OBLYTECH Logo
OBLYTECH Logo

Operational technology incident management in ServiceNow

Operational technology incident management in ServiceNow records a disruption to a plant or utility device as its own incident, kept apart from IT incidents. This guide follows the working sequence: installing the application, setting it up, raising incidents, calculating priority, splitting work into tasks, and resolving and closing the record.

Why OT incidents need their own record

An OT incident is a disruption in service from an OT device on an OT network. A controller stops reporting, or a production line halts because a piece of equipment fails. The engineers who fix these problems work on live equipment, so they need a queue of their own. ServiceNow lets you manage OT incidents separately from IT incidents, so the work sits in its own queue.

If the device is not known when the problem is reported, the incident can be logged against the equipment model entity where the fault appeared. Each incident then moves through a life cycle managed by the OT Incident manager, from creation to closure. The OT Incident manager is responsible for the default life cycle from creation to closure, so name that owner in your process before the first incident is raised. Utility teams can also read the OT management for utilities page.

Installing the application and its prerequisites

The application identifier is sn_ot_inc_mgmt, and an admin performs the install. Confirm that the entitlements for the application and its Store applications are valid first. Two plugins must be active. CMDB CI Class Models (sn_cmdb_ci_class) extends the CMDB class hierarchy, and ISA Equipment Model (sn_isa_model) holds the data model for ISA-95 equipment model entities.

You also need at least one of two Store applications. Operational Technology Manager builds the foundational OT data and relationships, with support for the CMDB, Service Graph Connectors and Discovery. Industrial Process Manager builds the ISA-95 equipment model foundation, so each industrial site can hold its own equipment models. If you need asset visibility for OT devices, review the OT visibility approach before installing.

Find the application under All > System Applications > All Available Applications > All, search by name or by sn_ot_inc_mgmt, and install any dependencies listed in the dialog first. In the Brazil release, the latest version also installs Industrial Process Manager for Operational Technology Service Management users who lack an OT Visibility license.

Setup steps before the first incident is raised

Version 2 of the application depends on Tokyo P5 or later. Admins can run the Guided Setup at Industrial Workspace Admin > Guided Setup. It covers six tasks: installing the application, assigning roles, migrating OT incidents, configuring categories and subcategories, configuring state models, and optionally creating an assignment rule. The migration task applies when upgrading from Paris, San Diego or Tokyo to Utah.

Create an OT-specific assignment group, because that group is what gets assigned to OT incident records. Then build the state model. You can create one state model per site, starting from the default OT Incident: Default Flow model. The assignment rule runs when an OT incident is opened and routes it by condition, so write its conditions against the groups you created.

Raising an incident from a device or a change

Writers can create an OT incident from an OT device form, an equipment model entity form, or the List module in the Industrial Workspace. The form asks for a short description, the site, the equipment model entity and the OT device. The number carries an OTINC prefix.

Incidents can also be tied to change requests. The OT change record has two related lists, Incidents Fixed by Change and Incidents Caused by Change. Adding or creating an incident there requires both sn_ot_change_write and sn_ot_incident_write. An incident can link to one change request as its fix and to one as its cause. If you add an incident that is already linked to another change, the new link replaces the old one, so check the related lists first. The OT change models page covers the change side.

Setting priority from impact and urgency

Priority is calculated from two inputs. Impact measures the effect of the incident on business processes. Urgency measures how long resolution can wait before the impact becomes significant. The result tells the OT engineer how quickly to act, and it also drives service level agreements.

The Priority field is read-only by default. Lookup rules sit under Priority Lookup Rules, and creating or changing them requires the ot_incident_admin role. Each rule also carries a scope, an Active switch and an Order value. The sample rules produce these results:

Impact Urgency Priority
1 – High 1 – High 1 – Critical
1 – High 2 – Medium 2 – High
1 – High 3 – Low 3 – Moderate
2 – Medium 1 – High 2 – High
2 – Medium 2 – Medium 3 – Moderate
2 – Medium 3 – Low 4 – Low
3 – Low 1 – High 3 – Moderate
3 – Low 2 – Medium 4 – Low
3 – Low 3 – Low 5 – Planning

To change the logic, you can edit the lookup rules, or disable the UI policy named Priority is managed by Data Lookup – set as read-only and build your own logic. Because priority also sets SLA timing, test a rule change against a few realistic incidents before relying on it. The general priority lookup rules page covers the wider model.

Working an incident through its states

State Meaning
New Logged, not yet investigated
In Progress Assigned and under investigation
On Hold Waiting on another party for information, evidence or a fix
Resolved An acceptable fix is in place to stop a recurrence
Closed Resolved for a set period, with the fix confirmed
Canceled Found to be a duplicate, unnecessary, or not an incident

On Hold carries one of four reasons: Awaiting Caller, Awaiting Change, Awaiting Problem or Awaiting Vendor. Awaiting Caller makes the Additional comments field mandatory. When the caller updates the incident, the reason clears, the state returns to In Progress, and the Assigned to user and the Watch list receive a notification. An incident can go On Hold more than once before it closes.

