OBLYTECH Logo
OBLYTECH Logo

Next Experience Page Setup

If users land on the wrong page, see an unsuitable layout, or cannot search a workspace, inspect the control responsible for that symptom. Next Experience page setup in ServiceNow separates the Core UI login destination, workspace page variants, and Unified Navigation search. Configure the affected area, then test the user’s journey.

Scope the Next Experience page setup

Before opening a configuration record, capture the screen the user currently sees, the audience affected, and the destination or view they should receive. For a search problem, also identify the workspace and a known record that should be discoverable. These details distinguish a login destination issue from a page selection or search configuration issue.

  • For a Core UI login destination, inspect glide.login.home and my_home_navigation_page. Log in again and compare the destination with any preference override.
  • For a customized Workforce Optimization page, inspect the copied variant, conditions, and order. Compare users inside and outside the intended audience.
  • For a newly installed workspace’s search, inspect migration status and the AI Search refresh. Complete indexing, refresh the configuration, and test after another login.

The procedures below concern Brazil; check the settings on your instance and release. Workforce Optimization for ITSM is approaching retirement in a later release. Brazil retains support for it, while hiding it and excluding it from new-instance installations. Use the scheduler section to inspect an existing configuration.

For surrounding experience settings, use UI Builder portal and workspace experience settings. Keep this setup focused on the user’s destination, selected page, and ability to find work.

Configure the Core UI login destination

The admin role is required to set an instance-wide Core UI landing page. The relevant system property is glide.login.home, but changing it is only part of the check. A my_home_navigation_page preference takes precedence. When that preference has no specified user, its value overrides the property for everyone.

  1. Enter sys_properties.list in the filter navigator and open glide.login.home.
  2. Set the value to the intended Core UI destination. For Dashboards Overview, enter $pa_dashboard.do.
  3. For one particular dashboard, copy the destination portion starting with $pa_dashboard.do. Decode encoded characters in that value, including replacing %24 with $.
  4. Select Update, then log out and log back in to check the destination.

If the result differs from the property value, inspect the preference before editing the property again. Include a user with an overriding preference and one without it in the test. This comparison helps explain different landing results without assuming that the property update failed.

When a dashboard is the destination, use setting a default dashboard for that related configuration. Record the selected destination separately from changes to what the dashboard displays.

Copy and configure a Workforce Optimization page

For an existing Workforce Optimization for ITSM installation, page customization requires workspace_admin or ui_builder_admin. Its supplied Next Experience UI Builder pages and variants are read-only. Make a variant copy for customization. Automatic updates to the original do not update the customized copy, so include that copy in later configuration reviews.

  1. Open All > UI Builder and select Manager Workspace.
  2. Choose the required page in the Page menu, such as Landing Page or Work Scheduler.
  3. In Variants, open the original variant’s menu and choose Duplicate.
  4. On the duplicate, open Edit page variant settings. Give it a unique Variant name. Use Page template if the change requires another template, then select Save.
  5. Open Edit conditions. Set the intended conditions in Variant Conditions and the preferred number in Order, then select Done.

Use a name that identifies the copy’s purpose, and describe its intended audience alongside its conditions. Test someone who should receive the copy and someone who should continue to receive another variant. Treat audience selection and layout as separate checks: the right components alone do not establish that the correct people receive the page.

For help planning this configuration, see ServiceNow implementation.

Inspect an existing Work scheduler card

For card customization, the roles are admin, workspace_admin, or ui_builder_admin. For card creation, use workspace_admin or ui_builder_admin. The card entry path differs from the page-copy procedure above: open All > Now Experience Framework > UI Builder, select Manager Workspace in My experiences, select the Pages icon, and choose Work scheduler.

In Content, expand Body (Flex) > Work queue (Flex) > Sidebar. Open the icon in Work item cards default sub-page, then select Body (Flex) > Viewport1. For an existing card, such as Incident default, open the card and duplicate its variant before changing it.

