OBLYTECH Logo
OBLYTECH Logo

Container Vulnerability Response Explained

Container Vulnerability Response is the ServiceNow application that imports vulnerabilities found inside container images and turns each one into a tracked record. Those records are grouped into remediation tasks, scored, assigned to a team and given a deadline. Where a fix is not yet possible, the team can record an exception that defers the work for a set period.

How findings enter the application

The application imports container vulnerable items, usually shortened to CVITs. The vulnerability data behind each record comes from internal and external sources, including the National Vulnerability Database and third-party scanners. Connectors exist for container products such as Prisma Cloud Compute from Palo Alto Networks, and for Tenable.cs and Wiz container feeds. The Tenable.cs integrations bring in discovered images and vulnerabilities. The open-vulnerability run follows the container asset run, and the fixed-vulnerability run follows the open run.

Containers change the unit of work. A container is a running instance of an image, so the application can point a CVIT at the source Docker image rather than at a running container. A flaw seen across many running copies of the same image can then be tracked once.

By default a CVIT is created for each combination of image repository, image tag and vulnerability. Administrators can add keys such as the Kubernetes cluster, namespace or service. More keys give finer tracking and more records to manage.

Granularity key What one CVIT represents Reason a team might choose it
Image repository, image tag, vulnerability One flaw in one image version The default; suits tracking image releases
Add Kubernetes cluster One flaw in one image version on one cluster Separate follow-up per cluster
Add namespace or service One flaw scoped to a namespace or service Owners see their own items

Base-image findings are tracked apart from application-image findings, so a platform team can remediate a shared base image on its own schedule. When a newer image version is deployed at runtime, vulnerabilities reported against older versions resolve automatically.

Item states and how tasks roll up

A CVIT moves through states such as Open, Under Investigation, In Review, Deferred, Resolved and Closed. A closed item carries a substate, and when a later scan no longer reports it, that substate is Fixed. A CVIT cannot be closed by hand.

Remediation tasks and their items influence each other. Moving a task to Open, or from Open to Under Investigation, flows down to its items at once. Moving up is stricter. A task closes or defers once its items are closed or deferred, and it carries a sub-state only when those items all share one. When states conflict, the application applies this precedence, highest first: Closed, Deferred, Resolved, In Review, Awaiting Implementation, Under Investigation, Open.

Grouping findings into remediation tasks

Remediation tasks, written as CVULs, collect CVITs so analysts can work them in bulk. Task rules group items through up to six Group by condition sets, and each one picks a field on the item table to group by.

When an item is created, imported or reopened after closing, the rules are checked against it. If an open task with the same assignment group already exists, the item joins it. Otherwise a new task is created.

Editing rules has consequences. Reapply recreates the open tasks built from the changed rule and leaves tasks outside the Open state alone. A new rule runs against new imports, not against existing data.

Assignment, remediation targets and risk scores

Assignment rules send items to a group. The first matching rule runs, so the order of rules matters. Recent versions allow scanner fields as conditions, including registry, hosts, labels, cloud account IDs and the version in which a flaw was fixed. Items that are not Open, or that were assigned by hand, are excluded, and a rerun reassigns items whose assignment type is Rule.

Remediation target rules set the days allowed to fix an item and a reminder before the target date, much like a service level agreement for the vulnerability itself.

Calculator rules set starting values for CVIT fields, including the risk score. Each condition is checked in order and the first match is used. Two calculators ship in the base system, and from version 2.10 the Default Risk Calculator records its contributions in the Notes section. Risk ratings derive from the score, and from version 18.0 the rating bands sit in the Risk Score Weights table. Scores are recalculated when a configuration item becomes internet facing, or when a linked CVE is flagged as a Known Exploit Vulnerability (KEV).

Requesting and approving an exception

An exception defers remediation of a CVIT or remediation task for a set period. Approval also means accepting the risk of leaving the item open during that period. A remediation owner opens an Open or Under Investigation CVIT, selects Request Exception, and completes three fields. Until must fall within the duration set on the Exception Management screen. Reason offers Risk Accepted, Awaiting Maintenance Window, Fix Unavailable, Mitigating Control in Place or Other. Submitting moves the item to In Review, and the State Change Approvals tab tracks it.

Approval is governed by approval rules, and the defaults cover three rule types:

Rule type Approval levels by default Notes
Exception requests Two Level 1 approves first, then level 2; the levels can be changed
Exception rules Two Set in the Approval Rules module, like the other rule types
False positives Two Set in the Approval Rules module, like the other rule types

A two-level workflow needs a first-level approver. Without one, an exception cannot be requested, so check the approver groups before a team starts using the process. From version 15.0 the flow designer is enabled by default on a first deployment, and it cannot be switched back to the older workflow. From version 2.5 the approver’s response window and notification day are configurable. An unanswered request returns the item to Open, and the earlier state is kept in a backup state field.

When an approved exception expires, the item returns to Open. If the next scan no longer reports the vulnerability, the item closes as Fixed.

Deferrals, extensions and exception rules

Defer is the lighter route for low-risk items that can be set aside without further analysis. A daily scheduled job reopens the item on the day its deferral ends. The Container Vulnerability Response group receives email when the expiry falls within one week, and again when the item reopens. From version 18.0, a deferred CVIT that a scanner closes and reopens inside its exception window returns to Deferred, provided the system property sn_vul_container.auto_defer_cvit_in_active_exception_window is set to true.

An extension asks for more time before a deferred date arrives. It passes through two approval levels, and each further extension increases the extend deferral count.

Exception rules cover a pattern rather than a single item. A rule has a condition, a Valid from date, a Valid to date after which the remediation task stops accepting new CVITs, a reason, an assignment group and a Deferred until date. Once approved, its remediation task is created in Deferred, and the rule applies to new CVITs and to items moved from Closed back to Open. On the Deferred until date, the task closes, its items leave the group, and the group rules are reapplied.

Auto-close, false positives and reporting

The base auto-close rule moves CVITs that have not been reported in the last 90 days to Stale. A daily job applies these rules, and a CVIT that is both Closed and Stale closes with the substate Fixed.

False positives cover warnings that are not real issues, such as a decommissioned workload that the scanner still reports. Requesting approval moves the item to In Review, and its approval configuration starts with two approval levels by default.

The dashboard has Overview, Services and Service Owners tabs. Single-value tiles include Vulnerable Items (VIs), which counts active, non-closed items; Vulnerable Docker Images, a 30-day running mean time to remediate, and the percentage of closed items that met their target dates across the current and previous quarters. Breakdowns include Risk Rating, State, Exploit Exists and Assignment Group. Changing how Age is calculated can cause sharp changes in Performance Analytics reports, so agree that with the reporting owners first.

Frequently asked questions

What is a container vulnerable item?

A CVIT is the record for one vulnerability in one container image, scoped by the granularity keys you configure. It carries the state, risk score, assignment and deadline that the rest of the application uses. For the general idea, see the vulnerable item explainer.

Can an exception be requested without a first-level approver?

No. In a two-level workflow the first-level approver must exist before a request can be raised. Check the approver setup before a team starts using the process.

What happens when an exception expires?

The item or task returns to Open, and it closes as Fixed if the next scan no longer reports the vulnerability.

Why does a task show a different state from one of its items?

A task moving to Open flows down at once. A task moving to Deferred or Closed waits until all of its items are closed or deferred. Until then the highest-ranked state is shown, so one item in a different state can hold the task back.

For the wider vulnerability work, see the vulnerability exposure response page. For the shared concepts this application builds on, see the vulnerability response guide.