A walk-up queue serves requesters in check-in order. Each check-in creates an interaction, which an agent takes from the unassigned list or from an Agent Workspace inbox. The agent resolves it at the desk, fulfils it from the stockroom, or escalates it, then closes it as Closed Complete or Closed Abandoned.
How a requester enters the queue
When a requester checks into a walk-up location, the system creates an interaction and places it in the Queued state. It stays queued until an agent accepts it or is assigned to it, and then it moves to Work in Progress. The check-in can also capture a reason for visit. Administrators define those reasons and set the priority order of each reason at a given location.
Support runs first come, first served, and the agents on the queue decide who they help next. As requesters arrive, technicians share the work by assigning queued interactions to themselves.
Some requesters carry a VIP flag. The system recognises the flag at check-in, and the interaction shows true for VIP in the Interactions list. The agent moves a VIP requester to the front by assisting them first.
Two routes by which agents receive work
Technicians can pick interactions by hand from the Walk-up Experience modules, or the platform can push them into a personal inbox in Agent Workspace. Both routes exist side by side, and an agent can work with anyone in the queue at any time, whichever route the interaction arrived by.
Creating a walk-up interaction by hand in a table is not supported. An interaction is valid for check-in or appointment only when it comes through the check-in or appointment booking interface, and agents cannot check a requester in on that person’s behalf.
Manual pickup
Technicians who work by hand use the Walk-up Experience Technician modules in the application navigator.
| Module | What it holds | Interaction state |
|---|---|---|
| My Assigned Walk-ups | Interactions the agent accepted or was given | Work in Progress |
| Open – Unassigned | Open interactions for the agent’s location with no owner | Queued |
| Closed Walk-ups | Closed Complete and Closed Abandoned interactions for the location | Closed |
To take an unowned interaction, open Open – Unassigned, find the requester under the Opened for column, and open the interaction number. Enter your name in the Assigned to field, change State to Work in Progress, and select Update. An assigned agent can later transfer the interaction to another agent or queue.
Automatic pushes to the inbox
Interactions can also be pushed into a personal inbox in Agent Workspace. The push follows agent schedules and assignment rules configured in the Advanced Work Assignment feature. Agents signal readiness with one of three statuses: Available, Away or Offline. Set the status to Available to receive work.
Pushed items are worked in the order they appear. The inbox is in Agent Workspace Home under Inbox, and the application navigator links to it through Walk-up Experience, Technician, then My Walk-up Inbox.
Working an interaction from start to finish
Accepting or rejecting incoming work
Open Inbox and set the status to Available. If no walk-up interaction is assigned to you, one is pushed. Open it and choose Accept to start the work, or Abandon to reject it.
Putting work on hold
Two common situations call for a hold. The first is a requester who is absent for a scheduled appointment. The second is a long process, such as an operating system upgrade. In Agent Workspace, select Put on Hold. On the manual form, choose On Hold in the State field.
A held interaction keeps the requester’s place in the queue, so the agent can help someone else in the meantime. Holding does not reduce the agent’s capacity for new interactions.
Recording a requester who has left
If a requester leaves before receiving help, abandon the interaction. On the manual form, use the Abandon action in the header, or set State to Closed Abandoned and select Update. Abandoned interactions remain listed in Closed Walk-ups for that location.
Fulfilling requests from the stockroom
Some walk-up requests are for a physical item, such as a computer monitor or a keyboard. Each location has a stockroom that an agent can draw on from the interaction, so the requester can leave with the item in hand.
Consuming an item in platform view
From My Assigned Walk-ups, open the interaction and select Stockroom Consumables under Related Links. Select the display name of the requested consumable, then select Consume. Enter the Quantity, Asset and User, then select OK. The consumable record then shows the item as consumed and attached to that user.
Retrieve the item and hand it over. Then set State to Closed Complete and select Update, or use the Close button in the header.
In Agent Workspace, the stockroom is reached from List, then My Stockrooms.
When the stockroom cannot supply it
If the stockroom does not hold the item, use Create Request. On the manual form it is a related link; in Agent Workspace it is in the more UI actions menu in the interaction header. Either way, it opens the Service Catalog for the requester. The resulting request appears under Requests for Interaction, which keeps the link back to the visit.
Escalating to incidents and using Agent Assist
Some problems need more than the desk offers. The agent can create an incident from the interaction, using Create Incident as a related link on the manual form or as a button in the Agent Workspace header. In Agent Workspace, Create Case is also available for walk-up work that needs a case.
Incidents linked to the interaction appear under Incidents for Interaction. Incidents by Same Caller and Requests by Same Caller show earlier records for the same requester, which gives useful context.
In Agent Workspace, the new record opens in a tab beside the interaction’s Details tab. Complete the form and save it. Saving a catalog order returns a Request Number that can be given to the requester. Agent Assist is a contextual search inside that new tab, opened with the agent assist icon. It is a contextual search that helps the agent expedite incidents and requests.
Closing out and reviewing the queue
When the issue is resolved or the request fulfilled, set the interaction to Closed Complete and select Update, or select Close in the header. In Agent Workspace, closing frees the agent’s capacity, and a new interaction is pushed to the inbox. Putting work on hold does not free that capacity, so closing is what brings the next requester in.