In the duplicate’s Edit conditions settings, use the lowest Order value to make it display in Manager Workspace, then select Save. Only one variant can display for a work item type. Check which variant is selected before investigating a field or component that appears unchanged.

When tracing a previously created card, verify both its path and its work configuration association. The creation flow uses +Add, a card name, an automatically populated Path, and Create. The card name must also be selected in the work configuration’s UX app route field; creation alone does not complete that association.

Card behavior also involves client state parameters, page scripts, the workItem property, event mappings, and display components. Investigate selection first, then the data supplied to the card, then its presentation. Use this sequence to narrow an existing card problem before editing components.

Add workspace search to the acceptance check

A newly installed workspace can need its search application configuration added to AI Search for Next Experience. This procedure requires ais_admin, the AI Search for Next Experience application installed, and the application already enabled. Open All > AI Search > AI Search for Next Experience > Guided Setup for Zing to AI Search Migration.

In Post-Migration Actions, select Get Started. Open the migration tool under When a new Next Experience workspace has been added to your instance and inspect the workspace’s search application status.

  • Migrated: reindex its associated content and publish the workspace’s search profiles and dictionaries.
  • Needs migration: close the status window and select the workspace’s Zing configuration in Search Application Configuration. Run Start Migration, review and accept the changes with Accept All Changes, then select Commit Changes and Index Searchable Content.

Only configurations with Needs migration status are available for selection in that field. A migrated configuration already has a corresponding AI Search configuration. Wait for indexing to finish before moving to the refresh step; the migration job then reaches Indexing Complete.

Follow the migration job state as well as the button sequence. After conversion, the job moves from Pending Conversion to Configuration Converted. Accepting the changes exposes the proposed system-table updates in Changes to Review; committing them moves the job to Configuration Committed. These checkpoints distinguish a converted configuration from committed changes and completed indexing. Do not use a successful conversion as the final search acceptance result.

Return to Guided Setup. In Complete migration to AI Search, select Edit, then open Activate AI Search for all Next Experience search applications with Configure. Select Refresh AI Search for Next Experience. Users must log out and back in before using the newly added workspace search.

Use AI Search global search setup and migration for the broader migration requirement. Record the landing property, overriding preferences, customized variant names and conditions, and workspace search status. Check the resulting journey with a fresh login.

Questions that arise during setup

Why can a variant preview work while the user receives another view?

Preview tests the variant currently open in the editor, including its components, data resources, and dynamic data. To test variant selection through the page path, open the arrow beside Preview and choose Open URL path. Compare that result with the editor preview before changing the layout: these checks answer different questions about the same page.

For appearance work, use Next Experience themes and branding. Check visual changes in the selected variant as well as through the page path, so the review includes the view the user actually receives.

Which search record should I inspect for missing categories or display changes?

Search sources belong to the Next Experience Search Configuration profile, which also holds dictionaries, typo handling, and result improvement settings. Source facet buckets represent linked sources, including Incidents, Knowledge, and Dashboards. Display and refinement settings belong to [AIS] Next Experience Search Configuration, including facets, suggestions, and sort options.

The All bucket covers results from all sources linked to the profile. A bucket label therefore identifies a source grouping rather than a separate page destination. For a category problem, first identify the expected source and its profile link; for a label or ordering problem, inspect the application configuration. This keeps search presentation work separate from changing the set of searchable sources.

Does the search engine property prove workspace search is ready?

No. glide.ui.polaris.ais_ready selects AI Search when true and Zing indexing and text search when false. That selection does not establish the new workspace’s migration or indexing status. Complete the Guided Setup checks and refresh before testing a known record after login.

Can another administrator receive indexing progress notifications?

Yes. Add the relevant users to the migration job’s watch list if they need notifications when indexing starts and finishes. The current user joins that list automatically when a migration job is created or updated. This gives a second administrator progress visibility without requiring that person to start another migration. Use the job’s state to check completion when returning to the form.