Apply the CSDM framework to operational technology

Applying the CSDM framework to operational technology means building the site and equipment model first, then attaching OT devices to it. Operational Technology manages and uses CSDM tables, so an OT device, the production process it runs, and the incidents and changes raised against it all point at the same records. If those records are built in the wrong order, reports start to disagree, and the fix is slow once the data is live.

What the CSDM framework is meant to do for OT

Following the CSDM framework is meant to deliver consistent accuracy in reporting and analytics, so that you manage the OT environment from one set of figures. In practice, a plant should appear in incident, change, vulnerability and request data as the same site, with the same devices and production line in each view.

If the reporting side is new to your team, start with the plain-language guide to ServiceNow operational metrics before you define any measures that depend on this model.

The implementation is completed in stages. Treat the first stage as a foundation of sites, equipment model records and a small initial set of devices.

Which OT products sit on the data model

Operational Technology Manager creates the foundational data and relationships that the solution depends on. Industrial Process Manager creates the ISA-95 Equipment Model data foundation. The operational applications work on that shared data: Vulnerability Response, Incident Management, Change Management, Knowledge Management and Request Management. Request Management gives OT workers the OT Service Catalog, where they submit requests that follow defined flows.

The Zurich, Australia and Brazil product views also include Discovery for OT, Recommended Actions for Operational Technology Service Management (OTSM), AI Enhanced Recommended Actions for OTSM, Employee Center for OT and Industrial Workspace. The Xanadu and Yokohama product views leave those out, so confirm the product list on your instance’s release before you plan around any of them.

Building the equipment model before the devices

Equipment model entities describe how an industrial operation is organized to produce an output. Their records are stored in the Equipment Model Entity table, cmdb_ci_ot_isa_entity. The ISA-95 model has four levels that start at the site, which is a physical facility or plant. Below the site come areas, work centers and work units.

Industrial Process Manager delivers a standard ISA-95 default template when you install it. A work center takes one of four types: process cell, production unit, production line or storage zone. A work unit takes one of three types: unit, work cell or storage unit. Start from the default unless your plant structure clearly needs something else, and write down any level or type you add so reports can be read against it later.

Sites and the parent-record rule

A site is the top-level parent in the model, and everything beneath it forms a chain that leads back to the site. Create each site before you assign devices to it, because the Site field on an OT entity record refers to that top-level site.

Site access is managed separately from the model structure. You assign users to each site so they see only that site’s equipment model information. Users with the cmdb_ot_isa_admin role can view entities for any site, while cmdb_ot_isa_editor and cmdb_ot_isa_viewer users reach only the sites an administrator has granted them.

Mapping OT devices to configuration records

An OT device is a configuration item with a companion OT entity record. That record holds the OT-specific details: OT Device Type, Device Criticality, Purdue Level, Zone and Site. A single OT device is therefore represented by at least two records, so count both before you size an import.

Existing IT hardware can be converted in bulk with the Bulk Update Ruleset for Reassigning IT to OT scheduled job. The job reads from a source table that covers the hardware class and its extended classes. Create a separate job for each CI class so each gets its own default values, preview the selected records before the job runs, and keep each data set under one million records. Running the job needs the admin or cmdb_ot_admin role.

Device types, criticality and Purdue levels

OT Device Type describes the function the device plays on the OT network, which can differ from its CI class. A server can have the device type HMI, for example. Use No OT Function where a device has no OT role, and Unknown where the type is not yet established. Device Criticality runs from 1, most critical, to 4, not critical. Purdue Level takes a value from 0 to 5 on the same record. Fill all of these in on the first pass for each device class, then go back to the exceptions.

Site assignment and what follows it

The Site field names one top-level site, so a device is assigned to one site. Set it when the record is created and review it when hardware moves. The site also drives vulnerability routing, as covered below. Use the View OT devices not assigned to a site list to find records that still need a value.

