To import and receive assets in bulk at a stockroom, download the workspace Excel template, enter asset identifiers, quantities, and source workflow details, then import it into the selected stockroom. Review row validation before selecting Receive. Existing assets are updated; valid rows without matching records can create assets during receiving.
The destination stockroom and workspace decide where the receipt lands
Start with the destination stockroom and the assets physically arriving there. A spreadsheet can contain valid identifiers while still representing the wrong delivery. Before uploading, compare the receiving location, asset details, and source workflow references with the shipment you intend to accept. Treat this as a receiving decision rather than a spreadsheet upload alone. A quick count of rows against the delivery paperwork before you import catches short or doubled files early.
In Enterprise Asset Workspace, the bulk receiving procedure requires sn_eam.enterprise_admin. In Hardware Asset Workspace, the procedure requires ham_admin. These permissions belong to their respective receiving procedures; changing the batch processing property is a separate action requiring admin.
Check availability and labels on your instance and release: standardized receiving is available from Enterprise Asset Management version 9.0 and Hardware Asset Management version 13.0.0. Brazil, Australia, and Zurich Enterprise Asset Workspace use Import receiving log; the Yokohama and Xanadu workspace procedures use Import assets. Purchase order line receiving is supported from Zurich onward.
For the surrounding delivery process, use the guide to stockroom management and hardware receiving. Because the import starts from a single stockroom, list only the assets arriving there.
Identifiers, quantities and source references tie each row to a physical arrival
The template connects a physical arrival to an asset record and, where applicable, its originating workflow. Prepare those details together. A row that identifies an asset but loses its source reference can leave a different operational result from the one the receiving team intended.
Identify existing assets and describe new ones
Asset tag and Serial number help determine whether a matching asset already exists. Model category, Model name, and Model number provide model information, with required values depending on the category. The Computer model category requires a serial number. If no asset record matches, model details are needed to create a record alongside the supplied identifiers.
Review the identifiers before import rather than relying on a model name to distinguish individual assets. Duplicate serial numbers are an example of invalid import data. For an expected existing asset, an unexpected missing match deserves investigation before you allow receiving to create a new record.
Separate individual assets from consumable quantities
Use Quantity 1 for enterprise assets in the Enterprise Asset Workspace template and for hardware assets in the Hardware Asset Workspace template. For consumables, enter the number being received. Partial consumable quantities cannot be received through this procedure. Check the quantity against the intended receipt rather than copying a shipment total into an individual asset row.
Manufacturer is another template field. The template also includes Reserved for and Parent asset. The presence of Parent asset does not make child assets eligible for bulk receiving: child assets and asset bundles cannot be received through this mechanism.
Preserve the workflow connection
Source type identifies the receiving workflow. TOL represents a transfer order line, POL a purchase order line, and RMAL a Return Merchandise Authorization line. Source ticket holds the corresponding source workflow request number, such as its transfer, purchase, or RMA line number. Match the reference to the line associated with the arriving asset.
Consumable rows require both Source type and Source ticket to identify the correct asset for receiving. For purchasing context, see ServiceNow purchase orders. Have the line reference ready when you check a receipt against its purchasing workflow.
Hardware receiving requires Hardware Asset Management activation when handled through Enterprise Asset Workspace. Enterprise assets require Enterprise Asset Management activation when handled through Hardware Asset Workspace. OT assets require OT Asset Management activation; MAC address and OT entity are required template fields for identifying and receiving them.
A bulk import logs every row before any asset is received
Preparation, import review and receiving are separate checkpoints. An import only produces rows to assess, so the receiving action has not happened yet when the import finishes.
Start from Workspaces, open Enterprise Asset Workspace, then choose Inventory and All stockrooms. Open the destination stockroom there, because the import is started from that stockroom. Select Import receiving log, then Download Template, and fill in the template with the asset and workflow details before you save it. Next, go to Create New Import asset data and give the import a Name your team will recognize later. Select Attach file, choose the saved template, and select Import. When the import finishes, review the imported rows before you choose which assets to receive.
For the Hardware Asset Workspace procedure described for Yokohama and Xanadu, start at Workspaces, Hardware Asset Workspace, Inventory, then All stockrooms. Open the stockroom and select Import assets. The upload form is Create New Import asset; enter Name, use Attach file, and select Import.
Rows appear under Import asset data rows. Processing time can delay their appearance when a file contains many records. The sn_itam_common.receive_assets_batch_size property sets how many records are processed together for import logging and receiving jobs. It defaults to 1,000 records per batch, and only an admin can change it. With the admin role, the number can be adjusted to optimize performance for large volumes of assets. Allow the import to populate before deciding whether an expected asset is absent. A recognizable import name helps reviewers keep an original file and a corrected submission distinct.
Row status shows which rows can be received and which need correcting
Validation results and imported records are stored in Import asset row [sn_itam_cmn_import_asset_row]. Review both Status and Alert. The Import asset data rows tab lists every row from the file, including rows that failed validation. The status indicates the receiving path; the alert explains the specific issue and what needs correction.
- Ready to receive: the row passed validation.
- Receive error (Asset not found): no existing record matches, but the supplied details are valid. Proceeding with Receive creates an asset record.
- Import error: the row failed validation on the data itself, usually a duplicate serial number or a hardware quantity other than 1. Fix the spreadsheet and import it again as a new record, because the failed row cannot be received as it stands.
A row can be received only when its required fields, quantity, and Source type and Source ticket values pass validation. Rows marked Ready to receive or Receive error can go forward to Receive. Read the Alert before you edit the spreadsheet, because it lists the steps needed to resolve each error.
Do not treat the two error labels as equivalent. A missing match can be an expected new asset; an import validation error requires correction. If the row should refer to an existing asset, compare its identifiers with the expected record before accepting the new-record path.
Select the import data rows corresponding to the assets being accepted, then select Receive. Reviewing a mixed file row by row usually stops a valid new asset from being mistaken for an identifier error. For broader fault investigation, use the hardware asset troubleshooting guide.
For help planning this work, see ServiceNow implementation.
The received asset and its source task confirm the receipt took effect
A row that imports as Ready to receive ends up as an in-stock asset with its substate set to available, at the location you chose, and its linked source task closes on its own. Open one of those assets afterwards and confirm the stock state before you count the receipt as finished.
For the Receive error path, receiving creates asset records with State In stock and Substate Available, and sets Stockroom to the selected location. Closure of the source workflow receive task depends on providing Source type and Source ticket. A new asset record appearing in stock does not by itself establish that the intended workflow task has closed.
Check the resulting asset identity, destination stockroom, state, and source task against the receipt you intended. Where the file created a record, check that creating it was expected. Where an existing record was updated, confirm it is the asset represented by the shipment. These checks connect the import result to the physical receipt. A matching row count is only a partial check, because a row can match an existing record that is not the asset on the dock.
The stockroom team running later stockroom operations needs this result to tell accepted assets from rows still waiting for corrected data before it plans the next stock movement.