your instance which job applies, and check the Citations list grouping against your own instance before you rely on the results.