Agents can review a location’s queue from the List icon in Agent Workspace, under Walk-up, then Walk-up Locations. Selecting a queue shows its interactions, appointments and reasons for visit.
Managers use the Walk-up Experience dashboard, opened from Walk-up Experience, then Dashboard. It shows walk-ups by hour and by day of the week, average wait and service time by location, and satisfaction from the exit and email surveys. Last-year views use a 364-day window counted back from the current date.
Roles, domains and installed components
Technicians use the sn_walkup.walkup_technician role to work the queue and fulfil requests. The sn_walkup.walkup_manager role manages technicians at a location and opens the dashboard. The sn_walkup.walkup_admin role configures the modules and includes the manager role.
A separate sn_walkup.walkup_login role is a device account. It belongs to the user record that signs in to the check-in tablet at the on-site portal, not to a person, and that record can carry only this role. For security reasons, the portal cannot be opened with the admin role.
Domain separation is supported at the basic level. Location queues and interactions support it, and agents work on the interactions their domain makes visible to them. Each location queue has a Domain field that keeps it visible to users in that domain during online check-in. Advanced Work Assignment routing also needs each queue to carry a routing condition that names its domain. Appointment booking is not domain separated, so appointment list views can show data across domains.
Testing the queue after a change
After an upgrade or configuration change, run the quick start tests. The Walk-up Experience – Tests suite checks location creation by a walk-up administrator and onsite check-in by ITIL, ESS and guest users. Adjust the copies to the instance’s own data before relying on them.
Does Walk-Up Experience on its own justify paying for a higher ITSM package than Standard?
No. In the legacy Standard package, Walk-Up is already included, so paying for a higher package to get Walk-Up would buy a capability Standard already covers. A higher tier is justified only by what it adds beyond Walk-Up, such as full Virtual Agent or Predictive Intelligence, and only when your desk has a measurable problem those features would solve.
What Standard already covers
The legacy entitlement schedule, effective 20 September 2024, places Walk-Up in the Standard package alongside Incident, Problem, Change, Request, Asset and Cost, and Digital Portfolio Management. Package material dated 20 November 2025 corroborates this. Read it as a right within that stated scope. Installation, configuration and usage limits on your instance still need checking.
What a higher package adds for a service desk
- Full Virtual Agent. Standard includes Virtual Agent Lite, documented on 31 July 2025 as prebuilt, keyword-based conversations with no new custom topics or natural-language-understanding models. Full Virtual Agent is a separate entitlement in legacy Pro.
- Predictive Intelligence. Classifies and routes incoming work. The documented configured minimum is 10,000 training records (documentation updated 10 September 2026).
- Premium analytics. Standard includes ordinary reporting; premium analytics is a separate legacy Pro entitlement.
- Enterprise additions. Workforce Optimization and Process Mining, both also optional add-ons in legacy Pro. As of documentation updated 10 September 2026, Workforce Optimization is being prepared for future deprecation, so a new purchase needs a current deployment check.
Where the desk’s problem usually sits
Queue order comes from the reason-for-visit priorities an administrator sets at each location and from the agents working the queue. If the delay comes from misrouted work or repeated questions a self-service channel could answer, Predictive Intelligence or full Virtual Agent is worth scoping.
A check to run before comparing packages
- Record the current order: package name, SKU, user counts and renewal date.
- List the Walk-Up roles in use, including the device login role on the check-in tablet, and confirm each is licensed on the proposed order.
- Write the bottleneck in numbers, such as average wait by location or misrouted interactions per week.
- Match each bottleneck to one feature of the higher package. If no feature matches, the upgrade has no stated purpose.
- Price the first-year and recurring incremental cost, including administration and knowledge upkeep, before approval.
What to ask for in writing
- Where Walk-Up appears on the proposed order, by name and SKU. As of November 2026, the public package cards on ServiceNow’s US pricing page, checked 26 November 2026, use Foundation, Advanced and Prime.
- Whether the Walk-Up dashboard and the technician roles are included at the tier you are buying.
- The conversation allowance for full Virtual Agent and how each conversation is counted.
- Written support and transition terms for Workforce Optimization, if it appears in the business case.
Frequently asked questions
Can an agent create a walk-up interaction in a table?
No. Manual creation is not supported. The interaction must come through the check-in or appointment booking interface.
What happens if a requester is not there when their turn comes?
Set the interaction to On Hold. The requester keeps their place in the queue, and the agent can help someone else meanwhile.
Does a VIP flag move a requester to the front?
The flag is shown on the interaction. The agent moves the requester forward by assisting them first.
Can agents use the inbox and the manual modules together?
Yes. Pushed work and manual pickup coexist, and agents can work with anyone in the queue at any time.
Who can open the dashboard?
Users with the walk-up manager, walk-up admin or admin role.
What is the difference between service time and wait time?
Service time is how long an interaction takes to close. Wait time is how long a guest waits before being served. A busy desk can show a short service time alongside a long wait, so the two figures answer different questions.