A threat lookup checks an observable, such as an IP address, file hash or URL, against outside threat intelligence and records what each source reports. In ServiceNow, reputation calculators and finding calculators then combine those reports into one verdict per observable: Malicious, Suspicious, Clean or Unknown.
Four places a threat lookup can start
A lookup can begin in four places. The first is automatic: when an observable is associated with a security incident for the first time, all active threat lookup implementations run. The other three are manual.
| Starting point | Role | What runs | Where the result shows |
|---|---|---|---|
| Observable first associated with a security incident | Not stated | All active threat lookup implementations | Threat Look Up Results related list |
| Security incident, Associated Observables tab | sn_si.admin | Zscaler global threat library lookup | Threat Look Up Results related list and work notes |
| IoC Repository, Observables list or record | sn_ti.write | Selected implementations, or All active ones | Threat Lookup Results tab |
| Threat Analyst Workbench, Observables record | sn_sec_tisc.admin | Selected implementations | Work notes on the record’s activity stream |
The Zscaler lookup checks IP addresses, URLs and domains against the Zscaler Internet Access global threat library. When you run it by hand from an incident, the platform picks the configuration with the least order value by default. Manual runs report their status in the work notes. For the wider security operations context, see the security operations guide.
Connecting threat lookup sources in TISC
The Threat Intelligence Security Center supports threat lookup for two integrations: VirusTotal and CrowdStrike Intelligence. The Enrichment Integrations module appears once at least one integration that supports any capability is installed.
To add a source, open Workspaces, select Threat Intelligence Security Center, choose the Integrations icon, open the Threat Lookup section and select Configure new enrichment action. Pick the integration from the pop-up. The create form opens with the vendor name filled in and the integration type fixed to Threat Lookup. You then supply a name, such as VirusTotal-1, and a description that is unique across your integrations. The integration configuration fields vary by app and typically include an API key, client ID and secret, or username and password.
Saving validates the details and creates the integration with a status of inactive. If you do not yet have the credentials, Save as Draft keeps your entries without creating the integration. Enable switches it on. The same enable, disable and delete actions sit in the Actions menu on the Catalog page and the Enrichment Integrations page.
The IoC Repository route has its own prerequisites. The Threat Intelligence plugin must be activated, and the plugin for each scanning implementation must be installed: CrowdStrike Falcon Intelligence, OPSWAT Metadefender, Security Operations Have I been pwned? or VirusTotal.
Reading lookup results and their origin
Completed lookups appear in the Threat Lookup Results tab, and the Result value on any row opens the raw vendor response. The Recent Threat Lookup Result tab, which shows the newest result from each vendor, is not in the base system; you add it through Configure, Related Lists. For the other topics in this group, see the threat intelligence hub.
Shared activities in the VirusTotal workflow
The Threat Lookup – VirusTotal workflow runs when the Security Operations Integration – Threat Lookup capability is invoked and the VirusTotal implementation is selected. It scans observables of types that VirusTotal recognises for malware and returns the results to the record. Its role requirement is admin.
The workflow reuses activities common to Security Operations integrations. Determine Observables decides which observables enter the flow. Get Supported Security Capabilities reports the name and number of active integrations that support a requested capability. Roll up lookup info to security incident summarises a threat lookup and writes the summary to the task work notes, together with the ID of the originating incident. For the analyst side of incident handling, see the security incident triage workflow article.
How reputation calculators combine vendor verdicts
When more than one vendor reports on the same observable, the reputation calculator considers the recent results from all of them and applies four conditions, checked against the latest result from every vendor, to set one overall finding.
| Rule | Condition across vendor results | Overall finding |
|---|---|---|
| 1 | At least one vendor reports Malicious | Malicious |
| 2 | No vendor reports Malicious, and at least one reports Suspicious | Suspicious |
| 3 | All vendors report Clean | Clean |
| 4 | No vendor reports Malicious or Suspicious, and at least one reports Unknown | Unknown |
The conditions do not overlap, so any mix of vendor verdicts maps to exactly one finding. One vendor reporting Malicious sets Malicious whatever the others report, because Clean needs every vendor to agree. A mix of Clean and Unknown lands on Unknown, since not every vendor reported Clean.
Integrations that compute their own result are mapped onto the base-system findings by the finding calculator.
