To install the CISA integration in Vulnerability Response, an administrator requests the Vulnerability Response Integration with CISA application from the ServiceNow Store and then installs it from System Applications. The Vulnerability Response application and the Vulnerability Response Integration with NVD application must already be installed and activated. After the install, the integration needs no separate configuration step.
Prerequisites to check before you request the application
Two applications need to be in place before the CISA application is installed. The first is Vulnerability Response. To check its status, go to Subscription Management > Subscriptions in your instance. That list shows the subscriptions your organization has purchased. If Vulnerability Response is not installed and activated, install it before going further.
The second is the Vulnerability Response Integration with NVD application. Check it in the same Subscriptions list. If it is missing, install the NVD and CWE integration first, because the CISA install requires it to be installed and activated beforehand.
The CISA application is sold as a separate subscription, so confirm your organization holds it before you request it from the Store. The entitlement step applies to production instances. Non-production and development instances do not need entitlements, so on those you skip ahead to activating a ServiceNow Store application. A mismatch found at this stage is far cheaper to fix than one found after the install.
For help planning this work, see ServiceNow implementation.
Roles needed for each part of the install
Each part of the install needs a specific role. Confirm that the right people hold these roles before anyone starts the request, so the work does not stop partway through.
- admin is the role required for the install procedure. If it is not already assigned, the System Administrator [admin] installs the application and assigns users to the Vulnerability Manager role in Vulnerability Response.
- Vulnerability Manager is a Vulnerability Response role. Once users are assigned to it, the Vulnerability Manager oversees configuration and verifies expected results.
Request and install the application from the ServiceNow Store
The request happens in the ServiceNow Store, and the install happens on your instance. Work through the steps in this order.
- Log in to the instance where the CISA integration will run.
- Open the ServiceNow Store and search for the Vulnerability Response Integration with CISA application. Select its tile.
- Read the application details. Review the Other Requirements and Dependencies sections where they apply to your instance.
- Select Request App, enter your Now Support login credentials, and select Get.
- Enter the Instance Name and the Reason for the Instance, select Validate Instance, and then select Request.
- Wait for the email with detailed installation instructions, and keep it open alongside these steps.
- Go to System Applications > Applications, locate the application, select it, and then select Install.
Selecting Install starts the install, and the application installs on your instance automatically. The Store request and the instance install are separate actions. The email carries the detailed installation instructions for your instance, so read it before you select Install.
What to expect after the install finishes
The installation and configuration steps must be complete before the integration runs on your instance. Once the install is done, though, the CISA integration itself needs no configuration, so the remaining work is verification rather than setup.
The integration is set to run automatically as a daily scheduled job. You can also execute the individual scheduled job manually when you need a run outside the daily schedule. Scheduled jobs of this kind keep the instance synchronized with other vulnerability management systems. The integration record sits at Vulnerability Response > Administration > Integrations > CISA Known Exploit Vulnerability Integration. Among the integrations in the base system, the CISA integration is the one active by default.
When you plan how this feed sits beside your other Vulnerability Response feeds, the Vulnerability Response integration patterns page is the next place to look.
What the CISA integration writes to your records
The integration ingests the CISA Known Exploited Vulnerabilities (KEV) catalog. That catalog exists to drive urgent, prioritized remediation of vulnerabilities that are being actively exploited, and the integration brings that list into your instance. It retrieves CISA vulnerability data by CVE and enriches the vulnerability data already on the instance. The values it retrieves are the CVE ID, the due date, the date added, the vendor or project, and the product.
Due dates roll up to vulnerable items, and the roll-up considers the earliest due date. Keep that rule in mind when a vulnerable item shows a due date that does not match the CVE you expected to drive it.
From Vulnerability Response v21.0, the integration also ingests the Known To Be Used in Ransomware Campaigns value from the CISA Known Exploited Vulnerabilities catalog. It shows as the Known ransomware flag on the National Vulnerability Entry table. The flag is set at the CVE level and rolls up to the third-party entry.
The CISA Exploit section of the third-party entry form also displays SSVC (Stakeholder-Specific Vulnerability Categorization) values rolled up from CVE entries.
The third-party entries that hold this data appear in the Vulnerability Response vulnerability libraries.
Verify the install against expected results
The Vulnerability Manager verifies expected results, so run these checks with that role. Run the content checks after the scheduled job has completed at least once, either on its daily run or after a manual run. Typically the vulnerable item check is the last one to run, since it depends on CVE entries already carrying CISA values.
Confirm the application and the integration record
Confirm the application is listed under System Applications > Applications. Then open the CISA Known Exploit Vulnerability Integration record and confirm it is present and active. If the record is missing, check the Store request and the install from System Applications again, in that order. Note the instance name and the date of each check so you can compare results after later runs.
Check the CISA field on vulnerability entries
Look at vulnerability entries that CISA has retrieved. Those entries carry the CISA Exists check box, which the vulnerability entry table labels CISA KEV (BOD 22-01). The label changed in version 1.2.0 of the integration, so a form, list or report that still uses the older name CISA Exists should be updated to the current label.
The CISA Exploit tab appears only when the CISA application is installed, so if that tab is missing, check the application first.
Check the vulnerable item side
Because due dates roll up to vulnerable items, pick a vulnerable item linked to a CVE that CISA retrieved and check that its due date reflects the earliest due date among its CVE entries. For the vulnerable item side of this check, see how to verify vulnerable item detection data after an integration run.
Release differences and version history
The install guidance was last updated on August 1, 2024 for Xanadu, January 30, 2025 for Yokohama, March 12, 2026 for Australia and September 10, 2026 for Brazil. Check the release your instance runs and read the steps against it.
Recent Store releases include version 30.2.7 (October 2026), which batches EPSS score roll-ups to reduce NVD sync times in large environments, and version 30.2.5 (September 2026), which fixed EPSS roll-up failures on third-party entries that lacked a defined value. Version 30.2.1 (April 2026) added EPSS and KEV data sources for enrichment.
Earlier releases also changed where data lives: version 1.2.4 (August 2023) moved the due date and CISA Exists columns into NVD scope.
Questions about the CISA integration after install
What happens to risk scores when a CISA value changes?
When the value in the CISA KEV (BOD 22-01) field changes, the vulnerability entry is flagged for recalculating the risk score on its associated VITs. A score can therefore move after a run that changes that value, so compare scores before and after a run when you are checking the integration.
Which records does the CISA integration enrich?
The integration works on CVE vulnerabilities, so the CVE is the unit it enriches. The CVE ID is the first value it retrieves, and the enrichment moves from CVE entries to third-party entries and then to vulnerable items. When you review results, start from a CVE record and work upward.
Which Store details should I check before requesting the app?
Family compatibility and system requirements appear on the application’s listing in the ServiceNow Store, not in the install steps. Read the listing before you request the application, and compare it with the Vulnerability Response version on your instance.
Should I change the run-as user on the integration record?
No. Each integration record has a run-as user that defaults to VR.System, and that value should not be changed. Leave it in place when you review the record.