Breaking the work into incident tasks

Incident tasks divide the work needed to resolve an incident into categorized pieces. Writers open the incident in the Industrial Workspace, select the Incident Tasks tab and choose New. Site, Equipment Model Entity and OT device fill in from the parent incident and are read-only. Changing the Assignment group clears the Assigned to field, so the next person is chosen deliberately. Tasks can be assigned to IT groups when the work crosses teams. Engineers find their work under OT Tasks > Assigned to Me, OT Tasks > Assigned to My Groups and OT Tasks > Unassigned.

Summarizing an incident

The ServiceNow Otto for Operational Technology (OT) Service Management application adds a Summarize button to the incident record. Users need the sn_ot_incident_write role. The summary is generated from the short description, description, work notes, additional comments, priority, site, equipment model entity, OT device and incident tasks. You can edit it and save it to the work notes, expand or collapse it, copy it, or mark it helpful or not helpful. Because the summary draws on what is already on the record, a thin description is likely to give a thin summary.

Resolving and closing an incident

When the issue is corrected, open the in-progress incident and complete the Resolution Information related list. The resolution code is one of seven values: Duplicate, Known error, Resolved by caller, Resolved by change, Resolved by problem, Resolved by request, or Solution provided. Write the Resolution notes to describe how the fix was made, set State to Resolved, and select Update. The incident also auto-closes after a period set by the incident auto-close properties, and you can close it yourself once you are satisfied with the resolution.

Roles, tables and system properties behind the process

The application installs three roles. The OT Incident Admin role (sn_ot_incident_admin) can create, view, delete and edit OT incident records for any equipment model entity, and it configures priority lookup rules and system properties. The OT Incident Fulfiller role (sn_ot_incident_write) can view, create and edit records. The OT Incident Reader role (sn_ot_incident_read) can view them. The main tables are sn_ot_incident, sn_ot_incident_task and dl_ot_inc_priority. The older ot_incident_user role is deprecated.

System properties sit under Industrial Workspace Admin > Operational Technology Incident Management > System Properties. Set the application scope first. The closure property com.sn_ot_inc_mgmt.sn_ot_incident_task.closure closes open tasks when the incident is closed or canceled. The property com.snc.sn_ot_incident.create.child.enable allows child incidents, and com.snc.sn_ot_incident.copy.attributes lists the attributes copied to a child. The glide.ui.sn_ot_incident_activity.fields property sets the fields shown in the activity formatter.

Which OT incident, change and discovery steps can a service-management team coordinate at a mine or energy site, and which must stay with plant engineering?

A service-management team can own intake, routing, status tracking, linked change records and reporting for OT incidents, and keep an approved OT device inventory related to each site. Plant engineering keeps diagnosis, live-process decisions, approval of any OT network discovery or change, and every safety function.

Steps a service-management team can run

The split follows who has to act, not which network a device sits on. Engineering decisions still need to be written back onto the record.

  • Log each incident against the site, equipment model entity and OT device on the form.
  • Route the incident through the assignment rule to the OT assignment group, and check that the rule’s conditions still point at groups that exist.
  • Track On Hold reasons, including waits on a vendor or a change, so each delay stays visible.
  • Open incident tasks for IT-side work so each part of the fix has a named owner.
  • Link the incident to the change that fixed or caused it, so it appears under that change’s Incidents Fixed by Change or Incidents Caused by Change list.

Steps that stay with plant engineering

Service management can record these decisions but should not make them.

  • Diagnosing the fault on a controller, drive, analyzer or line, and sequencing the repair on live equipment.
  • Approving every OT change, and any discovery of an OT network, before it goes ahead.
  • Deciding whether a unit can be isolated, restarted or run in a degraded state, using process conditions the ticket does not show.
  • Approving network discovery or new connectivity to any OT segment, since discovery on a live control network is an engineering call.
  • Keeping plant control and safety functions, including trips and emergency stops, outside service-management automation.

Where regulated events sit outside the incident queue

Closing a ticket does not discharge a reportable event at a mine or petroleum site. In New Zealand, as of November 2026, notifiable events at mining and petroleum operations carry their own notification, site-preservation and recordkeeping duties, and a generic IT incident does not meet them. Start with classification. If the event is notifiable, escalate it to the accountable site role at once, preserve the evidence, and name who makes the notification. Service management keeps the evidence trail and the acknowledgment record; the notification decision stays with the site role.

Questions to settle before the first incident is raised

  1. Who approves OT data collection, connectivity and changes at each site, and who covers when that person is off shift?
  2. Which system owns equipment records, maintenance work orders, parts and costs, so the incident record does not become a second copy.
  3. Which events at each site are notifiable, who decides that, and which regulator channel applies.
  4. What happens when the remote-site connection drops during an emergency, and has that path been tested apart from normal running?

Frequently asked questions

Can an OT incident be raised when the device is unknown?

Yes. The incident can be logged against the equipment model entity where the issue occurred, so it still points to a location on site.

Does priority change on its own?

It is calculated from impact and urgency, so changing either input changes the result.

What happens to open tasks when the incident closes?

Open tasks close when the incident is closed or canceled only if the closure property is set to Yes.

Does a new install need the migration step?

No. The migration task applies when upgrading from Paris, San Diego or Tokyo to Utah.

Set up the application, the priority rules and the state model first, since those three decisions shape the daily work. Teams that run wider IT operations can place this process alongside the IT operations management hub, which covers the related products.