Relationships between devices and equipment

The relationship that matters most for OT reporting is Automated by::Automates, which links an OT device to the equipment model entity it automates. You can create that link from the Equipment Model Manager by adding OT devices to a selected entity, or from an individual OT device record by mapping that device to an entity. The Mapped OT Devices view on an entity also lists devices mapped to its child entities.

Automated mapping with AMAZING

The Automated Mapping Across Zone-based IP Network Groups feature, called AMAZING, maps OT devices to equipment model entities using their IP addresses. You store OT subnets from an authoritative source, such as NetDB or a firewall, as records. A device reported on import from an OT-certified integration or from Discovery for OT is matched against the subnets linked to each entity. Three mapping types are available: IP Network for a subset of addresses, IP Range for an entire subnet in CIDR notation, and Discovered Subnet. IP Network and IP Range are not supported on copy-paste networks, so use Discovered Subnet there.

Copy-paste networks reuse the same subnet across several entities, which makes the mapping ambiguous. A discovered subnet resolves that because each device carries a network partition identifier unique to it, and the Discovered Subnet and Managed Network fields must be populated on the device data for mapping to continue. Only one subnet range per site is supported, so a site that needs more than one subnet from the same range should use manual mapping.

Check the mapping on a sample before accepting it in bulk. The View unmapped OT devices list shows devices with IP addresses that no entity claims, which is where gaps appear first.

How OT applications use the shared records

Operational Technology Incident Management is built to help engineers resolve OT device and production process issues quickly. On the releases that include it, Recommended Actions for OTSM surfaces real-time recommendations across Industrial Workspace records, including OT incidents. Measures for OT incidents are easier to trust when the site data behind them is shared, so review the KPIs that matter with that in mind.

Operational Technology Vulnerability Response prioritizes and remediates OT device vulnerabilities at site level. Vulnerable items (VIT) are created on import, and the OT assignment rule routes each one to the group for its site. Its risk score can weigh OT Device Criticality, Purdue Level and Equipment Model Entity Criticality. Set the execution order of the OT assignment rule on purpose: ahead of all other rules if everything is assigned by site, or after the class-based rules if you assign by class first.

OT change requests change OT devices and production processes, so start them from the OT device details record. Knowledge Management for OT keeps what your team learns in knowledge articles linked to OT incidents.

Checks before you rely on the model

Run these checks on a test site before you load production data.

  1. Confirm each OT device has a Site value and that the View OT devices not assigned to a site list is empty for the test site.
  2. Confirm each converted device has both a configuration item and an OT entity record with a device type, criticality and Purdue Level.
  3. Check that Automated by relationships connect each device to the entity it actually runs, using the Mapped OT Devices view on that entity.
  4. Review AMAZING mapping results on a sample, and check the View unmapped OT devices list, before you accept them in bulk.
  5. Raise one incident and one change against a test device, then confirm both show the same site and equipment model entity.

Common errors in these setups are covered in mistakes to avoid with ServiceNow operational metrics. The operational metrics implementation roadmap can help you sequence the reporting work that follows the model. For help planning this work, see ServiceNow implementation.

Questions about sites, Purdue levels and Discovery for OT

Can one OT device belong to more than one site?

No. The Site field on the OT entity record holds one top-level site, so a device has one site value. If the device moves, change that value and confirm its mapped entity sits under the new site.

What does Purdue Level change in reporting?

Purdue Level is one of the factors you can weight in the OT Default Risk Rule when scoring OT vulnerable items, alongside OT Device Criticality and the criticality of the mapped entity. Agree the weights with the security team before the first scoring run, because they decide which items reach the top of the queue.

What does Discovery for OT contribute?

Discovery for OT discovers and maps OT devices and assets. The Zurich, Australia and Brazil product views list it as a product in its own right. Its reported IP addresses feed the same mapping work as OT-certified integrations, because AMAZING matches those addresses against the subnets linked to each entity.