OBLYTECH Logo
OBLYTECH Logo

Configure stockrooms for hardware assets

To configure stockrooms for hardware assets, create the stockroom record, assign its physical location and responsible people, then define service coverage, sourcing relationships, and replenishment rules. Complete these settings before receiving hardware. Add aisle and space identifiers where technicians need precise storage positions, and enable automated sourcing only after reviewing its prerequisites.

Prepare the decisions behind the stockroom record

A stockroom represents a physical place holding hardware before deployment or after return. Decide which storage area the record represents before entering data. A room name that staff recognize is easier to work with than a project code that means little to the receiving team.

Gather the location, stockroom type, assignment group, and manager. Agree who will maintain these details when responsibilities change. The manager receives restocking notifications and requests associated with the stockroom’s stock rules, so an outdated assignment can leave replenishment work without an effective owner. The manager’s user record needs an email address, because the restocking email is sent there.

Prepare a separate list of the locations that the stockroom serves. Its physical location and its service coverage answer different questions: where hardware sits, and where that hardware can support requests. Also identify nearby stockrooms that should supply it. These decisions become service-location associations and distribution channels.

The steps below follow the Brazil release of ServiceNow; check the controls and installed applications on your instance. For the wider configuration sequence, see Hardware Asset Management setup and configuration.

Create and configure stockrooms for hardware assets

The role required to create a hardware stockroom is inventory_admin. Use either the Core UI or Hardware Asset Workspace entry point:

  1. In the Core UI, navigate to All > Inventory > Stock > Stockrooms and select New.
  2. Alternatively, navigate to All > Hardware Asset Workspace > Inventory, select All stockrooms, and select New.
  3. Complete Name, Assignment group, Location, Type, and Manager with the agreed details.
  4. Select Save, then check that the record appears in All stockrooms.

Use Type to classify the storage arrangement, such as Field Agent or On site. Create a custom stockroom type if the available types do not fit the organization. Avoid using type names as substitutes for physical locations: two rooms can share a type while serving different buildings.

Before proceeding, reopen the record and compare it with the preparation list. Check the selected location rather than relying on a similar display name. Confirm that the assignment group represents the group primarily using the stockroom and that the manager is the intended recipient for restocking work.

Associate the locations the stockroom will serve

Associating service locations requires inventory_admin. In Hardware Asset Workspace, open Inventory, select All stockrooms, and open the stockroom. On the Service locations tab, select Add. In Add service locations, choose the active locations the stockroom will support and select Add.

Check the resulting list against the agreed coverage. Adding a parent location also covers its child locations. Review the location hierarchy before choosing a broad parent; otherwise, a selection intended for one building may extend coverage beyond the area the stockroom team planned to support.

A location without its Active check box selected cannot be added, and the stockroom does not support that location or its children through that association. A stockroom excluded from providing location coverage cannot have service locations added. Investigate these conditions when a location cannot be selected.

Keep a short coverage decision alongside the setup record: which parent locations were intentional, which individual locations were selected, and who approved the operating boundary. This is a recommended handover aid, especially where a central stockroom supports several receiving points.

Build distribution channels with the correct direction

Creating hardware stockroom distribution channels requires inventory_admin. These channels define sourcing relationships between geographically related stockrooms. They also provide an order of preference, so the relationship needs more thought than simply connecting two records.

  1. From All > Hardware Asset Workspace > Inventory, open All stockrooms and select the stockroom being configured.
  2. Open Distribution Channel and select New.
  3. Review the automatically populated Base stockroom and choose the Channel stockroom.
  4. Set Rank to the intended numeric preference and review Active.
  5. Check the read-only Function, then select Save. Repeat for additional supply relationships.

The base stockroom is the perspective from which the relationship is created. Its Function is automatically Inbound: assets arrive from the channel stockroom. The corresponding relationship makes the base stockroom an Outbound channel for the other stockroom. Check both perspectives with the team before accepting the setup.

