Create a remediation task manually from the Vulnerability Manager Workspace by selecting Create Remediation Task on the List page, after optionally checking the records to include. The option covers host, application and container vulnerable items, plus configuration test results, from v25.0.4 of Vulnerability Response onward. In the modal, you set the selection, grouping criteria and handling of records already in other tasks.
Manual creation is a separate route from the Remediation Task Rules. Use it when you need records grouped in a way the rules do not produce, when some records are still ungrouped, or when the rules are inactive. This page covers the roles you need, the steps on the List page, each field in the modal, and the checks to run before and after you submit.
Roles needed for each record type
The role you need depends on the record type in the list you open. Each record type has its own line below, so compare your roles against the line that matches the list before you start.
- Host vulnerable items: sn_vul.write_all, sn_vul.vulnerability_analyst, or sn_vul.vulnerability_admin
- Application vulnerable items: sn_vul.app_write_all, or sn_vul.app_sec_manager
- Container vulnerable items: sn_vul_container.write_all, sn_vul_container.vulnerability_analyst or sn_vul_container.vulnerability_admin
- Configuration test results: sn_vulc.write, or sn_vulc.admin
A role listed on one line does not extend to another line. If you cannot complete the steps for a list, compare your roles with that line and raise any gap with the administrator who manages roles on your instance.
When manual grouping fits better than the rules
The Remediation Task Rules group records by their own criteria. Manual creation covers the cases the rules leave open. Three situations call for it:
- You want to group vulnerable items by something other than the Remediation Task Rules criteria. For example, you might create tasks for a particular manager, or for active, new exploits such as ransomware that includes different vulnerabilities.
- You want to group records that are currently ungrouped.
- The remediation task rules are inactive.
The third case is the easiest to miss. When the rules are inactive, manual creation is how you form tasks from those records, so check the rule status on your instance before you assume the rules are doing the grouping.
Before you choose manual grouping for a backlog, check how the rules treat the same records. If application records are part of the work, the page on remediation rules and exceptions for application vulnerability response is the place to compare the two approaches.
Select records on the List page and open the modal
Start in the Vulnerability Manager Workspace, since the List page sits inside it. Record selection is optional, but the Selected items option applies to the records you checked, so check them before you open the modal if you want a subset. Work through these steps in order.
- Go to Workspaces > Vulnerability Manager Workspace > List.
- On the List page, open the Active or All list in one of the following lists: Host Vulnerable Items, Application Vulnerable Items, Container Vulnerable Items, or Configuration Test Results.
- Optional: select the check box of each record you want to update.
- Select Create Remediation Task.
- On the Create remediation task modal, fill in the fields described in the next section.
- Select Create remediation task.
You can also create remediation tasks from the drill-down lists that open when you click a visualization on the Home page. Use that route when a chart already shows the group you want to split into tasks.
Complete each field in the Create remediation task modal
The modal has four fields. Set them in order, because the grouping criteria and the handling choice decide how the records are split and what happens to records already in tasks.
Record selection
Selected items updates the records you checked on the List page. All items updates all the records in the list, which reaches well beyond the check boxes. Look at the record count before you submit, so a broad choice is a deliberate one.
Short description
Enter a brief note about the remediation tasks. Keep it specific to the group you formed. A note that names the exposure, the owner or the system area tells anyone reading the task why its records are together. A generic phrase leaves them guessing.
Grouping criteria
The grouping criteria decide how the selected records split into tasks. All four options begin with the assignment group, so records assigned to different groups do not share a task under any of them.
- Assignment group: records that share an assignment group go into the same task.
- Assignment group and configuration item: records must share both an assignment group and a configuration item.
- Assignment group and vulnerability: records must share both an assignment group and a vulnerability.
- Assignment group and risk rating: records must share both an assignment group and a risk rating.
Each added field splits the selection further, so pick the option that matches how the team will work the items.
Typically, a task built on Assignment group and configuration item fits work on one system. Assignment group and vulnerability fits one issue spread across many systems, and Assignment group alone fits a single owner who handles a mixed set of items.
Managing records in other remediation tasks
Some records you select may already belong to a remediation task. This field controls what happens to them, and each choice leads to a different ownership result.
- Skip records for new remediation tasks: no action is taken on records already in other tasks. They stay where they are and are not carried into the new tasks.
- Move to new remediation tasks: records already in other tasks are transferred to the new tasks.
- Keep in both current and new remediation tasks: records stay in their existing tasks and also appear in the new ones.
Move is the only choice that removes records from their current task, so that task loses them. Keep gives two groups a claim on the same item.
Choose Move when the new task should own those records. Choose Keep when the current task still needs them and a second group has to work the same item. Choose Skip when the existing tasks are right and you want the new tasks to hold only the ungrouped records.
What the modal creates and who gets notified
After you select Create remediation task, remediation tasks are created based on the grouping criteria you chose. Each new task is assigned to an assignment group. An email notification goes to the remediation owners in that group, telling them a task has been created and assigned to their group.
Check the number of new tasks against your selection. With Assignment group as the criterion, expect one new task for each distinct assignment group among the records that were not skipped. The other three criteria can produce more tasks, because each extra field adds a split.
If a group says it did not receive the notification, tell that group directly that the task exists, and point it to the short description so the team can find the work.
Checks to run before and after you submit
- Compare your roles with the line for the record type in your list.
- Confirm the list holds the records you expect, and that the checked records are the ones you intend to include.
- Read Record selection. Selected items covers the checked records, and All items covers the whole list.
- Read the grouping criteria against the groups you want, and check the assignment group on a sample of records.
- Confirm the handling choice for records already in other tasks matches your plan.
- Submit, then compare the number of new tasks with the number of assignment groups in your selection.
- Confirm the owners in each new task’s assignment group received the notification, or tell them directly.
For help planning this work, see ServiceNow implementation.
Common mistakes when grouping records by hand
- Expecting one task across several assignment groups. All four grouping options start with the assignment group, so a mixed selection produces separate tasks.
- Choosing All items when only the checked records were meant. That option updates all the records in the list.
- Choosing Move to new remediation tasks without checking which records leave their current tasks.
- Writing a short description that could describe any group, which leaves the owners without context.
- Starting from a list whose role line you do not hold.
For the reverse step, when an assignment has to come off a vulnerable item or a task, see removing assignments from vulnerable items and remediation tasks.
Questions about mixed record types, releases and the remediation side
Can one selection include host and application vulnerable items?
The steps open one list at a time, and each list holds one record type. Create the tasks from the list that holds your records, then run a separate pass for each other record type. Give each pass its own short description so the groups are easy to tell apart.
Does manual creation work on releases before v25.0.4?
The option starts with v25.0.4 of Vulnerability Response, so do not plan around it on an earlier version. Confirm the version on your instance, then open the List page and check that the Create Remediation Task option is there before you schedule a grouping effort.
What is the difference between a vulnerable item and a remediation task?
A vulnerable item is a record for a vulnerability on a host, application or container, or a configuration test result. A remediation task is the container that holds one or more of those records, and it is the unit an assignment group receives.
Where do I read about the remediation side of the process?
For the remediation side of the process, see the IT Remediation Workspace page. Read it before you hand a grouping to a team, so the handover matches the work that team does with the tasks.