Creating and maintaining a reputation calculator
Reputation calculators live under Workspaces, Threat Intelligence Security Center, Administration, in the Threat Lookup Reputation Calculator section. Select New to create one; role sn_sec_tisc.admin is required. The form asks for a name, an Active flag, the Threat Lookup Vendor and a reputation script. The Active flag matters more than it looks: the calculation runs while it is selected. Set the vendor to the one the calculator serves, for example CrowdStrike Falcon Intelligence. Each integration ships with a base reputation script to adjust as needed. The platform allows one active threat lookup calculator per vendor at a time.
Finding calculators and observable finding override modes
Finding calculators sit under All, Threat Intelligence, Administration, Threat Lookup Finding Calculators. Role sn_ti.admin is required. Select New and complete the Threat Lookup vendor field, the Observable Type field and the Finding Script field. Leaving Observable Type blank applies the script to all observables. The base system includes a sample Finding Script that you can use as it stands or modify. Select Update to save.
How lookup results change an existing finding is controlled by a separate property. Under Threat Intelligence, Administration, Properties, the Observable finding override mode property takes one of three values.
- Default recalculates the finding from threat lookup results each time, overwriting the previous value.
- Override lets an analyst set a finding manually for a limited period. The system does not change it during the validity window.
- Precedence follows a priority order. Severity upgrades apply immediately, while downgrades wait until an expiry window for that observable type has passed.
Precedence mode depends on two further settings. The Precedence expiry field on each observable type record sets how many days a higher-severity finding is kept before a downgrade applies; its default is 0 days. The Observable finding precedence order property ranks the findings, and by default the order is Malicious, Suspicious, Unknown, Clean, with Malicious highest.
Sending threat lookup results to TISC
Analysts push lookup results from Security Incident Response into TISC with the sn_si.analyst role. Start from the Related Records tab on the SIR workspace, where the TISC integration capability action sits, or from the Investigation tab through Entry Points and Associated Observables. Then go to Threat Intel, Threat Lookup Results, select one or more records and choose Send Results to TISC. The push behaves differently by mode.
In manual mode, a missing observable is created first as a source observable. Once that source produces a TISC observable record, the platform associates it and pushes the selected lookup to it. Manual pushes need the observable linked to a security incident. In automatic mode, lookups are pushed when the observable already exists in TISC; if it does not, the lookups are not pushed.
A confirmation message states that the observable is missing from TISC and that creating and associating it takes time. To verify the outcome, open TISC Context, which lists SIR-associated observables that also exist in TISC along with their threat lookups, sighting search results and enrichment results. The record form shows the ingestion type, automatic or manual, and the Source value Security Incident Response.
Submitting IoC lookups from incidents and the catalog
The security incident form runs an IoC lookup automatically when observables are added, provided the Threat Intelligence plugin is activated. To look up attached files, use the paperclip in the form header, save the record, and select the Lookup attachments button that then appears. Progress is reported in the work notes under Incident Details, the lookup number opens the lookup record, and the Lookup reference link shows detailed results.
The Security Incident Catalog offers a second route, which requires the Security Incident Response plugin. Go to Self-Service, open the Security Incident Catalog, choose IoC Lookup and then the option to look up files, hash values, URLs or IP addresses. No role is required to submit.
While the File lookup type is inactive, its default state, attached files are converted and submitted as hash values, and hash values become the default action for both files and hashes. URLs, IP addresses and hashes are entered as comma-separated lists. Track the request under Self-Service, My Requests. The work notes on the SR number list each individual lookup and its result.
Frequently asked questions
Which integrations can run a threat lookup in TISC?
Within the Threat Intelligence Security Center, threat lookup supports VirusTotal and CrowdStrike Intelligence. The Enrichment Integrations module appears when at least one supporting integration is installed.
Why did my observable not reach TISC after I sent the lookup?
A missing observable blocks an automatic push. Manual mode creates it first as a source observable, and the association takes time. Manual pushes also need the observable linked to a security incident.
What happens to a finding when a newer lookup disagrees with an earlier one?
It depends on the observable finding override mode. Default mode recalculates and overwrites. Override mode leaves a manually set finding in place during its validity window. Precedence mode applies upgrades immediately and holds downgrades until the expiry window for that observable type has passed.
Why are uploaded files submitted as hashes in the catalog?
The File lookup type is inactive by default, so the platform converts each file into a hash value and looks up that value.