OBLYTECH Logo
OBLYTECH Logo

Set up IT discovery for OT networks

IT Discovery for OT Networks finds IT-class devices, like switches, routers and computers, inside industrial control system networks. You run it through an OT discovery schedule aimed at Purdue levels 3.5 (the DMZ, or IDMZ) and 3. Before you schedule anything, decide where each OT Discovery component sits, because your network layout shapes the rest of the deployment.

Which Purdue levels this discovery covers

The Purdue levels describe how an industrial network is layered, from field devices at the bottom to enterprise systems at the top. IT Discovery for OT Networks works in the upper layers of the control network. It typically runs in the demilitarized zone at level 3.5, because that layer usually holds IT and OT class computers and servers that you need to inventory and manage. Level 3 covers site operations, where plant or site-wide control and monitoring functions reside.

Keep schedules out of levels 0 through 2. Scanning those levels can interrupt industrial operations, which is a poor trade for an inventory job. If a team asks for field-level devices, treat that as a separate engineering conversation with the people who own the control system.

Decide the deployment layout before you configure anything

Deployment scenarios for OT Discovery depend on how the network is built. Weigh segmentation level, communication pathways, network traffic, redundancy and environmental conditions before you choose a layout. Three layouts cover the usual designs, and each layout implies a different mix of Consoles and Sensors.

Flat network across one or more sites

In a flat network, the Discovery Console for OT, the Discovery Sensors for OT and the OT Discovery Collectors connect to one network and reach each other directly. Several sites can communicate with each other in this layout, and one Console typically covers multiple sites. A Sensor on a truly flat network can reach all the OT assets, so adding Sensors mainly improves discovery speed.

Segmented sites with no traffic between them

When segments do not communicate, give each one its own Discovery Console for OT, along with Discovery Sensors for OT and OT Discovery Collectors. The Console manages credentials and protocol handlers for its segment and starts queries locally. Each Sensor performs active discovery, collects network traffic and queries known protocols such as Modbus, DNP3 and BACnet, then reports findings to its segment’s Console. Consoles and Sensors in these zones have no direct outbound access to the internet, so plan the route for their data to reach a MID Server before you place them.

Micro-segmented sites with several networks each

A micro-segmented site contains more than one network, and each network is split into smaller segments. Each segment has its own Discovery Console for OT and Discovery Sensor for OT, and it can hold several network segments. Deploy a Sensor in each segment where it can perform active discovery, collect traffic and query protocols. Make sure the Sensors and Collectors in each segment have a path to that segment’s Console.

Work through the planning questions in order

Settle these questions with the site team before you order hardware or request firewall changes. The list is not exhaustive, so add questions that come from your own plant layout.

  1. Are the targets OT devices, or IT devices that sit in the OT network?
  2. Which site will host the deployment, and is its network flat or segmented?
  3. Are there NATed networks, network zones, or copy-paste networks, meaning sites that reuse identical IP ranges?
  4. Can the Sensors in each network zone reach the assets they need to query?
  5. Will one Console serve several sites, or does each site need its own?
  6. Does a MID Server exist in the DMZ, and can the Console reach it?
  7. Which other tools, such as intrusion detection or discovery tools, already run in the OT environment?

Place the first Sensor where it reaches many devices

Put the first Discovery Sensor for OT where it can reach many of the devices you want to query. Then place additional Sensors in areas with segmentation or other barriers, such as a NATed environment or an isolated silo that the first Sensor cannot see. This order gives you a working baseline quickly and shows you where the gaps are.

When Sensors in different zones can reach the same location, or an asset is dual-homed (connected to two networks), document the zoned Sensor configuration before the first full run. Without that record, one physical device is easy to enter twice, so write the mapping down in advance.

Roll out one site at a time

You can add locations over time. Start with a pilot site where you deploy the Discovery Console for OT and the Discovery Sensor for OT, then add sites once the pilot results look right. Capabilities can also build in layers: a central Console with access to several sites can come first, and Sensors can follow at individual sites for policy enforcement or for monitoring non-IP-enabled assets.

