OBLYTECH Logo
OBLYTECH Logo

CMDB Workspace views explained

CMDB Workspace is the ServiceNow workspace for searching the configuration management database, checking CI health and recent activity, and running the tools that maintain it. It is split into views with different jobs. Home is the default starting point, Governance holds administrator actions, Explore and Search finds configuration items, and CI Form edits a single record.

Who can open each view

Open the workspace from Workspaces, then CMDB Workspace. The store app installs automatically, so setup is mainly role assignment and configuration. The minimum roles are sn_cmdb_admin, sn_cmdb_editor and sn_cmdb_user. Those roles do not open the same features, and some dashboards and list views need one more role on top.

View Who can open it What it is for
Home sn_cmdb_admin, sn_cmdb_editor, sn_cmdb_user Landing page with CI summaries, CMDB Health figures and quick links
Governance sn_cmdb_admin Important actions, What’s new counts and management tools
Explore and Search sn_cmdb_user, sn_cmdb_editor, sn_cmdb_admin Browsing CIs by context or class, and searching the CMDB
SGC Central sn_cmdb_int_util.sgc_admin, cmdb_inst_admin, admin Monitoring Service Graph Connector ingestion

Demo data is offered as a checkbox at install. Leave it off in production, because demo records can mix with real data. The recommended CSDM Activation plugin keeps legacy Lifecycle Status mappings in step with the newer status fields.

Home view: the default starting point

Home opens by default. It shows tasks that need attention, counts of new CIs, CMDB Health aggregations and a set of charts. The CI Summary tab charts CIs grouped into up to 20 CMDB groups. Drilling into a class opens its CI list, and it is also the route to create a CI in that class. Administrators and editors also see My CIs, which charts CIs whose Managed By Group matches one of their groups.

On very large estates, the CI overview queries can run too long. Setting sn_cmdb_ws.ci_overview.enable_simple_condition to true, which is false by default, switches to simpler queries that judge CI status from CSDM attributes such as life_cycle_stage. Estates that have not moved to CSDM get fewer results from them. For the health figures that sit alongside these charts, see the CMDB health dashboard guide.

The Cloud vs Non-cloud charts need three things. The Cloud Service Accounts table must exist. The Logical Datacenter table needs at least one cloud record. The Datacenter Types table needs an entry for each cloud service you use, since a chart calculates for services that have one. Each CI class and storage pair, such as Applications for cloud, runs its own job once a day, with staggered start times. Each job stops after two hours or after collecting 500,000 records. A job that fails three consecutive days is disabled by default. That threshold is set by the sn_cmdb_ws.insight.category.disable_after_failure system property, and a disabled job can be resumed. For the discovery side of cloud records, see the cloud discovery workspace.

Home quick links point to tools such as Query Builder, Unified Map, Create CI and the Data Certification Dashboard. You can add a link to the quick links that are available to you.

Governance view: important actions and admin tools

Governance requires sn_cmdb_admin and opens from the Governance icon. Service Graph Workspace has been consolidated into CMDB Workspace, so its tools now sit in one place.

Important action cards bring work to the top of the view. Health cards cover duplicate CIs, orphan CIs, stale CIs and de-duplication tasks, and they link to the affected CIs or tasks. Attestation and lifecycle approval cards, such as Reassignment Requests and Unassigned Overdue, come from CMDB Data Manager. Admins can change a card’s Active flag and its filter conditions in the CMDB WS Imp Action Card Config table, but not its Type, Persona or Table. A card appears when at least one record matches its filter. Correcting a CI from a health card may not change the health KPIs until the next cycle of the CMDB Health Dashboard jobs. For the wider governance context behind these cards, see the CMDB governance guide.

The What’s new tile counts newly created CIs over the last 24 hours by default, or the last 7 days if you change it. It draws on the Configuration Item, Application, Hardware and Service Instance tables. The CMDB success advisor tile summarises data quality for Data Foundations and for individual applications, including Hardware Asset Management. Check its figures against the records before acting on them.

Data certification in CMDB Workspace

Certification policies are created from the Governance view, which opens CMDB Data Manager. Open and overdue certification tasks appear in the My work tile on the landing page, and tasks assigned to you appear under the Certification tasks section of the Governance view. The Data Certification Dashboard shows certification instances, tasks and status, and you can drill down to a specific task to reassign it.

This experience and the legacy Core UI build run separately and do not synchronise. A filter or certification schedule defined in one does not appear in the other. Certification execution records are excluded from routine cleanup, archived two years after creation and destroyed seven years after archival. Longer retention supports audits, and the dashboard is built from the same records.

Explore and Search: finding CIs without the data model

Explore has two modes. Contexts groups classes into a hierarchy of categories and needs the Service Graph Workspace – Content store app. Classes builds the navigation from CMDB groups of type CMDB Workspace, and it is the mode in use without that app. Either way you drill down to a CI list, and selecting a CI opens it in CI Form. For the data model behind classes and groups, see CSDM domains and CMDB classes.

The Search tab has two engines. AI search uses ServiceNow Otto and needs the sn_cmdb_user and now_assist_panel_user roles, version 3.0 of the ServiceNow Otto for CMDB store app, and an activated Search result classifier skill. When those conditions are not met, the tab falls back to Intelligent Search. An ambiguous query opens a Refine your query dialog. Results load 100 at a time, and Load All Results stops at the limit in glide.cmdb.query.max_results_limit, which defaults to 10,000.