A stockroom excluded from distribution-channel sourcing cannot have these channels created. Once configured, compare the channel list with the physical transfer routes the team intends to operate. For the work that follows configuration, see HAM stockroom operations.

Plan replenishment before the first receipt

Stock rules belong in the initial configuration checklist. They set inventory thresholds for replenishment, and can notify an asset manager or automatically transfer inventory between stockrooms when stock is low. The stockroom configuration tasks use inventory_admin.

Agree the threshold for each asset in each stockroom, meaning the quantity below which restocking starts. Agree the order size as well, which is the minimum quantity for each transfer or vendor order. The system rounds the restocking quantity up to a multiple of that order size. Treat these as operating decisions: a threshold should reflect what the team intends to replenish, rather than a number entered just to finish configuration. Check that the manager and supplying stockrooms are consistent with that decision.

Record which asset and stockroom each planned rule concerns, the threshold decision, and the expected replenishment response. Review these together before technicians begin using the location. A valid stockroom record alone does not establish how shortages will be handled.

For help planning this work, see ServiceNow implementation.

Add aisle and space details for physical picking

Adding aisles and spaces in Hardware Asset Workspace requires inventory_user. Open Workspaces > Hardware Asset Workspace > Inventory, select All stockrooms, and open the stockroom. Select Aisle and spaces to view its storage positions.

Select Add aisle, enter a unique identifier in Aisle, and select OK. Create at least one aisle before adding a space. Then select Add space, choose the aisle, enter a unique Space identifier, and select OK. The space’s Display name combines its aisle and space values.

Choose identifiers that technicians can reconcile with the labels in the room. As a handover check, ask someone other than the person who entered the data to locate a sample position. Resolve naming ambiguity before hardware arrives. The next operational stage is covered in stockroom management and hardware receiving.

Review optional automated sourcing separately

Configuring automated hardware sourcing requires ham_admin. The Manage hardware asset requests agentic workflow also requires the ServiceNow Otto for Hardware Asset Management (HAM) application. Stockroom settings are a prerequisite, rather than the complete workflow setup.

In All > Hardware Asset Workspace > Inventory, open the stockroom from All stockrooms. Under Sourcing by AI agents, select the intended options and select Save.

  • Auto-consume lets the AI agent use local stock automatically. It applies when at least one stockroom serving the requester’s location has this option enabled. If several do, stock is taken first from the one holding the most available assets.
  • Auto-transfer lets the AI agent create a transfer order automatically. It applies only when one destination stockroom serving the requester’s location has this option, and both that stockroom and its source stockrooms (linked by distribution channels, taken in rank order) have it enabled.
  • Auto-purchase lets the AI agent create a purchase order automatically. It applies only when one stockroom serving the requester’s location has this option and the model can be bought from only one vendor.

Review each permission as a separate operating choice. A team may be ready for local consumption before it is ready for automatically created purchasing activity. Document the selected options in the handover so the receiving team understands which sourcing actions have been enabled.

Before releasing the stockroom for use, review the saved record with its manager and a technician. Compare service coverage and supply routes with the agreed operating plan, then confirm that physical aisle labels match the identifiers entered in the workspace.

Questions about stockroom changes and handover

Can stockrooms be treated as parts of another stockroom?

Stockrooms are standalone entities in Asset Management. For planning, give each physical stockroom a clear record boundary. Use its sourcing relationships to describe movement between stockrooms instead of assuming that a naming hierarchy establishes that relationship.

What happens when a distribution channel is deactivated?

Clearing Active also makes the corresponding outbound function inactive automatically. Include the other stockroom’s team in the change review, because the effect crosses the relationship rather than staying within one team’s configuration view.

What must happen before deleting a stockroom containing assets?

An inventory_admin must first navigate to All > Asset > All Assets, add the Stockroom column, and filter for that stockroom. Change or remove the stockroom on the asset records before continuing with deletion of the empty stockroom.

What should technicians receive when setup is handed over?

Replace with one sentence: “Hand over the room identity, responsibility assignments, coverage decisions, supply relationships and label convention together, and ask a technician to check them against the room before receiving starts.”