For help planning this work, see ServiceNow implementation.

Place the components and open the network paths

What each component does

  • Discovery Console for OT: the command-and-control interface for its segment. It manages credentials and protocol handlers and starts queries locally.
  • Discovery Sensor for OT: performs active discovery, collects network traffic and reports to the Console in its segment. Its data reaches the ServiceNow instance through the Service Graph Connector.
  • OT Discovery Collector: can run on an existing host in the network, and can be deployed to the same locations as a Sensor. It communicates with the Console and with the assets in its system.
  • MID Server: carries information from the Console to the ServiceNow instance. Deploy a separate MID Server for each network or network segment. If the Console can reach the internet directly, you may not need a MID Server.

Ports and firewall rules

Configure firewall rules wherever traffic crosses a network, segment or system boundary. These paths are required:

  • Console web interface on 8443, reached from a workstation.
  • Sensors to Console on 5671 (AMQP).
  • MID Server to the Console API on 8443.
  • MID Server to the ServiceNow instance on 443.
  • Setup computer to each Sensor on 443 and 22 during deployment.

Port 123 for clock synchronization is optional, because a time server or hypervisor can supply the time. SSH on port 22 to the Console is also optional and serves setup. Test each rule from the host it is meant for before you schedule a run, since a blocked path often shows up as missing assets rather than as an error.

Build the OT discovery schedule

Once the components can talk to each other, configure discovery in this order. Each step depends on the one before it, so expect to revisit an earlier step after a test run.

  1. Confirm that each Console, Sensor, Collector and MID Server is installed and can reach the endpoints in your port plan.
  2. Install, register and restart each Sensor or Collector using the steps in installing, registering and restarting an OT sensor or collector.
  3. Set up credentials for the OT devices you plan to query, following configuring OT discovery connections and credentials.
  4. Choose the Purdue levels for the schedule. For IT Discovery for OT Networks, select level 3.5, level 3, or both, and leave levels 0 through 2 out.
  5. Define the OT discovery schedule, including any attributes you want pushed to configuration items and their OT entity records. The location attribute is pushed along with them.
  6. Run a short test against a small set of addresses before you start the full schedule, and compare the results with your planning notes.

Check the results after a run

A run writes to the CMDB, so review the output before you rely on it. When the platform finishes discovery of a configuration item, it checks for an OT entity record linked to that item. If the record exists and a related attribute has changed, the record is updated. If no record exists, the platform creates one. The location attribute and the schedule-defined attributes go to the item and to its related OT entity records.

Check three things in the first review. Confirm that the location attribute matches the site you expected for each segment. Search for devices that appear twice, especially dual-homed assets and Sensors that share a zone. Confirm that the applications on discovered devices produced OT entity records, because the run creates those as well.

Menu labels, record behavior and processing steps can change between releases, so check them on your instance and release before you build a process around them.

Questions about scope, results and existing hosts

Does IT Discovery for OT Networks replace standard Discovery?

No. Standard Discovery works in the enterprise Purdue levels: level 4 for site business and logistics functions such as IT, and level 5 for the enterprise network where ERP functions take place. IT Discovery for OT Networks covers level 3.5 and level 3 inside the ICS network. The two serve different parts of the same plant, so plan them as separate scopes.

Where do I find the applications a run discovers?

Open the Industrial Workspace list view and go to the Applications list under Operational Technology (OT). The entries there include OT entity records for applications installed on discovered OT devices.

Can an existing HMI or engineering workstation do the discovery?

Yes, when the host can reach the assets you need. Install the OT Discovery Collector on a human-machine interface (HMI) or engineering workstation (EWS) instead of adding dedicated hardware. Then confirm the Collector can reach its Console. A host in one segment may not reach assets in another without an open firewall path.

What is the difference between a test run and a full run?

The platform offers an immediate Quick Discovery that you start on demand. The actual OT Discovery run follows the OT discovery schedule, with its own timing and Purdue level selection. Use the immediate option to confirm the path and credentials, then let the schedule handle the full inventory. For the wider discovery scope on standard networks, see what the ServiceNow discovery tool can find.