CI Form: one record in sections

Selecting a CI opens CI Form, because the sn_cmdb_ws.explore_ci.record.enabled property is true by default. The form follows the Explore CI view, and child classes inherit their parent’s form.

Section What it holds Practical note
Summary Created, Managed by, Discovery source, Operational status First section of the Explore CI view
Attributes Discovery, Operational and All subsections Mandatory attributes are marked with an asterisk; editing needs sn_cmdb_editor
Tags Key and value pairs, typically cloud tags Platform tags are not shown in this section
Resources File Systems, Software Installed and Network Adapters by default New can open Create CI for IRE-enabled tables
Activity Charts for incidents, changes and problems, plus CI history Chart list is configured in its own table
Relationships Total, duplicate and stale counts, in tree or flat view Edit relationships opens Unified Map and needs sn_cmdb_editor
Services and Offerings Cards for service instances and business or technology offerings Each tile drills to its records
Health Completeness, Correctness, Compliance and Relationship results Detail appears when CMDB Health is set up and its jobs run

Saving changes runs the Identification and Reconciliation Engine (IRE) rules for the class. A likely duplicate, or a dependent CI without a valid parent, pauses the update and offers mitigation. Unless you set a different value, a CI edited in the form records its discovery source as Manual via IRE. For how these rules decide whether a record is new, see the CMDB identification and reconciliation.

Creating a CI manually

Create CI is reached from the Create CI quick link on Home, or by drilling from the CI Summary tab through a class group bar to a class list. It needs the cmdb_manual_ci_ire_access role, which sn_cmdb_editor contains by default. Classes without a valid identification rule are greyed out and cannot be chosen.

The flow runs in order. Choose a class. Complete the required attributes, including a dependent-upon CI where one applies. Set the criterion attributes that make the CI uniquely identifiable. If an existing match is found, review that CI and decide which record to change. Add any attributes your administrator requested, define relationships, then review and create. The new CI starts with discovery source Manual via IRE and operational status Design. Application services are not created through this flow and need their own wizard. Excluded classes show a New button instead, which opens the Core UI form without IRE processing. For the wider rules that decide whether a CI is unique, see CI lookup rules.

SGC Central: monitoring connector ingestion

Users with the sn_cmdb_int_util.sgc_admin, cmdb_inst_admin or admin role can use SGC Central, which is opened from the SGC Central view in CMDB Workspace. Administrators can create and manage connections, set import schedules and monitor connections and data imports. Administrators use the SGC Central dashboard to monitor connection status and performance, and to spot errors in the connection or data processing pipeline.

Which CMDB visualization and workspace tools are deprecated in Brazil, and what replaces them?

As of November 2026, Service Graph Workspace is deprecated in the Brazil family, with its functions moving into CMDB Workspace. CMDB Baseline is flagged for future deprecation. For CMDB visualization, Unified Map is the replacement, and it also takes over from Dependency Views and the CMDB Relationship Editor.

Service Graph Workspace: where its functions now live

Brazil reached general availability on 5 November 2026, and the change ships with that family. In practice the work is about navigation rather than records. Anything that used to open Service Graph Workspace now belongs in CMDB Workspace, so the migration task is finding the people, bookmarks and saved links that still point to the old place.

Map each person to the view they need before the upgrade. As of November 2026, Explore covers browsing and searching CIs, and Governance covers administrator actions. A user who only browses does not need Governance, and granting that role to fix a bookmark is the wrong fix.

CMDB Baseline: plan for future deprecation

As of November 2026, no removal date for CMDB Baseline has been confirmed in the sources checked for this page. It still works now, but it should not gain any new dependencies. Build no new reports, dashboards or runbooks on it. List each existing use with an owner, and recheck that list each upgrade cycle until a removal date is published for your family.

Unified Map: the replacement for dependency and relationship views

CMDB visualization is consolidating around Unified Map as of November 2026. It replaces two tools directly:

  • Dependency Views, used to read how a CI connects to the CIs and services around it
  • CMDB Relationship Editor, used to add, change or remove relationships between CIs

A useful test before an upgrade is to take a handful of CIs that carry duplicate or stale relationships, then confirm that an editor can complete the same clean-up through Unified Map with the permissions they actually hold.

Upgrade checklist for the CMDB tool change

  1. Confirm which ServiceNow family each instance runs and whether Brazil is in its upgrade path, before changing any user-facing link.
  2. List every user, bookmark and saved link that points to Service Graph Workspace, and move each one to CMDB Workspace.
  3. Confirm each user’s role matches the view they need, using the view list above.
  4. Search reports, runbooks and scripts for Dependency Views, CMDB Relationship Editor and CMDB Baseline, and record an owner for each hit.
  5. Test the Unified Map relationship work in a sub-production instance on a sample of CIs before production.

Frequently asked questions

Which view should a new CMDB user open first?

Open Home, which is the default view. Use Explore and Search when you need a specific CI, and Governance when you are working through administrator actions.

Why is a class greyed out in Create CI?

The class has no valid identification rule, so the workspace cannot check that a new record of that class would be unique. Such classes cannot be selected in the flow.

Why might the Cloud vs Non-cloud chart be empty?

Check the Cloud Service Accounts table, a cloud record in the Logical Datacenter table, and a Datacenter Types entry for each cloud service. A job that fails for three consecutive days is also disabled by default.

Why are some important action cards missing?

A card appears when at least one record matches its filter, and which cards show depends on the signed-in person’s role.